Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

52 results about "Operator scheduling" patented technology

Self-adaptive re-calculation and load division method, device and equipment based on neural network, and computer readable medium

The invention provides a parallel training method, device and equipment based on adaptive re-calculation and load division and a computer readable medium. The method comprises the following steps: firstly, converting a dynamic calculation graph in a deep learning framework into a static calculation graph data structure; then, the calculation sequence is divided, and calculation sub-graphs are generated; constructing a mixed integer programming model according to the calculation time of the operator, the transfer cost of the operator and the constraint condition; then, solving the scheduling optimization problem of the operator by using a solver to generate a video memory optimization strategy; aiming at the generated video memory optimization strategy, evaluating the execution time of each calculation sub-graph, and calculating to obtain a load balancing rate; and finally, according to a calculation result of the load balancing rate, determining a calculation sub-graph which is finally divided, and performing parallel training by utilizing the calculation sub-graph which is finally divided. Through the method provided by the invention, the final operator execution sequence can be found, so that the peak video memory consumption during the operation of the computational graph is within a given limit, and the training time of the neural network model is minimized.
Owner:COMP NETWORK INFORMATION CENT CHINESE ACADEMY OF SCI

Dynamic operator acceleration tuning method combining meta learning and reinforcement learning

A dynamic operator accelerated tuning method combining meta learning and reinforcement learning comprises the following steps: firstly, constructing a generalization search space based on operator scheduling primitives, extracting tensor program structure features, and establishing a dynamic operator cost model; secondly, intelligent agent parameters are quickly adjusted by applying a meta-learning optimization algorithm, and search is accelerated by utilizing a reinforcement learning state encoder and a meta-gradient descent algorithm; and further, an Autotuning technology is combined with a deep reinforcement learning architecture to carry out operator optimization strategy search. Designing a reward function, and feeding back and guiding a search behavior according to code performance. Through a control variable method and a quantitative analysis method, a calculation and memory access performance model is constructed, operator performance key factors are analyzed, and limit performance under different hardware conditions is evaluated. And finally, selecting an optimal operator to generate a code, and converting the code into a machine code of the target hardware platform. By designing a high-quality generalized search space and performance limit analysis method, the efficiency and precision of operator tuning are remarkably improved, and optimization support is provided for deployment of a deep learning system.
Owner:NAT SUPERCOMPUTING SHENZHEN CENT (SHENZHEN CLOUD COMPUTING CENT)

Operator processing method and related device

The invention provides an operator processing method, which comprises the following steps of: acquiring topological information of a computational graph, recording a plurality of operators, graph input data, graph output data, graph intermediate data and a dependency relationship of the plurality of operators included in the computational graph by the topological information, and constructing an operator execution queue according to the topological information of the computational graph. Each element in the operator execution queue corresponds to one operator and input data and output data of the operator, the input data of the operator is at least one of graph input data or graph intermediate data, and the output data of the operator is at least one of graph intermediate data or graph output data; the execution sequence of the plurality of operators is determined according to the dependency relationship of the plurality of operators. According to the method, the user is supported to customize the group graph according to the operator, and the operator execution queue is constructed based on the topological information of the calculation graph, so that the execution graph is constructed in the form of the operator execution queue, the method can be flexibly applied to all scenes needing batch operator scheduling, and the service requirements are met.
Owner:HUAWEI TECH CO LTD

Integrated hardware architecture and distribution strategy optimization for deep learning models

A training optimization system implements algorithmic solutions to solve the conjoined problem of accelerator architecture search and model partitioning for distributed training. The system makes the multi-dimensional optimization space of architecture search and device placement tractable by reducing the number of accelerator architectures explored through area-based heuristics and employing a novel integer linear program (ILP), the size of which is dependent only on the number of operators. The ILP scheduling optimization also explores the partitioning of operators across cores, known as intra-operator parallelism. Despite the vast space, the ILP described herein requires significantly less time to perform the optimizations across all explored accelerator configurations. Based on the optimal backward and forward pass latencies, the system leverages a novel dynamic programming (DP) approach to determine the device placement and model partitioning scheme.
Owner:MICROSOFT TECHNOLOGY LICENSING LLC

