Highly anti-rutting emulsified asphalt mixture for treating rutting on asphalt pavement and preparation method of emulsified asphalt mixture
A technology for emulsified asphalt and asphalt pavement, applied in the field of maintenance and road construction, can solve the problems of poor durability, large amount of milling, short service cycle, etc., and achieve the effect of reasonable formulation, improved bonding performance and good compatibility.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0041] Component A: Take 96g of cationic emulsifier (dodecyltrimethylammonium bromide), 1400g of water, and 90g of hydrochloric acid to prepare a soap solution. The temperature of the soap solution is controlled at 50°C. -702400g heated to 155°C, and processed with the above soap solution in a colloid mill for 1.5min to prepare modified emulsified asphalt, colloid mill speed: 10000rpm; take 4000g of cooled cationic modified emulsified asphalt prepared by the above method, and 30g of water reducer (terpolymeric acid), 50g defoamer (octamethylcyclotetrasiloxane), and 90g water-based acrylic resin were stirred in a mixer for 3 minutes to obtain component A, and the stirring speed was controlled to 300rpm;
[0042] Component B: 5000g of PO42.5 cement, 1500g of quartz sand with a particle size of 0.15-0.25mm, 1g of calcium oxide, 4000g of basalt with a particle size of 10-13mm, 4000g of basalt with a particle size of 5-10mm, and basalt with a particle size of 0-3mm 5000g is stirred...
Embodiment 2
[0045] Component A: Select 24g of anionic emulsifier (cis-9-octadecenoic acid salt) and 380g of water to make a soap solution. The temperature of the soap solution is controlled at 55°C. SBR modified heavy traffic road asphalt AH-90600g Heating to 150°C, and processing 2.5min with the above soap in a colloid mill to prepare modified emulsified asphalt, colloid mill speed: 8000rpm; take 1000g of cooled anion modified emulsified asphalt prepared by the above method, 10g of water reducer (amino Sulfonate polymer synthetic resin), 15g defoamer (polyethoxylated fatty alcohol), 90g water-based epoxy resin, stirred in a mortar mixer for 3min to obtain component A. The control speed is 300rpm.
[0046] Component B: 1000g of PO52.5 cement, 500g of quartz sand with a particle size of 0.15-0.25mm, 1g of aluminum powder, 2500g of basalt with a particle size of 10-13mm, 3000g of basalt with a particle size of 5-10mm, and basalt with a particle size of 0-3mm 2000g is stirred evenly in the ...
Embodiment 3
[0049]Component A: Select 75g of non-ionic emulsifier (polyoxyethylene ether of alkylphenol), 2000g of water, and prepare soap liquid. The temperature of soap liquid is controlled at 50°C, and the rubber powder modified heavy traffic road asphalt AH-501800g Heating to 165°C, and processing 2.5min with the above-mentioned soap solution in a colloid mill to prepare modified emulsified asphalt, the colloid mill speed: 9000rpm; take the cooled 5000g non-ionic modified emulsified asphalt prepared by the above method, 50g water reducer ( β-naphthalene sulfonate formaldehyde condensate), 40g defoamer (fatty alcohol polyoxyethylene ether), 105g water-based acrylic resin and stir in a mixer for 3 minutes to obtain component A. The control speed is 300rpm.
[0050] Component B: 4000g of PO32.5 cement, 2500g of quartz sand with a particle size of 0.15-0.25mm, 1g of calcium aluminum sulfate, 3500g of basalt with a particle size of 10-13mm, 4000g of basalt with a particle size of 5-10mm, a...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Particle size | aaaaa | aaaaa |
| Particle size | aaaaa | aaaaa |
| Particle size | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More