Water-emulsion modified asphalt with creep properties and preparation method thereof
A technology of creep characteristics and modified asphalt, which is applied to building components, building insulation materials, buildings, etc. It can solve the problems of difficulty in repair work, water channeling, and difficulty in finding the source of leakage, so as to reduce construction resistance and facilitate construction , reduce the effect of cohesion
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0027] The raw material ratio of water-emulsion modified asphalt with creep properties is as follows:
[0028] Styrenic thermoplastic elastomer 5% Bitumen 35%
[0029] Fatty acid ester polypeptide condensate 2% Activated calcium carbonate (stearic acid coating) 1%
[0030] Neoprene latex 17% water 30%
[0031] Terpene resin and rosin resin mixture (1:1) 5% Dioctyl phthalate 5%
[0032] The preparation method of above-mentioned modified asphalt is as follows:
[0033] 1) According to the above ratio, add styrene thermoplastic elastomer to 20% of the total amount of asphalt to swell and soften, then heat to 200°C, stir for 60 minutes, enter the colloid mill for 30 minutes, then add the remaining asphalt , to obtain modified asphalt;
[0034] 2) Mix the fatty acid ester polypeptide condensate and water and heat it to 65°C with the modified asphalt, then put it into the colloid mill for 20 minutes;
[0035]3) Neoprene latex (neoprene latex is first mixed with acrylic emulsion...
Embodiment 2
[0043] The raw material ratio of water-emulsion modified asphalt with creep properties is as follows:
[0044] Styrene Butadiene Rubber Thermoplastic Elastomer 15% Bitumen 15%
[0045] Zwitterionic emulsifier imidazoline type 2.5%
[0046] Butyl Rubber Latex 12% Natural Rubber Latex 8%
[0047] Bentonite 1% Dibutyl Phthalate 6%
[0048] Water 36.5% Petroleum resin 4%
[0049] Its preparation method is the same as that of Example 1, wherein the stirring time of step 1) is 120 minutes; the time of step 2) of colloid grinding is 40 minutes.
[0050] Its physical performance test data are as follows:
[0051] Adhesive performance 100% cohesive failure
[0052] Heat resistance 75℃
[0053] Low temperature flexibility -20℃
[0054] Creep performance under shear state 0.5 N / mm.
Embodiment 3
[0056] The distribution ratio of each component of the modified asphalt raw materials is as follows:
[0057] Thermoplastic Polyurethane 7% Bitumen 25%
[0058] Amine emulsifier 3% Bentonite and talc 2%
[0059] Butyl Rubber Latex 15% Water 36%
[0060] Rosin Resin 5% Dibutyl Phthalate 7%
[0061] The preparation method is as in Example 1, wherein the stirring time of step 1) is 100 minutes; the time of step 2) colloid grinding is 30 minutes.
[0062] Its physical performance test data are as follows:
[0063] Adhesive performance: 100% cohesive failure
[0064] Heat resistance: 75℃
[0065] Low temperature flexibility: -20°C;
[0066] Creep performance under shear state 0.1 N / mm.
PUM
| Property | Measurement | Unit |
|---|---|---|
| thermal resistance | aaaaa | aaaaa |
| thermal resistance | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More