Neural network model operator scheduling method and system

The invention discloses an operator scheduling method and system for a neural network model, and the method comprises the steps: 1, collecting a segmentation scheme of each operator in the neural network model, and screening the segmentation scheme to obtain a unique segmentation mode, so as to guarantee that the memory consumption does not exceed the size of an on-chip space of a single calculation core when the operator is executed; 2, traversing all sub-graphs of the neural network according to a topological sequence to form a topological sequence, and merging the sub-graphs according to segmentation information of the sub-graphs to form a sub-graph group; 3, executing a dynamic programming algorithm, and searching and determining an optimal scheduling sequence of the neural network model; and 4, generating a dynamic scheduling sequence according to the recorded optimal scheduling information, and determining a calculation core number corresponding to each sub-graph group according to a heuristic greedy rule. Through reasonable operator scheduling, the method not only improves the calculation efficiency, but also further shortens the time delay of the neural network reasoning process, thereby achieving more efficient and faster neural network calculation.
Owner:HUIXI INTELLIGENT TECH (SHANGHAI) CO LTD

Neural network model parallel optimization method and device based on operator partitioning

The invention discloses a neural network model parallel optimization method and device based on operator blocking. The method comprises an operator blocking process sensed by hardware equipment and a weighted operator scheduling process. The operator partitioning process perceived by the hardware equipment comprises the following steps: expanding a neural network model, and constructing a computational graph; analyzing hardware characteristics of each device, and establishing a computing power model of each hardware device according to the hardware characteristics; traversing the calculation graph, and partitioning operators based on a calculation capability model of hardware equipment; the weighting operator scheduling process comprises the following steps: according to a partitioning scheme of each operator, updating a computational graph, endowing each operator node with a weight, and enabling the computational graph to become a weighting directed acyclic graph; traversing the calculation graph, calculating the height of each operator node, and taking the height as the priority of the operator node; an operator node set with the in-degree being 0 is found out, the node with the highest priority is put into an execution queue, the node and the edge connected with the node are deleted in a computational graph, and a finite topological sequence of operators is obtained.
Owner:WUHAN UNIV

Operator scheduling method and device, electronic equipment, storage medium and program product

The invention discloses an operator scheduling method and device, electronic equipment, a storage medium and a program product, and particularly relates to the technical field of computers. According to the specific implementation scheme, the method comprises the steps of determining a first operator characteristic vector of an operator to be scheduled; determining a first state characteristic vector of the first equipment; preprocessing the first operator characteristic vector and the first state characteristic vector to obtain target data; and inputting the target data into an operator scheduling model, and determining scheduling information of the to-be-scheduled operator, the scheduling information indicating a scheduling mode of the to-be-scheduled operator under each processor. In the operator scheduling process, the operator characteristics and the state characteristics of the first device are comprehensively considered, dynamic changes of different operators and processor performance can be coped with, reasonable utilization of the device when the operators run on the device is achieved, and the calculation efficiency of the operators is improved.
Owner:HUNAN KAIHONG ZHIGU DIGITAL IND DEV CO LTD

Deep learning compilation optimization method based on active transfer learning

The invention provides a deep learning compilation optimization method based on active transfer learning, and belongs to the field of deep learning compilation, and the method comprises the following steps: S1, generating operator scheduling, and extracting features as training data; the operator scheduling is to transform the data operation process of operators on deployment hardware; s2, selectively labeling data by adopting an active transfer learning method and pre-training the performance prediction model; the output of the performance prediction model is the expected time required for the operator to execute on the deployed hardware; s3, inputting an operator to be compiled, and performing automatic compiling by using the pre-trained performance prediction model; according to the method, an active transfer learning method is utilized to optimize the automatic compilation process of deep learning, so that the cross-hardware portability of a deep learning compiler is improved, and the deployment cost of a deep learning model on different hardware platforms is reduced.
Owner:SOUTHEAST UNIV +1

