Crystallizer copper tube with transitional chromium coating and hard chromium coating and production process thereof
A chrome plating and copper tube technology is applied in the field of production technology of copper tubes of crystallizers, which can solve the problems of low production efficiency, large differences in physical properties, and peeling off of the coating, so as to improve the qualification rate and production efficiency, and enhance the anti-shedding performance. , the effect of improving the service life
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0015] Mold copper tubes with transition chromium plating and hard chromium plating are produced according to the following process steps:
[0016] (1) Derusting and degreasing treatment:
[0017] Take the base copper tube for mechanical polishing and derusting, then put it into a degreasing tank containing a neutral oil agent, degrease at a temperature of 50-60°C, take it out after degreasing and wash it with running water, and then put it into a degreasing tank containing 20% Pickle in sulfuric acid pickling tank for 3 to 5 minutes, take it out and rinse with running water;
[0018] (2) Anti-engraving processing:
[0019] Carry out anti-etching treatment on the base copper tube after derusting and degreasing. The composition of anti-etching solution is: chromic anhydride 125g / L, sulfuric acid 1.0g / L, amine corrosion inhibitor 150ml / L; the process conditions of anti-etching treatment For: temperature 45°C, current density 30A / dm 2 , time 2min;
[0020] (3) Prepare electro...
Embodiment 2
[0027] The process step of producing the crystallizer copper tube with transitional chromium coating and hard chromium coating is identical with embodiment 1, and difference is that the plating process condition is:
[0028] Current density: 20A / dm 2
[0029] Plating temperature: Start plating at 65°C, keep warm for 30 minutes, then lower the temperature of the plating solution to 45°C and keep warm within 30 minutes to continue plating;
[0030] Plating time: a total of 4h.
Embodiment 1 example 3
[0032] The process step of producing the crystallizer copper tube with transitional chromium coating and hard chromium coating is identical with embodiment 1, and difference is that processing condition is:
[0033] Plating temperature: Start plating at 75°C, keep warm for 30 minutes, cool the plating solution to 55°C within 1 hour and keep warm to continue plating;
[0034] Current density: 35A / dm during plating at 75°C, during heat preservation and during cooling of the plating solution from 75°C to 55°C 2 , the current density is 30A / dm during the insulation plating at 55℃ 2 ;
[0035] Plating time: a total of 3h.
PUM
Property | Measurement | Unit |
---|---|---|
Current density | aaaaa | aaaaa |
Current density | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com