Hard river channel side slope ecological slope protection system and construction method thereof
A technology for ecological slope protection and slope protection, applied in the fields of botany equipment and methods, marine engineering, water conservancy engineering, etc. Lake ecosystems and other issues, to achieve the effect of enhancing UV resistance, improving fertilizer and water retention characteristics, and promoting nutrient absorption
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0105] The implementation site of the case is Yuzui Park, Jianye District, Nanjing, Jiangsu Province, with an implementation area of about 20,000m 2 , the slope is a masonry hard river slope, and no vegetation grows on the masonry river slope before construction. The specific construction process is as follows:
[0106] (1) Clean up the slope surface and remove the floating soil on the surface of the slope. The type of the slope is a masonry slope with a slope length of 5m and a slope of 30°;
[0107] (2) The diameter of the anchor rod is 14mm, the total length is 40cm, and the bending length is 10cm. On the other hand, pour planting glue and drive into the anchor rod in sequence;
[0108] (3) After the reinforcement of the anchor bar is completed, hang the two-way geogrid on the anchor bar, 2cm away from the slope, and perform necessary fixing treatment;
[0109] (4) Adopt extrusion pump to evenly spray the nutrient base material that adds water and stir to slope, as base...
Embodiment 2
[0118] The specific construction process is as follows:
[0119] (1) Clean up the slope surface and remove the floating soil on the surface of the slope. The type of the slope is a masonry slope with a slope length of 5m and a slope of 30°;
[0120] (2) The diameter of the anchor rod is 14mm, the total length is 40cm, and the bending length is 10cm. On the other hand, pour planting glue and drive into the anchor rod in sequence;
[0121] (3) After the reinforcement of the anchor bar is completed, hang the two-way geogrid on the anchor bar, 2.5cm away from the slope, and perform necessary fixing treatment;
[0122] (4) Adopt extrusion pump to evenly spray the nutrient base material that adds water and stir to slope, as base material cushion, thickness is 5cm; Described base material cushion is prepared by the raw material of following weight part: mellow soil , 30 parts; sand, 60 parts; slow-release organic fertilizer, 10 parts; vermiculite, 6 parts; rice husk, 10 parts; wate...
Embodiment 3
[0131] The specific construction process is as follows:
[0132] (1) Clean up the slope surface and remove the floating soil on the surface of the slope. The type of the slope is a masonry slope with a slope length of 5m and a slope of 30°;
[0133] (2) The diameter of the anchor rod is 14mm, the total length is 40cm, and the bending length is 10cm. On the other hand, pour planting glue and drive into the anchor rod in sequence;
[0134] (3) After the reinforcement of the anchor bar is completed, hang the two-way geogrid on the anchor bar, 3cm away from the slope, and perform necessary fixing treatment;
[0135] (4) Adopt extrusion pump to evenly spray the nutrient base material that adds water and stir to slope, as base material cushion, thickness is 5cm; Described base material cushion is prepared by the raw material of following weight part: mellow soil , 22 parts; sand, 45 parts; slow-release organic fertilizer, 7 parts; vermiculite, 4 parts; rice husk, 8 parts;
[0136...
PUM
| Property | Measurement | Unit |
|---|---|---|