Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

2results about How to "Reduce generation difficulty" patented technology

An integrated conductive ceramic membrane and a preparation method and application thereof

The application provides an integrated conductive ceramic membrane and a preparation method and application thereof, and belongs to the technical field of sewage treatment. The application uses a Sn source and a metal dopant as raw materials, adopts a co-precipitation-calcination-mixing ball milling-hydraulic pressing-calcination method, makes the ceramic membrane have a conductive capacity, directly prepares the integrated conductive ceramic membrane, and realizes the preparation of the integrated conductive ceramic membrane. The method makes the whole ceramic membrane have the conductive property, can not only avoid the problem of falling off of the conductive coating existing in the coating method, but also can simplify the preparation process, reduce the generation difficulty, and improve the membrane preparation efficiency.
Owner:ORDOS SHENGYUAN WATER GRP CO LTD +1

An artificial intelligence-based virtual power plant collaborative control and scheduling method and system

ActiveCN121308164BCollaborative control and scheduling are efficientReduce generation difficultyData processing applicationsSingle network parallel feeding arrangementsPower gridVirtual power plant
The application discloses an artificial intelligence-based virtual power plant cooperative control and scheduling method and system, relates to the technical field of power dispatching, predicts the power consumption of a power supply area through an artificial intelligence model, determines the predicted power consumption corresponding to the power supply area, provides a reliable basis for subsequent scheduling, encodes the output of each distributed energy in the virtual power plant, takes meeting the predicted power consumption as an optimization target, can convert a complex scheduling problem into an optimization problem, reduces the generation difficulty of a scheduling scheme, improves the response capability and control precision of the entire virtual power plant to grid instructions and market signals, and finally schedules based on the target optimal output parameter coding obtained through optimization, thereby realizing efficient virtual power plant cooperative control and scheduling.
Owner:ZHEJIANG ZHUOYANG ENERGY GROUP CO LTD