Comprehensive recycling method for zinc-copper alloy ash
A zinc-copper alloy and recovery method technology, applied in the field of hydrometallurgy, can solve the problem of high production cost, achieve the effects of improving the recovery rate, maximizing the benefit and reducing the production cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0036] Example 1: When an enterprise produces zinc-copper alloy (brass) containing 30% zinc and 70% copper, 50kg of zinc-copper alloy ash (including scum ash) is produced per ton of alloy. They contain 35% zinc, 64.5% copper, 1.2g / ton gold and 8.2g / ton silver. Grind to more than 100 mesh, then according to liquid / solid = 5, use dilute sulfuric acid containing 150g / L of sulfuric acid to adjust the slurry, and at the same time add manganese oxide and hydrogen peroxide according to 10% of the raw material, stir and raise the temperature to 80°C, pre-leaching for 30 minutes Transfer to cooling storage tank. Proceed with the mixing operation. The cooling storage tank is stirred and cooled, and automatically flows into the copper 5-level continuous electrolytic leaching tank through the overflow pipe. The space in each tank is 1.2 cubic meters. When the slurry in the last tank reaches half, the electrolysis starts. Each level is equipped with 4 cathode plates, 6 An anode plate wit...
Embodiment 2
[0037] Example 2: A certain factory recycles waste miscellaneous copper and carries out pyrometallurgy to produce zinc-copper alloy ash and soot ash mixture containing 45.2% copper and 53.8% zinc, using the equipment and technical process of Example 1 to carry out zinc-copper slurry Electrolytic leaching was carried out continuously for 15 days to obtain electrolytic copper containing 99-99.2% of copper, electrolytic zinc containing 97.8-98.2% of zinc, press filter residue containing 0.75-0.9% of copper and 0.42-0.63% of zinc, and the average current efficiency of copper electrolysis was 91.8 %, the average zinc is 84.5%.
Embodiment 3
[0038] Embodiment 3, using a certain enterprise pyrometallurgical copper soot, containing 28.2% copper and 55.6% zinc. Use the equipment and technical process of Example 1 to carry out electrolytic leaching of zinc and copper ore slurry, and continue to produce for 15 days, the quality of electrolytic copper obtained is 98.5-99.2%, the quality of electrolytic zinc is 96.5-98%, and the copper content of filter residue is 0.68-0.85%. , Zinc 0.8-0.95%, the average current efficiency is 90% for copper and 80.3% for zinc.
[0039] In summary, in Examples 1-3, the obtained refined copper contains more than 98% of copper, the obtained rough zinc contains more than 96% of zinc, the electrolytic leaching residue contains less than 1% of zinc and less than 1% of copper, and the raffinate is filtered and returned to use .
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com