Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

57results about How to "Avoid manual configuration" patented technology

Method for allocating and configuring address, address allocation server and host machine

ActiveCN102143247ARealize remote automatic configurationEnsure correct configurationTransmissionVirtual LANIp address
The invention provides a method for allocating and configuring an address, an address allocation server and a host machine. In the method, the address allocation server receives an internet protocol (IP) address request message sent by the host machine, wherein the IP address request message carries information for reflecting the physical address of the host machine, and the physical address of the host machine is network segment information and/or virtual local area network (LAN) identification which is allocated to the host machine for independent use by an IP load-carrying network; the address allocation server queries the IP address request message so as to acquire the physical address of the host machine; the address allocation server determines an IP address which is allocated to the host machine in accordance with a correspondence between an IP address maintained by the address allocation server and the physical address of the host machine; and the address allocation server allocates the determined IP address to the host machine. According to the embodiment of the invention, the problem that the physical address is configured by a person can be avoided, thereby ensuring that the IP address is allocated successfully based on the physical address.
Owner:HUAWEI TECH CO LTD

Method and device for peer-to-peer optical cross connection configuration

The invention discloses a method and a device for peer-to-peer optical cross connection configuration, and relates to the field of wavelength division multiplexing (WDM) and optical transport network (OTN) equipment management. The method comprises the following steps of: 1, collecting and creating a unit disk management object dataset and an optical port management object dataset in an OTN; 2, collecting and creating an internodal optical fiber connection management object dataset; 3, collecting and creating an intra-node optical fiber connection management object dataset; 4, collecting and creating an optical channel management object dataset; 5, checking whether the same wavelength of different light source positions forms a wavelength conflict or not by analyzing an optical fiber connection object sequence and optical port information, and directly finishing the method if the same wavelength of the different light source positions forms the wavelength conflict; and 6, automatically searching for an optical port and wavelength information required by the configuration of a reconfigurable optical add-drop multiplexing optical cross processing unit disk by analyzing an optical fiber connection management object sequence, and creating optical cross connection configuration data. By the method and the device, errors caused by artificial memory, manual parameter collection and manual operation are avoided, and the running cost of a network is decreased.
Owner:FENGHUO COMM SCI & TECH CO LTD

GRE tunnel establishment method and system

The invention discloses a GRE tunnel establishment method and system, and the method comprises the steps: enabling first network equipment to receive a data packet sent by first terminal equipment, and obtaining an outer-layer IP source address and an outer-layer IP destination address; judging whether a tunnel corresponding to the outer-layer IP source address and the outer-layer IP destination address of the data packet is created or listed into a tunnel blacklist of the first network equipment or not; if not, enabling the first network device to create a corresponding tunnel and routing rule, generating a GRE data packet, and transmitting the GRE data packet to a second network device corresponding to the outer-layer IP destination address; enabling a second network device to receive the GRE data packet and obtain an outer-layer IP source address and an outer-layer IP destination address of the GRE data packet; judging whether a tunnel corresponding to the outer-layer IP source address and the outer-layer IP destination address of the GRE data packet is created or listed into a tunnel blacklist of the second network equipment or not; if not, enabling the second network device tocreate a corresponding tunnel and routing rule. According to the invention, automatic tunnel creation is realized, and convenient networking is realized.
Owner:QINGDAO HISENSE ELECTRONICS EQUIP

Cooling tower system based on centerless network, cooling tower controller and control method

ActiveCN105674791AExcellent overall energy efficiencyAvoid manual configurationHeat exchange apparatusCooling towerControl manner
The invention provides a cooling tower system based on a centerless network, a cooling tower controller and a control method of the cooling tower system. The method includes the steps that one cooling tower controller is arranged on each cooling tower, and all the cooling tower controllers are connected to form the centerless network; when it is judged that a certain trigger condition is met, the cooling tower controllers initiate adjusting tasks; the cooling tower controllers start to interact with the adjacent cooling tower controllers; and after interaction is conducted multiple times, the whole system confirms optimized operation parameters of all the cooling towers, and the corresponding cooling towers are controlled to be in the corresponding operation states according to the optimized operation parameters. The method is based on the centerless network, all the cooling towers connected in parallel finish target control equally and autonomously in a coordinated manner, the optimization control scheme is worked out in a distributed manner, the workload generated during manual configuration and debugging of a traditional control manner is lowered, and the control equipment is plugged and used immediately; and the control efficiency, robustness and expandability of the system are improved.
Owner:LYNKROS TECH CO LTD

Rainfall implementation device, parameter calibration method thereof and related equipment

The application discloses a rainfall implementation device, a parameter calibration method thereof and related equipment. A first control subunit calculates a rain intensity value according to the wind-driven rain test rainfall similarity criterion and a reduced-scale parameter after receiving the reduced-scale parameter of a wind tunnel test segment model or aeroelastic model and sends a first rainfall parameter corresponding to the rain intensity value to a rainfall system; the rainfall system simulates rainfall according to the first rainfall parameter; a test feedback system measures a second rainfall parameter when the rainfall system simulates rainfall, and feeds back the second rainfall parameter to a second control subunit system; the second control subunit calculates deviation according to the first rainfall parameter and the second rainfall parameter; and when the deviation is greater than a preset threshold value, updating the first rainfall parameter based on the deviation,and sending the updated first rainfall parameter to the rainfall system. Therefore, technical problems of unsatisfactory adjustment of the rainfall parameters, poor adjustability of a rainfall device and low automation degree of the existing structural wind area reduced-scale model are solved.
Owner:ELECTRIC POWER RES INST OF GUANGDONG POWER GRID
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products