The invention relates to a scheduling management method based on field multi-measure
wireless communication
route equipment. The multi-measure
wireless communication
route equipment is a
wireless communication
system device integrating wireless self-organized
network communication, CDMA / GPRS / 3G (
Code Division Multiple Access /
General Packet Radio Service / The 3rd Generation Telecommunication)
mobile wireless network communication, an MCU (Microprogrammed
Control Unit), a video session terminal and a global positioning
satellite module. The wireless self-organized
network communication is a multi-
channel network, can be rapidly erected and removed. The distance among all nodes is in a
local area network with
radius of not more than 5 kilometers, and the
band width can reach 50Mbit / s. The CDMA / GPRS / 3G is used as a standby network. The occupation conditions of all channels are different during the communication. The network
occupancy rate of all channels can be detected in a real-time manner. The communication can be scheduled in a real-time manner to balance the
occupancy rate of all channels. When the wireless self-organized network is accidentally interrupted, the
route scheduling management enables the communication to be automatically switched to the CDMA / GPRS / 3
G network. As the
band width of the
mobile wireless network is small, a small amount of important data only can be transmitted. The route scheduling management detects whether the wireless self-organized network is restored in a real-time manner, if yes, the route scheduling management enables the communication to be switched to the wireless self-organized network from the CDMA / GPRS / 3G
mobile wireless network communication immediately. The whole
system has high stability and high reliability.