Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

37 results about "Facility planning" patented technology

System and method for managing network configuration data, computer program for same

In a system for managing the information for the network components including hardware devices such as routers, switches, and the like, an apparatus and method is disclosed, which allows not only the current network configuration information but also the future network configuration information to be stored, wherein the future network configuration information reflects the future facilities planning considerations and may be derived from the current network configuration information. The system includes a directory server on which a current map tree and a temporary map tree are stored, wherein the current map tree contains the current network configuration information organized into a tree structure, and the temporary map tree only contains the information for any components, organized into a tree structure, for which the configuration changes are expected to occur in the future. The future network configuration information may be obtained by merging the information in the current map tree together with the information in the temporary map tree that may be setup up to any future time as specified. The system further includes means that responds to the request for the network configuration information that is applicable to any future time from any external requester, such as applications or users, for issuing a request to search the trees including the directory entries that reside in the current map tree and temporary map tree stored in the directory server and obtaining the configuration information as requested, and means for merging the configuration information obtained from the current map tree together with the temporary map tree to generate the network configuration information that is applicable to the particular time and returning the generated network configuration information to the requester.
Owner:RAKUTEN GRP INC

An electric vehicle fast charging station site selection and sizing method based on a travel probability matrix

PendingCN109711630AAccurate and scientific planning resultsAddress developmental constraintsInternal combustion piston enginesForecastingDistribution matrixFast charging
The invention discloses an electric vehicle fast charging station site selection constant volume method based on a travel probability matrix, and relates to the technical field of electric vehicle public charging facility planning, and the method comprises the steps: obtaining road network parameters in a planning area; obtaining an OD travel matrix according to different types of electric vehicleroad traffic flow backstepping so as to obtain an OD travel probability matrix; Monte Carlo method, OD travel probability matrix and improvement speed. The flow model simulates a driving track of theelectric vehicle in one day to obtain a quick charge demand space-time distribution matrix in one day; the space-time distribution matrix of the fast charging demand is analyzed and optimized according to the site selection and constant volume optimization model of the charging station; the charging station position and the charger configuration number are obtained; according to the invention, the electric vehicle fast charging demand space-time distribution matrix is utilized, the Voronoi diagram is adopted to divide the service range of the charging station, the optimal position of the charging station is determined by improving the particle swarm algorithm, and the capacity of each charging station is optimized by utilizing the queuing theory, so that the planning result of the electric vehicle fast charging station is more accurate and scientific.
Owner:ZHENGZHOU UNIV

Method for selecting and optimizing typical scenes in electric automobile charging facility planning

The invention discloses a method for selecting and optimizing typical scenes in electric automobile charging facility planning, which comprises the steps of building an improved Floyd algorithm based electric automobile locating and sizing model; building a charging facility planning scheme evaluation system; aggregating electric automobile charging demands from a time dimension and a space dimension based on a K-means clustering algorithm, and screening or construction a typical day; solving a corresponding charging facility planning scheme; and evaluating the construction of the typical day according to the charging facility planning scheme evaluation system. According to the invention, traffic factors such as road congestion are considered, so that actual situations are reflected more comprehensively. The most representative one or more typical days can be acquired according to the time-space two-dimension K-means clustering based planning typical day construction method, typical charging demand scenes are reflected, and the calculation amount of a planning problem is significantly. Through controlling the number of clustering centers, evaluation indexes of the planning scheme can be improved, and the satisfaction degree of users is improved.
Owner:SOUTHEAST UNIV

