Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

263results about How to "Fast forward" patented technology

SDN-based publishing and subscribing system and message forwarding method

The embodiment of the invention provides a SDN-based publishing and subscribing system and a message forwarding method. The system comprises an interface layer, a routing layer and a forwarding layer;the interface layer is used for providing a publishing interface and a subscribing interface, the publishing interface is used for providing a publishing access point for calling the system for a user, and the subscribing interface is used for providing a subscribing access point for the user; the routing layer is used for, according to a network topology information, calculating an optimal pathfrom a publishing node to a subscribing node through an optimal path algorithm based on a Steiner tree; and the forwarding layer is used for, according to information of a flow table, matching a publishing message or a subscribing message with message queues of different priorities and forwarding the message, and dynamically allocate a queue bandwidth according to a queue bandwidth adjustment algorithm. In the embodiment of the invention, a feature of separation of control and forwarding of the SDN can be applied to the publishing and subscribing system, based on the advantages of the SDN, rapid forwarding of the publishing and subscribing messages is realized, a real-time property is improved, and meanwhile, a QoS (Quality of Service) and a resource utilization ate are improved.
Owner:BEIJING UNIV OF POSTS & TELECOMM

Multi-station and multi-time hydraulic drawing press and processing method thereof

The invention discloses a multi-station and multi-time hydraulic drawing press and a processing method thereof. The multi-station and multi-time hydraulic drawing press comprises an upper cross beam (2), a lower cross beam (9), upright posts (3), a machine base (10) and a controller, wherein three drawing units are at least arranged between the upper cross beam (2) and the lower cross beam (9); each drawing unit corresponds to a station; the upright posts (3) of the drawing units on the two sides are of three-column structures which are in the distribution of a right triangle; the upright posts (3) of the middle drawing unit are of a two-column structure which is in the distribution of a diagonal line; the upper ends of all the upright posts (3) are fixed with the upper cross beam (2) and the lower ends are fixed on the lower cross beam (9); and a manipulator moving mechanism is arranged between the drawing units and the rear upright post (3). Through the control of the controller, a workpiece is sequentially transferred from the first station to the last station, and a multi-time continuous drawing process that a plate is drawn to form the workpiece is automatically finished. The multi-station and multi-time hydraulic drawing press has the advantages of simple and compact structure, small occupation area, high automation degree, low labor intensity of workers, safety and reliability in use, high production efficiency and the like.
Owner:永康市加效焊接自动化设备有限公司

Airbag type inner framework form traveler and primary tunnel supporting shotcrete construction method

The invention discloses an airbag type inner framework from traveler and a primary tunnel supporting shotcrete construction method. The form traveler comprises a movable supporting framed bent, an inflatable formwork located on the outer side of the movable supporting framed bent, and a retractable supporting device for supporting the inflatable formwork, and the retractable supporting device is installed on the movable supporting framed bent and located on the inner side of the inflatable formwork. The construction method includes the steps: firstly, forwarding the airbag type inner framework from traveler in place; secondly, performing primary tunnel supporting shotcrete construction; thirdly, performing primary tunnel supporting shotcrete construction on a next tunnel section; fourthly, repeating the third step for multiple times till the primary tunnel supporting shotcrete construction process of all the tunnel sections is finished. The airbag type inner framework from traveler is reasonable in design, simple to construct and good in using effect, resilience rate of primary tunnel supporting shotcrete is effectively controlled through an airbag type inner framework, construction efficiency is high, construction period is short, construction quality is high, and zero resilience rate of primary tunnel supporting shotcrete can be realized.
Owner:CHINA RAILWAY FIRST GRP CO LTD +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products