Novel water control method suitable for mine shafts

The invention relates to a novel water control method suitable for mine shafts, which is characterized by firstly adopting grouting for water plugging at a water-bearing layer at the upper part of the shaft; arranging a wall seat at the boundary of the water-bearing layer and a water-resisting layer and arranging a bypass for water interception after the wall on the upper surface of the wall seat; arranging a dewatering orifice in the bypass and arranging a water guide pipe in the orifice, wherein the wall seat is wider than the bypass and the wide part of the wall seat is upwarped for water blocking; arranging a water collecting ring in the shaft at the upper part of an access road and draining water collected by the water collecting ring into the bypass after the wall, wherein a baseplate of the access road is 200-300mm higher than the bypass; and pre-burying a drainage pipe and enabling gushing water collected at the upper part of the bypass to self-flow into a water sump and be further drained to the ground through a drainage device. By adopting the novel water control method, the construction conditions of the mine shaft can be improved, the construction quality can be improved and the progress can be accelerated; furthermore, water damages can be effectively prevented during the production period of a mine, the safety of the mine shaft is protected, the drainage cost is reduced and the service life of the mine shaft is prolonged.
Owner:BLUESTAR LEHIGH ENG INST CO LTD

High-elasto-viscosity stress absorbing layer and top facing construction process thereof

The invention belongs to the technical field of road and bridge maintenance and discloses a high-elasto-viscosity stress absorbing layer and a top facing construction process thereof. The high-elasto-viscosity stress absorbing layer is arranged between an old cement concrete pavement and an overlay above the old cement concrete pavement, and composed of polymer modified asphalt, limestone, fine river sand and aggregate chips. The top facing construction process of the high elasto-viscosity stress absorbing layer comprises three steps in order: designing the mixing proportion of the high-elasto-viscosity stress absorbing layer; determining the plane position, and performing preparation before construction; and mixing a polymer modified asphalt-concrete mixed material, transporting, paving and rolling. The high-elasto-viscosity stress absorbing layer has the powerful stress absorption capacity, high caking capacity and excellent waterproofness, and is capable of generating a delaying effect on cracks of a polymer modified asphalt-concrete surface layer due to stress concentration, and therefore, the anti-rutting performance of a pavement is greatly improved, and the water damage of a base layer as pavement water seepage enters the base layer also can be prevented.
Owner:CCCC SHEC DONGMENG ENG CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products