Electric automobile public charging facility planning method

The invention relates to an electric automobile public charging facility planning method, more specifically, relates to an electric automobile public charging facility planning method. According to the construction type difference and the characteristics of the electric automobile, the charging piles are divided into two types of high-power quick-charging piles and small-power slow-charging piles;the charging behavior characteristics of all types of electric automobiles are analyzed, an electric automobile charging model is adopted, the proportion of the charging time occupied by the public charging requirement and the self-charging requirement is distinguished, the total demand of all types of electric automobiles on the public charging amount is calculated, and through the combination of the charging capabilities of the quick/slow charging piles, the number of charging piles contained in an integrated charging station and the number of scattered charging piles, the total demand of an integrated city charging station and scattered public charging piles are calculated, and furthermore, the setting sites and quick/slow charging pile number of electric automobile public charging facilities are planned according to the actual construction conditions of the local public charging facilities and the principle of demand priority.
Owner:GRID POWER PLANNING & RES CENT OF GUANGDONG GRID POWER CO LTD +1

Three-dimensional analog simulation system of instrument flight program

ActiveCN101968823ARealize 3D positioning functionFlexible implementation of changesSpecial data processing applicationsData platformFacility planning
The invention discloses a three-dimensional analog simulation system of an instrument flight program. The system comprises a multi-airport database, a chart element data management module, a chart element three-dimensional generation functional module, a three-dimensional flight course roaming module, a traffic flow analogue module, a navigation station shielding evaluation module, a keyhole markup language (KML) result data platform, a goggle geotechnical platform, a three-dimensional dynamic representation module and a geographic information system technical platform. The simulation system provides three-dimensional visualization technology for representing vision and instrument flight program design, so that 3D dynamic demonstration is formed by navigation elements designed by a two-dimensional diagram, works such as planning, demonstration, reporting and the like of related works such as airspace planning, vision, instrument flight program design, airport construction, navigation facility planning, site selection and the like are vivid and intuitive, the cost and the time cost of site exploitation, planning, airspace coordination, navigation facility shielding evaluation, airport clearance protection and evaluation and the like are reduced, and further the safety guard capacity of related works of civil aviation is improved.
Owner:沈阳广通测绘设计有限公司

Parking supply-demand regulate and control coefficient based parking facility supply level prediction method

ActiveCN104933480ARealize differentiated supplyPlay a regulatory roleForecastingPredictive methodsFacility planning
The invention discloses a parking supply-demand regulate and control coefficient based parking facility supply level prediction method. When in urban parking facility planning, according to parking supply-demand regulate and control coefficients of different parking policy zones, the supply levels of the parking facilities of different middle traffic zones are determined. The method specifically comprises following steps of proposing parking supply-demand regulate and control coefficients according to the parking policy zones; computing parking facility total demand level of a planning area; computing the parking facility demand level of each middle traffic zone; balancing the parking facility total demand-supply level in the planning area layer according to the parking supply-demand regulate and control coefficients, and determining the parking facility supply level of each middle traffic zone; and computing the supply level of different types of parking facilities of different middle traffic zones. Through adoption of the method, the purposes of land utilization and traffic flow space-time distribution regulate and control by the parking facilities can be realized. The method is simple and practical, and has strong operability and effectiveness.
Owner:JIANGSU INST OF URBAN PLANNING & DESIGN

Multifunctional power field transmitting facility

The invention discloses a multifunctional power field transmitting facility, and mainly relates to the field of power facility planning. The multifunctional power field transmitting facility comprises rectangular frames hooked and hung on cables. Triggering baffles are hinged to the positions of openings of the rectangular frames. The inner ends of the triggering baffles press rubber clamping blocks with compression springs. A connecting plate is arranged below the rectangular frames and provided with a feeding platform. The feeding platform is provided with rubber belt tracks used for clamping and pushing the cables. Bearing pulleys are arranged below the connecting plate, the cables are wound around the bearing pulleys, the lower ends of the cables are wound around fixed pulleys, and the cables are provided with a lifting hopper. The fixed pulleys are installed on a fixing plate, and inserting columns are arranged on the bottom face of the fixing plate. The multifunctional power field transmitting facility further comprises fixing columns matched with the inserting columns. Spearheads capable of ascending and descending are arranged at the bottom ends of the fixing columns, and trundles are arranged on one sides of the fixing columns. The multifunctional power field transmitting facility has the beneficial effects that the cables can be stably pushed from the high position, conveying of objects and the cables between the high position and the ground can be finished, and the self-conveying function is achieved as well.
Owner:STATE GRID CORP OF CHINA +1

