Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

4results about How to "Increase settling velocity" patented technology

A construction site dust handling facility

This utility model relates to the field of dust control technology, and in particular to a dust control facility for construction sites, including a handcart. The handcart is equipped with a dust control mechanism for dust control. The dust control mechanism includes: a spray assembly, including a frame fixed on the handcart, a circular plate fixed to the front end of the frame, an arc-shaped tube fixed to the front end of the circular plate via a fixing bracket, a plurality of circumferentially distributed atomizing nozzles installed at the front end of the arc-shaped tube, a cylinder seat fixed to the front end of the circular plate, and a fan blade installed inside the front end of the cylinder seat; a water supply assembly, mounted on the frame and used for water supply; and a drive device, mounted on the frame and used for power supply. Through the circumferential layout of the arc-shaped tube and the circumferential distribution of the atomizing nozzles, the water mist spray range expands in a ring shape. Combined with the airflow propulsion effect of the fan blades, the dust control facility significantly improves the capture efficiency and settling speed of airborne dust.
Owner:GUANGZHOU ZHONGCHANGLIAN AGRICULTURAL TECHNOLOGY CO LTD

Wastewater treatment device based on resource utilization of electrolytic lead

PendingCN122586307AEnsure transparencyGuaranteed filtration accuracy
The application relates to the technical field of sewage treatment, in particular to a wastewater treatment device based on electrolytic lead resource utilization. The device comprises a mounting base, a sewage treatment box body is fixedly installed at the upper end of the mounting base, a sealing plate is installed at the upper end of the sewage treatment box body, a distribution box is fixedly installed at the front end of the sewage treatment box body, and a water inlet pipeline is connected to the front end of the sewage treatment box body. A pretreatment pool is arranged in the sewage treatment box body, a reaction pool is arranged in the sewage treatment box body, the reaction pool is in interpenetration with the pretreatment pool through a water conveying pipeline, an anaerobic pool and an aerobic pool are arranged in the sewage treatment box body, a filter core body is fixedly installed in the reaction pool, and the reaction pool is in interpenetration with the anaerobic pool and the aerobic pool through a pipeline on the filter core body. The automatic cleaning filter core, the hydraulic linkage filter screen cleaning and the stirring disturbance water body are matched, the device can effectively prevent blockage and ensure smoothness, and the electrolytic lead wastewater precipitation purification effect and operation stability are improved.
Owner:HUNAN ANGZHU ENVIRONMENTAL PROTECTION TECHNOLOGY CO LTD

Chute capable of automatically and rapidly discharging ore and selecting gold

The utility model belongs to the technical field of gulch gold beneficiation equipment, and particularly relates to an automatic rapid ore discharging and gold beneficiation chute. During normal production, ore pulp flows out of a chute body through an ore discharging opening cover plate, when ore discharging is needed, an ore discharging and flushing switch is turned on, the switch controls thin air cylinders on the two sides to support and connect a lifting plate at the same time, and the thin air cylinders are connected with the lifting plate; when the lifting plate is lifted, the vortex plate ore storage grid connected to the lifting plate and the ore discharge port cover plate are also lifted together, and heavy minerals on the bed surface flow into the ore discharge hopper through the ore discharge port reserved in the lower portion of the pressing plate under the scouring of large water flow of the ore discharge flushing pipe and are finally collected into a recovery container through the ore discharge pipe. The whole ore discharge is automatically completed, the process is automatic, rapid and convenient, and the ore discharge can be completed within 5-10 minutes, so that the ore discharge time is greatly saved, the production time is prolonged, the labor intensity is reduced, and the number of workers is reduced.
Owner:李树森

A dust suppression device after blasting in an open-pit mine

ActiveCN224506603UImprove adhesionincrease settling velocity
This utility model relates to the field of mining blasting technology and provides a dust suppression device after open-pit mine blasting. The device includes a main body with a water tank fixedly installed inside. A water injection pipe is fixedly embedded in the right side of the water tank, and the outer surface of the water injection pipe is fixedly embedded in the rear side of the main body. It also includes a feeding component fixedly embedded inside the main body. In use, the design of the feeding tray and stirring blade structure allows for precise control of the dust suppressant dosage each time, while effectively mixing the dust suppressant and water to ensure a fully uniform distribution. This enhances the adhesion of the sprayed water mist particles, enabling them to adhere more effectively to the surface of fine dust particles, increasing the settling velocity of the dust particles. This improves the settling velocity of fine particles and reduces the likelihood of them being blown away by the wind.
Owner:ORDOS PANHONG BLASTING CO LTD