Assembly integral type shear wall connecting node, system with same and process for constructing assembly integral type shear wall connecting node
A technology for connecting nodes and construction techniques, applied to walls, building components, buildings, etc., can solve the problems of reduced total thickness of external walls, external formwork of external scaffolding cannot bear the side pressure of pouring concrete self-weight formwork, etc., to reduce construction difficulty , reduce the amount of high-altitude operations on site, and increase the effect of building usable area
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0101]The anti-cracking mortar is made up of the following components in parts by weight: 30 parts of modified zeolite, 60 parts of Portland cement, 5 parts of sodium tetrapropylene benzene sulfonate, 5 parts of cocoate diethanolamine, 10 parts of aluminum chloride powder, 5 parts of latex powder, 5 parts of quicklime, 1 part of methacrylate, and 100 parts of water. The modified zeolite is ground and pulverized to 80-120 mesh, and then mixed with 30% concentration of acetic acid Soaked in the solution for 1 hour, soaked in oleic acid and then dried. Add modified zeolite, Portland cement, aluminum chloride powder, latex powder, quicklime powder, methacrylate, and water together into the reaction kettle and stir and mix, heat to 50°C and keep it for 1-2 hours to obtain anti-cracking mortar.
[0102] Below is the mechanical performance test and the result thereof about this anti-cracking mortar provided by the inventor:
[0103] (1) Use a standard test mold of 70mm×70mm×70mm to...
Embodiment 2
[0109] According to "Building Construction Formwork Safety Technical Regulations" JGJ162-2014, the standard value of the lateral pressure of the external formwork is:
[0110] f 1 =0.22γ c t 0 beta 1 beta 2 V 1 / 2
[0111] f 2 =γ c h
[0112] gamma c It is the bulk density of newly poured concrete, according to 24KN / m 3 calculate;
[0113] t 0 is the initial setting time of newly poured concrete, t 0 =200 / (T+15)=200 / (25+15)=5;
[0114] beta 1 Regardless of adding retarder, take 1.2;
[0115] beta 2 Slump influence correction factor, take 0.8;
[0116] V is the concrete pouring speed, the storey height is 3 meters, take V=3;
[0117] f 1 =0.22×24×5×1.2×0.85×3 1 / 2 =46.6 KN / m 2 ;
[0118] f 2 =24×3=72 KN / m 2 ;
[0119] Take the smaller value of the two: F=46.6 KN / m 2 (dead load);
[0120] Standard value of vibration load: take 4KN / m 2 (live load);
[0121] Standard value of dumping load: take 2KN / m 2 (live load);
[0122] Constant load control, comb...
Embodiment 3
[0124] Strength check:
[0125] Calculation conditions: the thickness of the external formwork of the cement-based exterior wall is 20mm, the vertical spacing of the pull bolts is 300mm, and the horizontal spacing is 250mm;
[0126] M / W≤f, f takes 25MPa;
[0127] Take the larger value of the bending moment in the X and Y directions, and the maximum value is -1.22KN m / m;
[0128] The calculation width is taken as b, and the plate thickness t=20mm;
[0129] Then: M=-1.22×10 3 b (unit: N / mm)
[0130] W=(bt 2 ) / 6=66.7b (unit: mm 3 )
[0131] M / W=18.29MPa<25MPa
[0132] From the above results, it can be seen that the compressive performance of the STP thermal insulation integrated non-dismantling formwork of the present invention far exceeds that of existing products on the market, and can effectively resist the lateral pressure generated by newly poured concrete, the load of construction and equipment, the load generated by vibrating concrete, and All construction operatio...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 