Urban and rural public service facility planning technical application system and method based on mobile phone APP

The present invention discloses an urban and rural public service facility planning technical application system and method based on a mobile terminal APP. The urban and rural public service facility planning technical application system based on the mobile terminal APP comprises mobile phones, a server and backstage management clients, wherein each mobile phone is provided with a wireless communication network and an APP data inquiry module and an APP analog computation module are embedded into the mobile phone; the server is connected with the mobile phones by a wireless communication network protocol; the backstage management clients are in communication connection with the server and are used for carrying out daily maintenance and data management; and the server comprises a database module, a calculator, a processor and the like. Functional modules of standard inquiry, analog computation, other case applications and the like are integrated, so that the public service facility planning standard is more convenient and applicable to apply; on the aspects of design of a computational formula, standardization of a computing program and application of a computed result, the system and the method are abutted with the new requirements of each industrial competent department for configuration of public service facilities, so that the urban and rural planning process is more transparent and is easier to check; and the system and the method have a great promoting effect of promoting equalization of basic public services in the urban and rural planning process.
Owner:重庆市规划设计研究院

Method for defining service range of urban public service facilities

The invention relates to the technical field of public service facility planning management. The invention particularly relates to a method for defining the service range of urban public service facilities. The method comprises the following steps: a data preparation step, a facility information table construction step, a population information table construction step, an edge set population-facility list construction step, a public service facility service range generation step, a public service facility force range generation step and a public service facility range generation step. According to the method, a bipartite graph network model of a population point-facility point is constructed; each population point corresponds to a plurality of selectable facility points; each facility point can provide service for a plurality of population points; and the probability value of each facility selected by each population point is calculated by further researching the game strategy of the network model, and the division of space classification is completed by selecting the maximum probability value, so that the relatively accurate facility service range is obtained, and the technical support is provided for optimizing the planning and layout of the facilities, and the efficient utilization of public facility resources is promoted.
Owner:东莞市城建规划设计院

Functional facility configuration method based on community microenvironment and outdoor comfort simulation

ActiveCN112883660AImprove comfortAchieving Suitability TransformationDesign optimisation/simulationSimulationEngineering
The invention relates to the field of community functional facility planning, and particularly discloses a functional facility configuration method based on community microenvironment and outdoor comfort simulation. Microclimate parameters such as temperature and humidity, wind speed and average radiation temperature of an open space of a community are generated through microenvironment simulation, and a physiological equivalent temperature is further obtained through human body physiological index simulation; dividing the outdoor activity site of the community into a suitable activity area, a more suitable activity area and an unsuitable activity area according to the thermal sensation accumulated duration corresponding to the physiological equivalent temperature; according to the influence degree of the space carrier of the functional facility on the microenvironment parameters, the optimization of the unsuitable or more suitable activity area and the space comfort of the building roof is realized. According to the method, three types of outdoor activity areas are divided according to physiological equivalent temperature values through cell-scale microenvironment simulation, and optimization of microclimate of a relatively suitable activity area is realized by establishing four space carriers, so that the microclimate is converted into a suitable activity interval, and the activity duration of outdoor comfortable feeling of residents is prolonged.
Owner:CHONGQING JINKE ARCHITECTURAL DESIGN & RES INST CO LTD

Planning method for electric vehicle charging facilities in residential quarters

The invention discloses a method for planning electric vehicle charge facilities in a residential area. The method includes steps of determining charge demand of users and the capacity of each charge facility according to travel laws and charge power of the charge facility; determining the connection position of each electric vehicle charge facility in a power distribution network according to a principle that the influence of electric vehicle charge on voltage of the power distribution network is minimized, and determining the charge capacity of each load point. The method has the advantages that travel and charge behavior of the users are simulated by a Monte Carlo simulation process via a probability distribution model of the travel laws of the users, and the optimal quantity of the charge facilities and the optimal capacity of each charge facility are acquired by means of iterative computation under the condition that the charge demand of the users is met, so that the total capacity of the charge facilities is determined; electric vehicle charge loads are connected into the power distribution network according to the structure of the specific power distribution network, iterative computation is carried out, and a group of optimal node capacity vectors is searched to minimize the influence of access of the electric vehicle charge facilities to the power distribution network, so that joints of the electric vehicle charge facilities and the power distribution network and the charge capacity of each joint can be determined.
Owner:INST OF ELECTRICAL ENG CHINESE ACAD OF SCI