Computer for monitoring operation of power distribution network

The invention relates to the technical field of power grid operation monitoring, and discloses a computer for monitoring operation of a power distribution network, and a method which can be executed by the computer comprises the following steps: processing a virtual computing resource topological graph and a monitoring task demand matrix through a virtual network slicing algorithm to obtain a special monitoring network set; processing the special monitoring network set and the operator scheduling strategy through a distributed collaborative learning system to obtain a resource scheduling scheme; processing the resource scheduling scheme and monitoring the task state data in real time through a self-adaptive task migration system to obtain a task migration execution scheme; processing the task migration execution scheme and the regional monitoring data through a regional adaptive resource regulation and control system to obtain a key regional resource configuration scheme; according to the method, a plurality of logically isolated and collaborative special monitoring networks are constructed on existing computing resources in a software definition mode, so that the running state of the power distribution network is comprehensively monitored.
Owner:CHENYANG HENGPU GEOGRAPHIC INFORMATION TECHNOLOGY CO LTD

Heterogeneous multiprocessor neural network operator scheduling method, device, equipment and medium

The invention discloses a heterogeneous multiprocessor neural network operator scheduling method and device, equipment and a medium, and relates to the technical field of computers. Comprising the steps that a target neural network model is acquired and analyzed to obtain a data flow diagram, and the data flow diagram is stored in a preset storage space; obtaining input data for the target neural network model, and preprocessing the input data to obtain a corresponding data processing result; creating a data mapping table based on the data processing result and the data flow diagram, and sending the data mapping table to the accelerator; and the accelerator calculates the input data by scheduling an accelerator operator based on the data flow diagram and the data mapping table so as to obtain output data. Therefore, the interaction frequency between the central processing unit and the accelerator is reduced in the process of executing the calculation task, and the resource utilization rate and the calculation efficiency of the whole heterogeneous multi-core processor system are improved.
Owner:NAT UNIV OF DEFENSE TECH

Fine-grained multi-operator parallel scheduling method and system based on heterogeneous data stream architecture

The invention relates to a fine-grained multi-operator parallel scheduling method and system based on a heterogeneous data stream architecture. The method comprises the steps that an operator topological graph is established according to operators obtained through decomposition and related to the task scheduling process, and an operator data flow graph is constructed; analyzing a data dependency relationship among operators in a task according to the operator topological graph, grouping the operators based on the data dependency relationship and the runtime characteristics of the operators, and maintaining a corresponding scheduling queue for each operator group; scheduling the parallel operator group according to the scheduling queue, and allocating computing resources for the parallel operators based on runtime characteristics; performing data flow diagram dynamic reconstruction on the original operator data flow diagram of the parallel operator group according to the operator data flow diagram; and after the PE data flow array finishes executing the operators in parallel, checking whether each scheduling queue is empty or not, if so, ending operator scheduling, and otherwise, continuing to schedule the parallel operator group according to the scheduling queues. According to the method, the access to the SPM can be reduced, and multi-operator efficient parallel scheduling is realized.
Owner:HUAZHONG UNIV OF SCI & TECH

AIGC-oriented heterogeneous computing power resource collaborative acceleration method and system

The invention provides an AIGC-oriented heterogeneous computing power resource collaborative acceleration method and system, and relates to the technical field of data processing, and the method comprises the steps: inputting an activated AIGC model, determining an actual execution task sub-graph, and executing the model analysis of the task sub-graph; performing task sub-graph layering by utilizing structural semantics and functional semantics; carrying out operator feature extraction under dual-granularity constraint according to an operator fragmentation processing result and a hierarchical label; computing power state collection of the heterogeneous computing power resources is executed, the multi-dimensional feature set and the computing power state feature set serve as matching features, matching optimization of the heterogeneous computing power resources and operators is executed, and a scheduling response scheme is configured; and collaborative acceleration management is carried out. According to the method and the device, the technical problem of low operator scheduling efficiency in the execution process of the AIGC model due to strong dynamic performance of the computing power state of the heterogeneous computing power resource in the prior art is solved, and the utilization rate of the heterogeneous computing power resource is improved by realizing dynamic scheduling of the heterogeneous computing power resource and the model operator.
Owner:BEIJING YIHUA CLOUD NETWORK TECH CO LTD

