Biomass adsorbent for treatment of heavy metal wastewater and treatment method of heavy metal wastewater
A biomass adsorbent and wastewater treatment technology, which is applied in alkali metal compounds, water/sewage treatment, adsorbed water/sewage treatment, etc., can solve problems such as environmental secondary pollution, organic polymers are difficult to degrade, and non-renewable costs. Achieve the effects of low cost, strong adsorption capacity, and high use value
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0010] The bio-yield of Jute Capsule is high. Generally, after a certain period of planting, the plant height reaches about 30cm, and the young shoots and leaves are picked, dehydrated and dried. When the crop blooms, all leaves and stems are harvested separately, and the leaves and stems are sun-dried separately. .
[0011] Raw material pretreatment: After the young shoots and leaves are picked, preliminary processing and pretreatment must be carried out in time. Main process: picking - dehydration and drying - primary grinding - storage. The stems were harvested before flowering, and the pretreatment of mature stems: dehydration and drying - stem cutting (5cm long) - crushing - primary grinding - storage.
[0012] Preparation of adsorbent: finely grind the above-mentioned pretreated raw materials to 100-150 mesh powder to obtain stem and leaf powder respectively.
[0013] Since the mucus content in the leaf powder is higher and the adsorption capacity is stronger, differen...
Embodiment 2
[0016] Pretreatment of raw materials: After the young shoots, stems and leaves are picked in stages and in batches, preliminary processing and pretreatment must be carried out in time. Main process: picking - dehydration and drying - primary grinding - storage. The stems are harvested at one time before flowering, and the pretreatment of mature stems: dehydration and drying - stem cutting (5cm long) - crushing - primary grinding - storage.
[0017] Preparation of adsorbent material: Mix the above-mentioned pretreated raw materials 3:1 and finely grind to 100-150 mesh powder.
[0018] Heavy metal wastewater treatment: in 1 liter lead (Pb 2+ ) in water with a concentration of 10 mg / L, add 5 grams of the above-mentioned adsorbents that have been finely ground to 100-150 mesh, shake for 30 minutes, and centrifuge to detect the cadmium concentration in the clear liquid, and the lead removal rate reaches 99.5%.
Embodiment 3
[0020] This is an experiment of treating heavy metal copper wastewater with the adsorbent obtained by the preparation method of Example 2.
[0021] Heavy metal wastewater treatment: in 1 liter of copper (Cu 2+ ) concentration is that 5 grams of adsorbent obtained in Example 2 are added in the water of 10 mg / L, shaken for 30 minutes, and centrifuged to detect the clear liquid cadmium concentration, and the copper removal rate reaches 98%.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com