Method for industrially processing pig manure by engineering fly maggots to produce fly maggot organic fertilizer
An engineering fly and factory technology, applied in the field of large-scale production of bio-organic fertilizers, can solve the problems of large environmental pollution, large odor diffusion area and high cost, reduce soil heavy metal pollution, reduce investment and operating costs, and reduce construction and maintenance costs. Low cost of use
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] 1. Fly breeding
[0045] Use foam sandwich panels to make a thermal insulation room with a length of 10 meters, a width of 8 meters, and a height of 2.2 meters, and make two long and equal-area thermal insulation rooms with partitions in the middle of the long sides. In each insulation room, metal aluminum mesh is used as the wall and fly resting platform, and stainless steel square tubes are used as the skeleton to make a metal aluminum mesh room with a length of 5 meters, a width of 5 meters, and a height of 2.2 meters. In each aluminum mesh room, use An aluminum mesh with a height of 2.2 meters and a width of 1.5 meters is used as a resting platform for the species of flies.
[0046] The two breeding houses can breed 2.2 million breeding flies, and the eggs produced can handle 5 tons of pig manure.
[0047] The temperature of the fly house is controlled at 28°C, the light is controlled at 10 lux per square meter, and the light time is guaranteed to be 16 hours.
[...
Embodiment 2
[0059] 1. Fly breeding
[0060] The temperature of the fly house is controlled at 26°C, the light is controlled at 5 lux per square meter, and the light time is guaranteed to be 13 hours.
[0061] 2. Larval cultivation
[0062] The collection of fly eggs is the key to the number of larvae. The ovum collection is made by uniformly mixing 60% pig manure, 30% distiller's grains, and 10% wheat bran. The egg collection time is 8:00 am to 5:00 pm every day. Cover with wheat bran with a water content of 70%, and put it in an egg brooding room with a temperature of 15° C. for 10 hours.
[0063] 3. Treatment of pig manure
[0064] The preparation of pig manure, the dry and wet separated pig manure is mixed with 25% distiller's grains, and piled into the pig manure treatment tank as food for fly maggot larvae.
[0065] The entire treatment process is carried out in the fly maggot treatment workshop. The thickness of the pig manure accumulation is 10cm. The pig manure treatment pool i...
Embodiment 3
[0073] 1. Fly breeding
[0074] The temperature of the fly house is controlled at 30°C, the light is controlled at 15 lux per square meter, and the light time is guaranteed to be 19 hours.
[0075] 2. Larval cultivation
[0076] The collection of fly eggs is the key to the number of larvae. The ovum collection is made by uniformly mixing 60% pig manure, 30% distiller's grains, and 10% wheat bran. The egg collection time is 8:00 am to 5:00 pm every day. Cover with wheat bran with a water content of 100%, and put it in an egg brooding room with a temperature of 15° C. for 14 hours.
[0077] 3. Treatment of pig manure
[0078] The preparation of pig manure, the dry and wet separated pig manure is mixed with 25% distiller's grains, and piled into the pig manure treatment tank as food for fly maggot larvae.
[0079] The whole treatment process is carried out in the fly maggot treatment workshop. The thickness of the pig manure accumulation is 10cm. The pig manure treatment pool ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
