The invention discloses a
subject name, the technical scheme of which is a
road construction method with steep slopes, comprising the following steps: step 1, road segmentation; 2, clearing of road table; 3, excavation of a roadbed; 4, roadbed fill; 5, fixation of a plurality of steel bars horizontally in the same direction as the width of the road at the bottom of the diaphragm of the second section and the fourth section with iron wires; 6,
welding of a plurality of short reinforcing bars and a connecting plate between two adjacent partition plates for fixing; Step 7, excavation of drainageditches on both sides of the road through an
excavator; 8, paving of a road base layer; 9, water prinkling on the road base for mainteance; 10, paving of a stable layer; 11, water prinkling a stabilizing layer for mainteanc ; 12, placement of a plurality of horizontal steels on the upper part of the stable layer; 13) pavement base construction; 14, paving of
asphalt mixture. The invention solves the technical problem of how to ensure the stability of the
steep slope road construction.