Multi-agent discovery method and device in operator scheduling scene

The invention relates to the technical field of network operation and maintenance, and provides a multi-agent discovery method and device in an operator scheduling scenario, and the method comprises the steps: obtaining a command scheduling instruction inputted by a user; performing agent self-matching on the command and dispatch instruction according to a matching rule configured by each agent, wherein each agent is configured with at least one matching rule; under the condition of successful self-matching, determining the matched intelligent agent as a target intelligent agent; under the condition that self-matching fails, inputting the command and dispatch instruction into a pre-trained agent decision-making model to obtain a target coding text output after the agent decision-making model identifies the intention of the command and dispatch instruction, and under the condition that the target coded text is matched to a to-be-matched coded text configured in the matching rule of any agent, determining the any agent as a target agent. According to the method, the target agent matched with the command and dispatch instruction input by the user can be quickly and accurately found in a low-delay manner.
Owner:INSPUR TIANYUAN COMM INFORMATION SYST CO LTD

Operator scheduling method, device and system based on directed acyclic graph

This disclosure relates to the field of computer technology and discloses a method, apparatus, and system for operator scheduling based on a directed acyclic graph (DAG). The DAG is formed based on multiple operators and data flows between the multiple operators. The method includes: receiving a DAG to be processed input by a user, and indexing the corresponding operators according to the DAG; receiving preprocessing interface call parameters input by the user based on a preprocessing interface to preprocess the corresponding operators; and scheduling the corresponding operators according to the preprocessing results. This disclosure enables more flexible and fine-grained operator scheduling when scheduling operators in a DAG, based on the user's fine-grained processing requirements. It indexes the operators to be scheduled from the user-input DAG, preprocesses the indexed operators using a preprocessing interface, and schedules the operators according to the preprocessing results.
Owner:STREAM COMPUTING INC

Python operator scheduling method and device based on streaming computing framework, and storage medium

The invention discloses a python operator scheduling method and device based on a streaming computing framework, a storage medium and computer equipment. The method comprises the steps that a task submitting end submits a task execution request to a streaming computing management service; the streaming computing management service responds to the task execution request, generates a target task containing a main program file, and sends the target task to a streaming computing cluster; the streaming computing cluster receives a target task, and executes a main program file through a Python execution environment integrated in a streaming computing framework, so as to call a user-defined data source component and a user-defined data output component running on a Java virtual machine through a communication channel between a Python virtual machine and the Java virtual machine, and constructing a data processing assembly line through the user-defined data source component, the user-defined data output component and the data processing logic defined in the main program file, and triggering the data processing assembly line to be executed in the streaming computing framework.
Owner:BEIJING GUODIAN ZHISHEN CONTROL TONGDY

Power business scene-oriented operator scheduling method and device, medium and equipment

The invention discloses an operator scheduling method and device for a power business scene, a medium and equipment, and belongs to the field of scheduling. According to the method, power business data, data security level labels, computing power node resource states and trust level information are acquired, input and output protocols and resource demand fingerprints are analyzed and determined based on preset operator metadata portraits, a candidate node set is determined through preliminary screening, idle nodes are subjected to silent detection to acquire actual reasoning time consumption, and reasoning efficiency is improved. A multi-dimensional adaptation degree scoring model is input, a security mask value is determined according to comparison of a data security level and a trust level, after an adaptation degree score is comprehensively calculated, a target execution node, a distribution operator and data are output to complete local scheduling, and efficient self-adaptive scheduling of the heterogeneous operator at a cloud edge end is achieved. The problem that the AI operator cannot be accurately and efficiently scheduled in the prior art is effectively solved.
Owner:STATE GRID ZHEJIANG ELECTRIC POWER CO LTD +1

Heterogeneous computing resource collaborative acceleration method and system for AIGC

