Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

45 results about "High water mark" patented technology

A high water mark is a point that represents the maximum rise of a body of water over land. Such a mark is often the result of a flood, but high water marks may reflect an all-time high, an annual high (highest level to which water rose that year) or the high point for some other division of time. Knowledge of the high water mark for an area is useful in managing the development of that area, particularly in making preparations for flood surges. High water marks from floods have been measured for planning purposes since at least as far back as the civilizations of ancient Egypt. It is a common practice to create a physical marker indicating one or more of the highest water marks for an area, usually with a line at the level to which the water rose, and a notation of the date on which this high water mark was set. This may be a free-standing flood level sign or other marker, or it may be affixed to a building or other structure that was standing at the time of the flood that set the mark.

Development method of untabulated reservoir in extra-high water-cut period

ActiveCN105317407APropose an independent development methodEnhanced overall recoveryFluid removalProduction rateWater flooding
The invention provides a development method of an untabulated reservoir in an extra-high water-cut period. The development method comprises the following steps: acquiring definite geological development characteristics, employing status and water washing characteristics of the untabulated reservoir according to the geology, production and core well monitoring data of the untabulated reservoir; determining whether the untabulated reservoir meets the independent development conditions according to the aforementioned results; treating an independent untabulated reservoir at a forming course encountered in the drilling of an oil-water well as an object, and determining a development manner of the untabulated reservoir according to the distribution features of a tabulated reservoir and the untabulated reservoir; building a productivity evaluation model for the independent development of the untabulated reservoir according to a fracturing technology, stratums and fluid physical property data, providing corresponding technical limits, and developing in a determined surface reservoir development manner, so as to finish the development method of the untabulated reservoir in the extra-high water-cut period. According to the aforementioned development method, the water flooding of the untabulated reservoir in the extra-high water-cut period is effectively employed, thus the basis is provided to the scientific development of the untabulated reservoir, and the purpose of improving the production rate can be achieved.
Owner:PETROCHINA CO LTD

Network-adaptive streaming media quality of service (QoS) control method

ActiveCN102547389ADecrease or increase in qualitySolve unstable bandwidthSelective content distributionQuality of serviceWeb transport
The invention discloses a network-adaptive streaming media quality of service (QoS) control method, which comprises the following steps that: connection is established between a transmission node and a receiving node; a player buffer of the receiving node is divided into three sectors by using a high water level mark and a low water level mark, and when a play pointer drops to a normal water level sector from a high water level sector, the receiving node triggers a first kind of QoS event; when the play pointer rises to be higher than a high water level sector from the normal water level sector, the receiving node triggers a second kind of QoS event; the receiving node reflects the data forwarding quality of the transmission node through the QoS events, and transmits the data forwarding quality to the transmission node, and when receiving the first kind of QoS event, the transmission node starts a code stream conversion engine to reduce a video code stream which is forwarded by the transmission node; and when receiving the second kind of QoS event, the transmission node starts the code stream conversion engine to improve the video code stream which is forwarded by the transmission node. The code stream and the quality can be dynamically changed according to the change of network transmission, so that uninterrupted video stream play experiences can be kept even when network jitter occurs.
Owner:CHUANGO SECURITY TECHNOLOGY CORPORATION

Forestation technology using mangrove forest plant to convert pond to forestry

The invention discloses a forestation technology using mangrove forest plant to convert a pond to forestry. The method comprises the steps of building planting ridges and water channels in a waste pond, arranging a water gate, controlling water in the water channels to communicate with outside by a gate in the water gate, wherein multiple planting ridges can be arranged according to the size of the pond; opening the gate of the water gate to enable water in the pond to change along with external water, and determining the high water mark in the pond, wherein the heights of the planting ridges are selected to be lower than the high water mark by 10cm, the bottom areas of the planting ridges are larger than the opening areas and vertical section shapes of the planting ridges are a trapezoid with a narrow upper part and a wide lower part; planting tree seeds into the planting ridges, encircling the planting ridges with a gauze element of about 20 meshes, opening the gate to communicate water in the pond with an outside water body and enable the water in the pond to change along with the tide change of the outside water body, inspecting in each month and timely replacing dead individuals. The method has the beneficial effect the tree seed survival rate of the mangrove forest is high by turning the pond to forestry.
Owner:HAINAN UNIVERSITY

Bean juice maker capable of making appointment

The invention relates to a bean juice maker capable of making an appointment, comprising a nose arranged above a cup body, wherein the nose is provided with a control circuit board and a motor base, the motor base is internally provided with a motor with a motor shaft, one end of the motor shaft is inserted into the cup body, a stirring blade is arranged at the end position, the cup body is internally provided with a dismountable appointment-making cup assembly; and the appointment-making cup assembly comprises an appointment-making cup and a sliding door of the appointment-making cup, the appointment-making cup is arranged above a highest water level mark in the cup body, and the sliding door is provided with a lifting lever which controls the appointment-making cup to open or close. Compared with the prior art, the invention has the following beneficial effects: the dismountable appointment-making cup assembly is additionally arranged on the cup body, when the appointment time is up, the lifting lever is pushed by an external force so as to cause the sliding door to slide, and the external force can be a pushing force generated in the way that a liquid in the cup body rapidly flows or a pushing force generated by a telescopic link of a solenoid valve, or a motor rotates at a high speed to cause the cup body to vibrate at high frequency so as to cause the lifting lever to swing. The bean juice maker capable of making the appointment has the characteristics of being simple and reasonable in structure, saving time and labour and being safe and reliable.
Owner:GUANGDONG GALANZ GRP CO LTD

Predication method for natural decline rate at super-high water-cut later period of water flooding development oil reservoir

InactiveCN106156876AAccurate and fast natural lapse rateForecastingSoil scienceWater flooding
The invention provides a prediction method for the natural decline rate at a super-high water-cut later period of a water flooding development oil reservoir. The prediction method comprise the steps of calculating the annual production natural decline amount according to development indexes in recent years, and calculating the annular natural decline rate; calculating an annual year injection-production ratio according to the annual water injection volume of a calculated oil field and the deficit amount of a statistical stratum in the recent years; calculating stratum number injection-production corresponding rate at the annual year end of the calculated target in the resent years; carrying out liner fitting on the product of the annual year injection-production ratio and the stratum number injection-production corresponding rate and an annual output natural decline amount variation so as to acquire a calculation formula for measuring and calculating the annual output natural decline amount; calculating the natural output decline amount of the next year according to the calculation formula of the annual output natural decline amount, and then calculating the natural decline rate according to a calculation formula of the decline rate. The prediction method for the natural decline rate at the super-high water-cut later period of the water flooding development oil reservoir can meet application requirements of the oil field, and effectively guides practices at a super-high water-cut later development period of medium and high permeability water flooding oil reservoirs.
Owner:CHINA PETROLEUM & CHEM CORP +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products