A technology of die steel and chromium steel, which is applied in the field of chrome steel die steel and its heat treatment process, can solve the problems of high production cost, insufficient fine lines, short service life of the die, etc., and achieves reduced material cost, good quenching stability, The effect of saving usage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] A chrome-steel-based die steel, the die steel includes: carbon C1.3%, chromium Cr11.5%, molybdenum Mo05%, vanadium V0.5%, nickel Ni0.2%, tungsten W0.5% by weight percentage , silicon Si0.2%, manganese Mn0.2%, cobalt Co0.5%, niobium 0.3%, titanium 0.3%, rare earth elements 0.05%, sulfur S≤0.015%, phosphorus P≤0.02%, and the balance is iron Fe.
[0041] The heat treatment process of the above-mentioned chromium steel mold steel can be carried out in the following steps:
[0042] (1) Preheating for the first time, the preheating temperature is 550-650°C, and the preheating time is 60 minutes;
[0043] (2), the second preheating, the second preheating temperature is 800 ~ 900 ℃, and the preheating time is 45 minutes;
[0044] (3) Quenching heating, the quenching heating temperature is 1000-1040°C, the quenching time is: 25+material thickness / 2 (minutes), and then cooled in a salt bath; the salt bath cooling is graded and kept warm, and the holding temperature is 400-450°C ...
Embodiment 2
[0048] A chromium-steel-based die steel, which comprises: carbon C1.25%, chromium Cr11.3%, molybdenum Mo0.4%, vanadium V0.4%, nickel Ni0.1%, tungsten W0. 3%, silicon Si0.1%, manganese Mn0.1%, cobalt Co0.4%, sulfur S≤0.015%, phosphorus P≤0.02%, and the balance is iron Fe.
[0049] (1) Preheating for the first time, the preheating temperature is 550-650°C, and the preheating time is 60 minutes;
[0050] (2), the second preheating, the second preheating temperature is 800 ~ 900 ℃, and the preheating time is 45 minutes;
[0051] (3) Quenching heating, the quenching heating temperature is 1000-1040°C, the quenching time is: 25+material thickness / 2 (minutes), and then air-cooled to room temperature;
[0052] (4) For the first tempering, the tempering temperature is 200-220°C, the tempering time is 2.5 hours, and then air-cooled to room temperature;
[0053] (5) Tempering for the second time, the tempering temperature is 200-220°C, the tempering time is 2.5 hours, and then air-cool...
Embodiment 3
[0055] A chrome-steel-based die steel, which comprises: carbon C1.35%, chromium Cr12.0%, molybdenum Mo0.6%, vanadium V0.6%, nickel Ni0.3%, tungsten W0. 8%, silicon Si0.4%, manganese Mn0.4%, niobium 0.3%, titanium 0.3%, cobalt Co0.6%, rare earth elements 0.05%, sulfur S≤0.015%, phosphorus P≤0.02%, and the rest is iron Fe.
[0056] The heat treatment process of the above-mentioned chromium steel mold steel can be carried out in the following steps:
[0057] (1) Preheating for the first time, the preheating temperature is 550-650°C, and the preheating time is 60 minutes;
[0058] (2), the second preheating, the second preheating temperature is 800 ~ 900 ℃, and the preheating time is 45 minutes;
[0059] (3) Quenching heating, the quenching heating temperature is 1000-1040°C, the quenching time is: 25+material thickness / 2 (minutes), then oil cooling is adopted, and the oil cooling is graded for heat preservation, and the heat preservation temperature is 200-250°C.
[0060] (5) ...