The invention discloses a BIM (
Building Information Modeling) and GIS (
Geographic Information System)-based garden landscape full-life-cycle
collaborative management method. According to the method, the
plant design model of the BIM and the
environmental data monitored by the GIS in real time are integrated, the constructed digital twinborn
system can dynamically simulate the
plant growth state, the adaptive
irrigation amount is calculated according to the real-time
soil humidity and the
plant growth stage, and the problem of excessive
irrigation or insufficient
irrigation in traditional maintenance is avoided. And in combination with long-term accumulated
growth data and environmental parameters, the
system can pre-judge
plant growth requirements and potential risks in advance, and generates maintenance suggestions fitting the actual site, so that the maintenance measures are always adaptive to the current state of the plant. Meanwhile, multi-dimensional factors are integrated to give an objective updating sequence, resources are inclined to the most urgently needed link, the
resource utilization efficiency is improved, the operation and maintenance cost is reduced, the site initial ecological background is protected, and therefore the
system can better maintain the stability of plant communities.