The application discloses a contaminated soil
replacement method and a light replacement structure, and belongs to the technical field of building replacement, which solves the problems of the existing technology, such as treating the symptoms but not the
root cause, large amount of concrete, and poor durability of the protective layer. The method comprises the following steps: contaminated
soil treatment, frame
assembly (integral type / modularization), block component installation (integral / layering), concrete pouring (layering / integral), and subsequent treatment. The frame and the block component form a
protective barrier. Layered pouring requires
rough surface treatment, and integral pouring is provided with anchoring components. The structure comprises a frame, a block component (light filling block combined with a U-shaped hook connecting piece), and optional anchoring components (two-way expansion anchor rods). The application replaces 30%-50% of the concrete with light blocks, reduces the load and cost, and improves the durability of the protective layer by more than 20%. The application can block
pollution and
erosion, is suitable for different construction scenes, and is convenient to operate.