Functional facility configuration method based on community microenvironment and outdoor comfort simulation

ActiveCN112883660BImprove comfortAchieving Suitability TransformationDesign optimisation/simulationSimulationRadiation temperature
The invention relates to the field of residential functional facility planning, and specifically discloses a functional facility configuration method based on residential micro-environment and outdoor comfort simulation. The microclimate parameters such as temperature and humidity, wind speed and average radiation temperature of the open space of the community are generated through the microenvironment simulation, and the physiological equivalent temperature is obtained by further combining with the physiological indicators of the human body. Suitable activity area, more suitable activity area and unsuitable activity area; according to the influence degree of the space carrier of functional facilities on the microenvironment parameters, realize the optimization of the unsuitable or more suitable activity area and the comfort of the building roof space. The invention divides three types of outdoor activity areas according to the physiological equivalent temperature value through the microenvironment simulation of the cell scale, and realizes the optimization of the microclimate of the more suitable activity area by establishing four kinds of space carriers, so as to transform it into the suitable activity area , in order to prolong the activity time for residents to feel comfortable outdoors.
Owner:CHONGQING JINKE ARCHITECTURAL DESIGN & RES INST CO LTD

A multi-functional power on-site transmission facility

The invention discloses a multifunctional power field transmitting facility, and mainly relates to the field of power facility planning. The multifunctional power field transmitting facility comprises rectangular frames hooked and hung on cables. Triggering baffles are hinged to the positions of openings of the rectangular frames. The inner ends of the triggering baffles press rubber clamping blocks with compression springs. A connecting plate is arranged below the rectangular frames and provided with a feeding platform. The feeding platform is provided with rubber belt tracks used for clamping and pushing the cables. Bearing pulleys are arranged below the connecting plate, the cables are wound around the bearing pulleys, the lower ends of the cables are wound around fixed pulleys, and the cables are provided with a lifting hopper. The fixed pulleys are installed on a fixing plate, and inserting columns are arranged on the bottom face of the fixing plate. The multifunctional power field transmitting facility further comprises fixing columns matched with the inserting columns. Spearheads capable of ascending and descending are arranged at the bottom ends of the fixing columns, and trundles are arranged on one sides of the fixing columns. The multifunctional power field transmitting facility has the beneficial effects that the cables can be stably pushed from the high position, conveying of objects and the cables between the high position and the ground can be finished, and the self-conveying function is achieved as well.
Owner:STATE GRID CORP OF CHINA +1

A parking facility supply forecast method based on parking supply and demand regulation coefficient

The invention discloses a method for predicting the supply of parking facilities based on the regulation coefficient of parking supply and demand. When planning urban parking facilities, the supply of parking facilities in different traffic areas is determined according to the regulation coefficients of parking supply and demand in different parking policy zones. Specifically, It includes the following steps: put forward the regulation coefficient of parking supply and demand according to the parking policy zone; calculate the total demand for parking facilities in the planning area; calculate the demand for parking facilities in each traffic center area; calculate the total supply and demand of parking facilities at the level of the planning area according to the regulation coefficient of parking supply and demand Determine the supply of parking facilities in each traffic center; calculate the supply of different types of parking facilities in each traffic center. The invention can achieve the purpose of giving full play to the role of the parking facilities in controlling land utilization and traffic flow time and space distribution. The invention is simple and practical, and has strong operability and effectiveness.
Owner:JIANGSU INST OF URBAN PLANNING & DESIGN
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products