A Completion Method of Integrated Intelligent Sand Control Pipe String under Self-spraying Machine Production Conditions
A kind of sand control pipe and intelligent technology, applied in the direction of production fluid, drill pipe, casing, etc., can solve the problems of poor accuracy, low efficiency, single downhole information monitoring point, etc., and achieve the effect of the least production cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0064] An intelligent sand control pipe string integrated with self-spraying machine mining working conditions, including a pipe string, a downhole information monitoring and transmission system, and an downhole intelligent control system.
[0065] The tubing string includes tubing, casing, and riser. The tubing and casing outside the tubing form an annular passage. The flow control device is equipped with a cylindrical screen tube group outside the bottom of the oil pipe, and the cylindrical screen tube group is used to screen impurities.
[0066] The underground intelligent control system includes data processing station, photoelectric signal demodulator, platform command control cable, hydraulic control box and hydraulic control pipeline. The data processing station is connected with photoelectric signal demodulator, and the data processing station is connected with hydraulic control box, hydraulic Pipeline connection, platform command control cable is connected with data p...
Embodiment 2
[0069] An intelligent sand control pipe string integrated with self-spraying machine production conditions, its structure is as described in Embodiment 1, the difference is that the casing includes technical casing and surface casing, the outside of the tubing is technical casing, and the technical casing The outside is a surface casing.
Embodiment 3
[0071] An integrated intelligent sand control pipe string for self-spraying machine mining working conditions, its structure is as described in Embodiment 1, the difference is that the number of permanent sensor groups is five, and the first permanent sensor group is placed at the bottom of the tubing. The second permanent sensor group is placed in the middle of the underground part of the oil pipe, the third permanent sensor group is placed on the top of the underground part of the oil pipe, the fourth permanent sensor group is placed on the top of the above-ground part of the oil pipe, and the fifth permanent sensor The group is placed behind the choke of the production well.
[0072] The location distribution of the permanent sensor group is as follows:
[0073] Ⅰ. The first permanent sensor group is installed above the downhole production layer, with a distance of 20m from the downhole production layer;
[0074] Ⅱ. The second sensor group is installed 600m below the deep ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



