High-performance inert slurry for grouting of back of shield tunnel segment
A technology of shield tunnel segment and back grouting, applied in solid waste management, climate sustainability, sustainable waste treatment, etc. It can easily control the quality of the slurry, it is not easy to block the pipe, and the proportion of the slurry is simple.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0032] A tunnel in a subway section is constructed. The tunnel is 1343 kilometers long. The shield tunnel passes through mainly silty clay, clay, and silty clay (locally with a lot of silty soil). The soil layer is highly sensitive and easy to settle after being disturbed. The tunnel adopts earth pressure balance shield machine, and the grouting method is synchronous grouting.
[0033] Slurry ratio (kg / m 3 ) is: slaked lime: 90, sodium bentonite: 105, fly ash: 410, fine sand: 780, water: 465, FD-3: 3.
[0034] The slurry performance index obtained by using this ratio is: the density is 1850kg / m 3 , The consistency is 10.9cm, the setting time is 6h48min, the bleeding rate is 0.8%, the fluidity is 118mm, the consolidation shrinkage rate is 0.75%, and the 28-day compressive strength is 5.7MPa.
[0035] Actual effect comparison:
[0036] Applying this embodiment, the surface of the tunnel segment is dry, and there is no obvious leakage of grout and water; the grout has good wat...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com