The invention discloses a construction process of a refined decoration
coating project. The method comprises the steps that S1, tools are prepared, specifically, an ink fountain, a
tape measure, a
laser gradienter, a construction line, a rubber scraper blade, a steel sheet scraper blade, an iron trowel, a
putty supporting plate, an internal and external corner polisher, a plane polisher, a special stirrer, an aluminum
alloy guiding rule and a horse-shaped stool are prepared. Systematic base layer treatment and interface reinforcement are conducted, specifically, the problems of hollowing and
cracking caused by
stress concentration at the junctions of different materials are solved through the
laser level meter precise paying-off, concrete wall surface glue rolling and
glass fiber net hanging technologies, the base layer
bonding strength is enhanced, and the overall stability of the wall surface is improved; and high-precision flatness control is conducted, specifically, a screeding and erecting method is combined with a plastering
gypsum layered batch scraping technology, secondary leveling is conducted in cooperation with caulking
gypsum, the perpendicularity and flatness error of the wall face is controlled within plus or minus 1 mm, the flatness error of a ceiling is smaller than or equal to 10 mm, and the acceptance standard of high-grade fine decoration is met.