Non-magnetic ventilation box iron material for nuclear power/hydropower station and preparing method of non-magnetic ventilation box iron material
A technology for ventilation channel steel and hydropower station, which is applied in the field of non-magnetic ventilation channel steel material and its preparation for nuclear power/hydropower station, can solve the problems of reducing hardness and strength, disturbing the uniformity and stability of magnetic field, reducing the efficiency of motor power generation, etc. The austenite structure is stable, the surface is bright without oxidation, and the effect of reducing the magnetic permeability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0052] A high-strength 0Cr18Ni9 stainless steel material adopts the following preparation method:
[0053] 1) Ingredients
[0054] Clean scrap steel, Cr metal, Ni metal, scrap copper and lime;
[0055] 2) Electric arc furnace smelting
[0056] After adding the batching materials into the electric arc furnace one by one, turn on the electricity to heat and melt, check the content of C, Si, Mn, P, S, Cr, Ni, Cu and adjust to Cr 18.5%, Mn 3.0%, Ni 8.5%, C 0.04%, Si 1.0%, P 0.035%, S 0.018%, Cu 2.5%, slagging, when the furnace temperature reaches 1650°C, slag removal and tapping;
[0057] 3) AOD refining furnace
[0058] After the molten steel in the primary furnace is put into the furnace, blowing is carried out by blowing N2+O2 mixed gas into the skull;
[0059] 3.1) The main task in the oxidation period is to reduce the C content to less than 0.04%, and remove slag;
[0060] 3.2) Add an appropriate amount of slagging agent, lime and CaF2 to make reducing slag, with an alka...
Embodiment 2
[0079] A high-strength 0Cr18Ni9 stainless steel material adopts the following preparation method:
[0080] 1) Ingredients
[0081] Clean scrap steel, scrap copper, lime, high carbon ferrochrome, high carbon ferronickel are used as raw materials;
[0082] 2) Electric arc furnace smelting
[0083] Add the batching materials to the electric arc furnace in turn, heat and melt them with electricity, measure the content of C, Si, Mn, P, S, Cr, Ni, Cu to Cr 19%, Mn 4.0%, Ni 9%, C 0.04%, Si 1.0%, P 0.030%, S 0.020%, Cu 2%, slagging, when the furnace temperature reaches 1620°C, slag removal and tapping;
[0084] 3) AOD refining furnace
[0085] After the molten steel in the primary furnace is put into the furnace, blowing is carried out by blowing N2+O2 mixed gas into the skull;
[0086] 3.1) Oxidation period: the main task is to reduce C to less than 0.04% and remove slag;
[0087] 3.2) Reduction period: Add appropriate amount of slagging agent, lime + CaF2 or Al powder, etc., to...
PUM
Property | Measurement | Unit |
---|---|---|
diameter | aaaaa | aaaaa |
tensile strength | aaaaa | aaaaa |
hardness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com