A preparation process and cladding tube technology, which is applied in the field of zirconium alloy cladding tube preparation technology, can solve the problems such as the preparation process of N36 zirconium alloy finished cladding tube, etc., achieve uniform microstructure, improve comprehensive performance, and process good stability effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] A preparation process for a zirconium alloy cladding pipe, comprising:
[0039] (1) Preparation of extrusion billet
[0040] The N36 zirconium alloy is smelted three times on a vacuum consumable electric arc furnace to prepare a finished N36 zirconium alloy ingot; then a 2500-ton fast forging machine is used to forge the ingot at 1050°C The billet is cut into 450mm long bars by a sawing machine; induction heating is carried out at 1100°C, water quenching is carried out after holding for 20 minutes, and the cooled bars are machined into extruded ingots, is the outer diameter of the tube, is the inner diameter of the tube.
[0041] During water quenching, the volume of cooling water is not less than 40 times the volume of the quenched billet, and the transfer time is controlled within 40s.
[0042] (2) Tube extrusion
[0043]On the 4,000-ton extrusion machine, the extrusion ingot is coated with glass coating, and then the billet is heated to 620°C by induction he...
Embodiment 2
[0054] The difference between this embodiment and Embodiment 1 is that the process parameters of each step in this embodiment are different, and the specific settings are as follows:
[0055] During the extrusion process of the tube billet in step (2), a resistance furnace is used for heating to 680° C., and the extrusion is carried out after 150 minutes of heat preservation.
[0056] During the first pass rolling and intermediate annealing process in step (3), the intermediate annealing temperature after the first pass rolling is 650°C.
[0057] After the final pass of cold rolling in step (5), final recrystallization annealing is performed at 640°C.
Embodiment 3
[0059] The difference between this embodiment and Embodiment 1 is that the process parameters of each step in this embodiment are different, and the specific settings are as follows:
[0060] During the extrusion process of the tube billet in step (2), induction heating is used for heating to 580° C., and extrusion is carried out after 15 minutes of heat preservation.
[0061] During the first pass rolling and intermediate annealing process in step (3), the intermediate annealing temperature after the first pass rolling is 570°C.
[0062] After the final pass of cold rolling in step (5), final stress relief annealing is performed at 450°C.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com