Foamed asphalt warm-mixing recycled pavement construction method
A technology of foamed asphalt and recycled pavement, applied in the direction of roads, roads, road repair, etc., can solve the problems of uneven distribution of raw materials, affect product strength, easy fiber agglomeration, etc., and achieve the effect of excellent water stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
preparation example Construction
[0047] The preparation method of the whisker reinforcing agent of the present embodiment is:
[0048]S1: Put 5-10 parts of silicon carbide whiskers into 10-20 parts of hypochlorous acid solution, then add 1-3 parts of hexadecyltrimethylammonium bromide, and stir at a speed of 200-240r / min 10-20min, the stirring is completed, and the silicon carbide whisker solution is obtained;
[0049] S2: Add a total amount of 1-5% rare earth modification solution to the silicon carbide whisker solution, stir at a speed of 500r / min for 45-55min, and the whisker modification solution is obtained after the stirring is completed;
[0050] S3: adding 5-10% carbon nanotubes to the whisker modification solution, ultrasonic treatment, washing with water and drying to obtain the whisker enhancer.
[0051] The mass fraction of the hypochlorous acid solution in this embodiment is 1-5%.
[0052] The preparation method of the rare earth modified liquid of this embodiment is: add the cerium nitrate aqu...
Embodiment 1
[0056] A kind of construction method of foamed asphalt warm-mixed regenerated pavement of the present embodiment comprises the following steps:
[0057] Step 1, preparation of ore composite agent: mix 5 parts of albite, 1 part of potassium feldspar, 1 part of nepheline powder, 1 part of bentonite, and 1 part according to the weight ratio, and send it to 400 ° C for 20 minutes of calcination, and the calcination is completed. Cool to room temperature to obtain the ore compound;
[0058] Step 2, selection of raw materials: 5 parts of foamed asphalt, 1 part of ore compounding agent, 0.6 part of modified aluminum-magnesium hydrotalcite, 0.1 part of whisker reinforcing agent, and 0.2 part of foaming agent;
[0059] Step 3, mixing of raw materials: Add the raw materials of step 2 to the mixer in order for mixing, the mixing speed is 100r / min, the mixing time is 30min, and the mixing is completed to obtain the mixed mixing material;
[0060] Step 4, laying treatment: pave 5 cm of gr...
Embodiment 2
[0078] A kind of construction method of foamed asphalt warm-mixed regenerated pavement of the present embodiment comprises the following steps:
[0079] Step 1, preparation of ore compounding agent: mix 10 parts of albite, 5 parts of potassium feldspar, 4 parts of nepheline powder, 3 parts of bentonite, and 2 parts according to the weight ratio, and send it to 500 ° C for 30 minutes, and the calcination is completed. Cool to room temperature to obtain the ore compound;
[0080] Step 2, selection of raw materials: 10 parts of foamed asphalt, 3 parts of ore compounding agent, 0.8 part of modified aluminum-magnesium hydrotalcite, 0.3 part of whisker reinforcing agent, and 0.6 part of foaming agent;
[0081] Step 3, mixing of raw materials: Add the raw materials of step 2 to the mixer in order for mixing, the mixing speed is 400r / min, the mixing time is 40min, and the mixing is completed to obtain the mixed mixing material;
[0082] Step 4, laying treatment: pave 7cm of gravel wi...