The present application provides a method and system for collaborative acceleration of heterogeneous computing power resources for AIGC, which relates to the field of data processing technology. The method includes: inputting an activated AIGC model, determining the actual execution task subgraph, and performing model parsing of the task subgraph; layering the task subgraph using structural semantics and functional semantics; extracting operator features under dual-granularity constraints based on the operator sharding processing results and layered labels; performing computing power state collection of heterogeneous computing power resources, using multi-dimensional feature sets and computing power state feature sets as matching features, performing matching optimization between heterogeneous computing power resources and operators, configuring scheduling response plans; and performing collaborative acceleration management. This application solves the technical problem in the prior art of low operator scheduling efficiency during the execution of the AIGC model due to the strong dynamic nature of the computing power state of heterogeneous computing power resources. By realizing dynamic scheduling of heterogeneous computing power resources and model operators, the utilization rate of heterogeneous computing power resources is improved.
Owner:BEIJING YIHUA CLOUD NETWORK TECH CO LTD

A computer for monitoring the operation of distribution network

The present invention relates to the technical field of power grid operation monitoring, and discloses a computer for monitoring the operation of a distribution network. The computer can execute the following methods: processing the virtual computing resource topology map and the monitoring task demand matrix through a virtual network slicing algorithm to obtain a dedicated monitoring network set; processing the dedicated monitoring network set and the operator scheduling strategy through a distributed collaborative learning system to obtain a resource scheduling plan; processing the resource scheduling plan and real-time monitoring task status data through an adaptive task migration system to obtain a task migration execution plan; processing the task migration execution plan and regional monitoring data through a regional adaptive resource control system to obtain a key area resource allocation plan; the method constructs multiple logically isolated but collaborative dedicated monitoring networks on existing computing resources in a software-defined manner to achieve comprehensive monitoring of the distribution network operation status.
Owner:CHENYANG HENGPU GEOGRAPHIC INFORMATION TECHNOLOGY CO LTD

An Adaptive GPU Power Consumption and Thermal Protection Control Method

This invention discloses an adaptive GPU power consumption and heat dissipation protection control method, relating to the field of intelligent chip technology. It transmits operator scheduling information generated by the artificial intelligence compilation framework layer to the embedded prediction model in the on-chip power management unit of the graphics processor via a sideband channel. Before transient power consumption spikes occur, it performs feedforward prediction and issues voltage clamping and throttling instructions. A three-dimensional equivalent thermal resistance and thermal capacity network model of the chip is constructed, and Kalman filtering is used to estimate the temperature of hidden hot spots. A three-layer collaborative closed-loop control loop is constructed at the microsecond, millisecond, second, and minute levels, enabling the cooling actuator to adjust the flow rate in advance according to load trends. This invention achieves accurate identification of three-dimensional spatial hot spots and proactive response of the cooling system, ensuring the safe operation of the graphics processor and preserving the overall computing power of the system.
Owner:SHENZHEN ZHIRUIYIN TECHNOLOGY CO LTD

Dynamic and static combined operator scheduling and high and low position scanning lightweight acceleration method

The invention relates to the technical field of deep learning model optimization, in particular to a dynamic and static combined operator scheduling and high and low position scanning lightweight acceleration method, which comprises the following steps: establishing a shape general space S and dividing the space into a plurality of same blocks; the actual shape is mapped to the shape general space, and then a shape operator is scheduled for calculation; constructing a cost model according to an actual shape mapping result, wherein the cost model is used for balancing the optimal cost among the microkernel performance, the hardware kernel occupation penalty and the shape filling penalty; distributing an optimal microkernel according to the actual shape and the cost model; performing scanning quantization on a high order and a low order of a parameter of the deep neural network model, and adjusting parameter precision by using hierarchical quantization sensitivity; and the stability and reasoning performance of the model under low precision are effectively improved.
Owner:SHANGHAI-CHONGQING ARTIFICIAL INTELLIGENCE RES INST

An efficient GPU multi-stream model inference operator scheduling system and method

The application discloses a high-efficiency GPU multi-stream model inference operator scheduling system and method, and the system comprises the following modules: a global operator scheduler module, a real-time resource sensing module and an operator information database module; the application is directed to a concurrent multi-stream DNN inference service system, and through fusing GPU resource sensing, operator resource demand analysis and a real-time queue scheduling mechanism, dynamic and efficient scheduling of GPU multi-stream operators is realized; the application significantly improves GPU resource utilization, reduces average inference delay in a multi-stream concurrent scene, enhances the stability and throughput capacity of the system under high-concurrent load, and has strong universality and scalability.
Owner:BEIJING UNIV OF POSTS & TELECOMM

