Manufacturing method of austenitic stainless steel [section sign] 150 small-specification continuously-cast circular tube blanks
A technology of austenitic stainless steel and a manufacturing method, which is applied in the production field of austenitic stainless steel casting round tube blanks, can solve the problems of complex process, undiscovered continuous casting round tube blanks, and high production difficulty, so as to reduce the number of processes, The effect of reducing production costs and increasing productivity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0064] Steel type: 304
[0065] Furnace number: FK1908-058
[0066] Process flow: electric arc furnace → AOD → LF → continuous casting → finishing → delivery
[0067] The chemical composition of this furnace is shown in Table 8.
[0068] Chemical composition of 304 steel
[0069]
[0070] Table 8
[0071] (2) Electric furnace process
[0072] The charging capacity of the electric furnace is 33.3 tons, and the charging capacity of the primary metallurgical lime is 1550 kg. The amount of carbon in the electric furnace is 2.20%, and the amount of silicon is 1.30%. The tapping temperature of the electric furnace is 1620°C. Before tapping, 50 kg of ferrosilicon powder is added for reduction for 3 minutes. The slag removal process outside the furnace is adopted. The amount of steel tapping is 29.6 tons, and the amount of slag in the electric furnace is less than 200 kg.
[0073] (3) AOD process
[0074] AOD is smelted by double slag method, and the operation process includes...
Embodiment 2
[0111] Steel type: 304
[0112] Furnace number: FK1908-060
[0113] Process flow: electric arc furnace → AOD → LF → continuous casting → finishing → delivery
[0114] The chemical composition of the furnace is shown in Table 15.
[0115] Chemical composition of 304 steel
[0116]
[0117] Table 15
[0118] (2) Electric Furnace Process The loading capacity of the electric furnace is 31.7 tons, and the loading capacity of the primary metallurgical lime is 1540 kg. The amount of carbon in the electric furnace is 2.20%, and the amount of silicon is 1.30%. The tapping temperature of the electric furnace is 1610°C. Before tapping, 60 kg of ferrosilicon powder is added for reduction for 3 minutes. The slag removal process outside the furnace is adopted. The amount of steel tapping is 28.9 tons, and the amount of slag in the electric furnace is less than 200 kg.
[0119] (3) AOD process
[0120] AOD is smelted by double slag method, and the operation process includes: mixing ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com