A welding zone and drill pipe technology, applied in the field of oil drill pipes, can solve the problems of large difference in hardness and difficulty in meeting the requirements of hydrogen sulfide stress corrosion resistance in the welding zone, and achieves good impact toughness and hydrogen sulfide stress corrosion resistance in the welding zone. Stable and reliable, the effect of mass production qualified rate is high
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] The above-mentioned batch 95ss steel-type drill pipe body and 110ss steel-type drill joint friction welding and soldering areas are used, and the technology method of the present invention is used to carry out heat treatment:
[0040] Step 1 Insulation 130S; quenching cooling using 12.5% water soluble PAG medium, internal spray compressed air, and intrauterine time 70s;
[0041] Step 2, the second quenching heat treatment, send the drill rod welded to the quenching heating coil position, the quenching heating coil center is aligned with the weld branch side 8 mm; use 60 s time, raised the welding area to 805 ° C, and Insulation 90s; quenching cooling using 12.5% water soluble PAG medium, inner sprayed air, outer shocking time 70s;
[0042] Step three, tempering heat treatment, send the drill pipe welding to the tempering heating coil position, tempering the heating coil center to align the weld bias side 8mm; use 70s time, raise the welding area to 670 ° C, and heat 190...
Embodiment 2
[0048] After the above-mentioned batch 105ss steel-type drill pipe body and 110ss steel-type drill pipe joint friction welding and welding areas, the technology method of the present invention is used to heat treatment:
[0049] Step 1 Insulation 140s; quenching cooling using 12.5% water soluble PAG medium, internal spraying of air, and outer shocking time 70s;
[0050] Step 2, the second quenching heat treatment, send the drill rod welded to the quenching heating coil position, quenching heating coil center align the weld branch side 6 mm; use 70S time, raising the welding area to 820 ° C, and Insulation 100s; quenching cooling uses a water soluble PAG medium having an outer spray concentration, internal spray compressed air, and an outer shower time of 70S;
[0051] Step three, tempering heat treatment, send the drill pipe welding to the backwell heating coil position, tempering the heating coil center align the weld bias side 6mm; use 80s time, raising the welding area to 680...
PUM
| Property | Measurement | Unit |
|---|---|---|
| yield strength | aaaaa | aaaaa |
| yield strength | aaaaa | aaaaa |