The invention relates to the technical field of underground construction, in particular to a flowing water tunnel closure method, which comprises the following steps of: 1, collecting
geological exploration data of a water inrush tunnel; 2, determining a tunnel closure section for constructing the closure wall; 3,
water pumping and draining holes and injection holes are formed in the two ends of the ground position of the tunnel closure section; 4, a
water flow velocity monitor is arranged downwards in the tunnel at the position of the injection hole, and flowing water in the tunnel is pumped and drained at the position of the
water pumping and draining hole; 5, flowing water in the tunnel is continuously pumped and drained at the
water pumping and draining hole, and when the flowing speed of the flowing water in the tunnel is monitored to be 0 through a
water flow speed monitor,
slag throwing, gravel throwing, concrete throwing and grouting operation is conducted at the injection hole; and 6, after the intercepting wall is constructed and solidified, water pumping operation at the water pumping and draining hole is gradually stopped, and the
water level change at the water pumping and draining hole is monitored. According to the method, the mode of eliminating water power in advance is adopted, so that it is guaranteed that materials thrown and injected into the tunnel can be effectively connected with the roof, and therefore effective construction of the intercepting wall is achieved.