A dry method production process of multi-mode double-sided convex Go pieces
A production process and chess piece technology, which is applied in the field of multi-mode double-sided convex chess piece dry production process, can solve the problems of low efficiency, low yield, unstable temperature of glass water, etc., and achieve the effect of high efficiency and large production volume
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] A multi-mode double-sided convex fine porcelain dry method production process, first select raw glass, zirconium lead ultrafine powder, talcum powder, fluorite, titanium dioxide, borax, feldspar, marble and kaolin, and grind them to 500~800 mesh dry powder, then weigh the dry powder according to the proportion and put it into the boiling granulator, atomize the aqueous solution of the cement and spray it on the dry powder, and mix it with airflow for 1 hour to obtain granules with a diameter of 0.5~1mm Raw materials; when granulating, atomize the aqueous solution of the cementing agent and spray it on the dry powder, and mix it with airflow for 1 hour to obtain a granular raw material with a diameter of 0.5~1mm; then keep the granular raw material mixed with the airflow at room temperature for 2~4 hours;
[0041] The raw material after staying enters the mold forming stage: the mold forming process first puts the cooled granular raw material into the mold for pressing; t...
Embodiment 2
[0044] In the scheme of Embodiment 1, the end surface of the lower mold column 303 of the mold is a horizontal plane structure, the lower end of the upper mold column 102 is provided with a feeding chamber 103, and the inner surface of the feeding chamber 103 is facing A curved arc-shaped structure.
[0045] When laminating the film, firstly the centers of the corresponding upper and lower molds are located on the same vertical line, and after the scraper 4 is used to distribute the material, the scraper 4 is removed, and then the upper mold column 102 is inserted into the corresponding middle mold 2 from top to bottom In the upper through hole 201, there is a gap between the lower end of the upper mold column 102 and the upper end of the lower mold column 302 in the through hole 201, and the gap between the upper and lower mold columns is 2.5mm during lamination; Chess embryo 6, chess embryo 6 forms single-sided convex chess pieces after firing and polishing; the chess embryo...