A technology for demethyl chlortetracycline and production wastewater, applied in the direction of fermentation, etc., can solve the problems of waste of resources, many suspended solids, complex wastewater components, etc., to reduce the cost of environmental protection treatment, reduce the environmental pollution index, and reduce the efficiency of fermentation production water. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0030] Vitamin B 12 Wastewater 50m 3 .
[0031] Pretreatment: first adjust vitamin B with 10% hydrochloric acid 12 The pH of the production wastewater is adjusted to 3.5, then 2kgε-polylysine is added, and stirred for 60 minutes.
[0032] Adsorption treatment: maintain vitamin B after pretreatment 12 The temperature of the production wastewater is 30°C, 5 kg of nano fullerenes are added, stirring is continued for 80 minutes, and then left to stand for 40 minutes.
[0033] Ceramic membrane filtration: the vitamin B after adsorption treatment 12 Wastewater is filtered through ceramic membranes to obtain primary treated water.
[0034] Ultrafiltration treatment: The primary treatment water is circulated and filtered in a cross-flow mode, the cross-flow flow rate is controlled at 9L / s, the pressure is controlled at 0.1-0.2MPa, and the filtrate temperature is controlled at 30°C; after the ultrafiltration is completed, the secondary treatment water is obtained.
[0035] After ...
Embodiment 2
[0039] Vitamin B 12 Wastewater 50m 3 .
[0040] Pretreatment: first adjust vitamin B with 11% sulfuric acid 12 The pH of the production wastewater was adjusted to 3.6, then 2.5kgε-polylysine was added and stirred for 65 minutes.
[0041] Adsorption treatment: maintain vitamin B after pretreatment 12 The temperature of the production wastewater is 32°C, 6 kg of nano fullerenes are added, the stirring is continued for 85 minutes, and then left to stand for 45 minutes.
[0042] Ceramic membrane filtration: the vitamin B after adsorption treatment 12 Wastewater is filtered through ceramic membranes to obtain primary treated water.
[0043] Ultrafiltration treatment: The primary treatment water is circulated and filtered in the cross-flow mode, the cross-flow flow rate is controlled at 10L / s, the pressure is controlled at 0.1-0.2MPa, and the filtrate temperature is controlled at 35°C; after the ultrafiltration is completed, the secondary treatment water is obtained.
[0044] ...
Embodiment 3
[0048] Vitamin B 12 Wastewater 50m 3 .
[0049] Pretreatment: first adjust vitamin B with 12% hydrochloric acid 12 The pH of the production wastewater was adjusted to 3.7, then 3kgε-polylysine was added and stirred for 70min.
[0050] Adsorption treatment: maintain vitamin B after pretreatment 12 The temperature of the production wastewater is 35°C, 7.5 kg of nano fullerenes are added, stirring is continued for 90 minutes, and then left to stand for 50 minutes.
[0051] Ceramic membrane filtration: the vitamin B after adsorption treatment 12 Wastewater is filtered through ceramic membranes to obtain primary treated water.
[0052] Ultrafiltration treatment: The primary treatment water is circulated and filtered in the cross-flow mode, the cross-flow flow rate is controlled at 11L / s, the pressure is controlled at 0.1-0.2MPa, and the filtrate temperature is controlled at 40°C; after the ultrafiltration is completed, the secondary treatment water is obtained.
[0053] After...