Operator scheduling method, device, equipment and computer-readable storage medium

The present invention discloses an operator scheduling method, device, equipment and computer-readable storage medium, which relates to the field of deep learning technology, including: obtaining each operator to be scheduled and calculation logic contained in the current deep learning framework; searching each operator to be scheduled from the back-end operator library; combining each operator to be scheduled according to the calculation logic using a high-level language expression to obtain a target expression; parsing the target expression using an execution engine to obtain a parsing result; scheduling each operator to be scheduled using a preset general function interface according to the parsing result to calculate and process the input data of the current deep learning framework. The operator scheduling method provided by the present invention solves the problems of high maintenance complexity, high development workload, low operator scheduling efficiency, etc. of the current operator scheduling method, reduces the differences in calls between operators, simplifies the use and maintenance of operators, and improves the calling efficiency of the back-end operators of the deep learning framework.
Owner:LANGCHAO ELECTRONIC INFORMATION IND CO LTD

Machine learning computation optimization method and compiler

The application discloses a machine learning computation optimization method and a compiler. The method comprises the following steps: identifying a memory-intensive operator in a machine learning computation graph to obtain a plurality of subgraphs; identifying a backbone operator included in the subgraph, and grouping the subgraph based on the backbone operator; propagating index information from the backbone operator of each group to its predecessor operator; and fusing the operators in the memory-intensive operator subgraph into a GPU kernel function. The compilation optimization scheme of the application automatically generates efficient GPU code for large-granularity complex memory-intensive operator subgraphs by jointly considering the dependency relationship characteristics of the computation graph, the data locality on the multi-level storage architecture of the GPU, and the thread concurrency under different data sizes, reduces the additional overhead of GPU kernel function calling and framework layer operator scheduling, avoids unnecessary repeated calculation, reduces off-chip memory access, and simultaneously adapts to various data sizes to obtain optimized parallel efficiency.
Owner:ALIBABA CLOUD COMPUTING CO LTD

Time series data storage system and method for intelligent mine based on industrial Internet of Things

The invention relates to the technical field of time series data storage, and particularly discloses a time series data storage system for an intelligent mine based on industrial Internet of Things, which comprises a data acquisition module for respectively acquiring time series sensing data of various operation equipment efficiencies of each operation type in a white shift and a night shift on a workday, transmitting the data and the corresponding operator scheduling time sequence data to a central database for preprocessing so as to generate operation data; according to the invention, an embedding method based on deep learning is used, and an embedding layer is designed to map high-dimensional discrete data, i.e., scheduling of information of each person in different time periods, into a low-dimensional continuous vector space, so that the efficiency of the operation data is improved. And a deep learning model is used for learning, embedding and representing and establishing association with the basic efficiency to which the equipment operated by the personnel information belongs, so that the combination with different equipment under different scheduling information is greatly improved, and the overall working efficiency is improved.
Owner:ZHENGZHOU HUAKE INTELLIGENT TECH CO LTD

Computational graph processing method and device under data stream architecture chip and electronic equipment

The invention provides a computational graph processing method and apparatus under a data stream architecture chip, and an electronic device. The method comprises the steps of obtaining a computational graph of a deep learning model; determining the execution duration of calculation nodes of operators in the calculation graph in the data flow architecture chip, and determining the priority sequence of the operators based on the execution duration; determining a first computing node corresponding to the operator based on the priority sequence; and updating the first computing node corresponding to the operator to obtain a second computing node corresponding to the operator. The execution duration of the calculation nodes of the operators in the data flow architecture chip reflects the characteristics of a hardware calculation unit, and the priority sequence of the operators reflects the dependency relationship of the operators, so that the dependency relationship of the operators and the characteristics of the hardware calculation unit are comprehensively considered, and an efficient operator scheduling strategy is generated. The execution efficiency of the deep learning model on the data stream architecture chip is improved; and updating the first computing node to obtain the second computing node, thereby further improving the execution efficiency of the deep learning model on the data stream architecture chip.
Owner:YUANQIXIN (SHANDONG) SEMICONDUCTOR TECHNOLOGY CO LTD

A lightweight acceleration method for operator scheduling and high- and low-order scanning by combining dynamic and static operations

The present invention relates to the technical field of deep learning model optimization, and in particular to a dynamic and static merged operator scheduling and high- and low-bit scanning lightweight acceleration method, comprising establishing a shape universal space S and dividing it into multiple identical blocks; mapping the actual shape to the shape universal space and then scheduling the shape operator for calculation; constructing a cost model based on the actual shape mapping result to balance the optimal cost between microkernel performance, hardware kernel occupancy penalty and shape filling penalty; allocating the optimal microkernel based on the actual shape and the cost model; scanning and quantizing the high and low bits of the parameters of the deep neural network model, and adjusting the parameter accuracy using hierarchical quantization sensitivity; and effectively improving the stability and reasoning performance of the model under low precision.
Owner:SHANGHAI-CHONGQING ARTIFICIAL INTELLIGENCE RES INST

Data transmission method and device

The invention relates to a data transmission method and device. The method comprises: a first target device in a first pipeline parallel group obtains first data, the first data comprising an intermediate activation value calculated by any device in the first pipeline parallel group, and the intermediate activation value is associated with a parallel operation stage corresponding to the first pipeline parallel group in a neural network model; and the first target device sends first data to a second target device in the second assembly line parallel group, the second target device receives the first data and sends the first data to other devices in the second assembly line parallel group, so that the other devices carry out calculation based on the first data. According to the embodiment of the invention, the number of sending operations can be obviously reduced, the complexity of operator scheduling is reduced, the utilization of computing resources and network bandwidth is optimized, the communication overhead (especially the bandwidth consumption during cross-machine communication) is reduced, and the resource utilization rate and the data transmission efficiency are improved.
Owner:MOORE THREAD INTELLIGENT TECHNOLOGY (WUXI) CO LTD

Fine-grained multi-operator parallel scheduling method and system based on heterogeneous data flow architecture

The application relates to a fine-grained multi-operator parallel scheduling method and system based on a heterogeneous data flow architecture. The method comprises the following steps: establishing an operator topology graph according to operators related to a task scheduling process obtained through decomposition, and constructing an operator data flow graph; analyzing data dependency between operators in a task according to the operator topology graph, grouping the operators based on the data dependency and runtime characteristics of the operators, and maintaining a corresponding scheduling queue for each operator group; scheduling parallel operator groups according to the scheduling queue, and allocating computing resources to the parallel operators based on the runtime characteristics; dynamically reconstructing an original operator data flow graph of the parallel operator groups according to the operator data flow graph; after the PE data flow array parallelly executes the operators, checking whether each scheduling queue is empty, if yes, ending the operator scheduling, otherwise, continuing to schedule the parallel operator groups according to the scheduling queue. The application can reduce access to SPM and realize efficient multi-operator parallel scheduling.
Owner:HUAZHONG UNIV OF SCI & TECH

Multi-ring coupling mining mechanism intelligent optimization method inspired by large language model

The invention provides a multi-ring coupling mining mechanism intelligent optimization method inspired by a large language model. The method comprises the following steps: constructing an optimization model comprising a design variable, an optimization target and a constraint condition; then configuring a hyper-heuristic optimization framework, and initializing a historical knowledge base, a trigger mechanism and a bottom operator library; whether the large model is called or not is determined through triggering judgment, cue words are constructed by fusing multi-source state information, the operator scheduling proportion is generated by the large model or obtained through a standby strategy, filial generations are generated according to the operator scheduling proportion, a population is updated, and meanwhile a knowledge base is updated in a rolling mode; and finally outputting an optimal design scheme. According to the method, the deep reasoning capability of a large language model is fused, dynamic scheduling and adaptive combination of various underlying operators are achieved, the defects that a traditional algorithm is insufficient in adaptive capability and prone to falling into local optimum are effectively overcome, and the global search efficiency and the solving precision in high-dimensional, nonlinear and strong-constraint complex engineering problems are remarkably improved.
Owner:JIANGSU UNIV