Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

34results about How to "Improve pile sinking efficiency" patented technology

Water jet sprayer assisting offshore platform in sinking pile

The invention discloses a water jet sprayer assisting an offshore platform in sinking a pile. The water jet sprayer comprises a barrel body with a water inlet and a water outlet, and a core tube arranged in an inner cavity of the barrel body, wherein a hollow core tube inner cavity is formed in the core tube; a plugging member for selectively plugging the water inlet is arranged on the top of the core tube; an annular baffle plate with a plurality of water holes, a plurality of water channels extending along an axial direction of the core tube, a guide impeller with spiral guide blades and a spiral nozzle which is arranged at the bottom of the core tube and provided with a spiral channel are sequentially arranged on the core tube below the plugging member; and an outer ring nozzle is formed between the outer wall of the spiral nozzle and the inner wall of the water outlet of the barrel body. During pile sinking, the water jet sprayer jets high-pressure water at high speed in the form of combined jet flow to scour a soil body in the pile, so that soil blockage in the pile can be removed effectively, the power pile sinking resistance is reduced, the pile sinking efficiency is improved, and aims of shortening the platform construction period and reducing the construction cost are fulfilled.
Owner:CHINA UNIV OF PETROLEUM (EAST CHINA)

Precast pile post-grouting device and precast pile post-grouting process

InactiveCN104234055AGrouting construction method after solutionImprove pile sinking efficiencyBulkheads/pilesPre stressSlurry
The invention relates to the technical field of foundation stabilization, in particular to a precast pile post-grouting device and a precast pile post-grouting process. The technical scheme adopted by the invention is that the precast pile post-grouting device comprises a precast pile, a stirrer, a slurry tank, a grouting pump and a grouting hose; a pile body of the precast pile is provided with a prestressed reinforcement, a spiral bar, an upper end plate and a lower end plate. The precast pile post-grouting device is characterized in that grouting holes are also formed in the precast pile, and the precast pile is also provided with grouting pipes, an upper transition pipe and a lower transition plate. Compared with the prior art, the precast pile post-grouting device and the precast pile post-grouting process have the beneficial effects that a construction process of pile tip and pile tip peripheral grouting and the arrangement form of the grouting pipes can be realized on piles with various pile diameters (large diameters and small diameters), various pile types (square piles, round piles, hollow piles and solid piles) and various pile lengths (short piles and long piles), and the problems of a post-grouting construction method of all precast pile types are solved.
Owner:顾孙平

Water-flushing sinking-assisting system and construction technical method thereof

The invention relates to a water-flushing sinking-assisting system. Two water jet pipes and an air pipe are preembedded in a pile body of a precast pile, water inlet ends of the two water jet pipes are connected to a quick joint and then connected to a double-table water pump, and a side wall of the pile body is provided with three outer drainage holes communicated with a pile core; a pile tip isa funnel shaped steel pile tip welded by a steel plate; and the two water jet pipes at the pile tip flush water directly along the pile axial line direction. The invention has the advantages that because the three outer drainage holes with the diameter of 70mm, reserved at the pile body, are communicated with the pile core, the effective length of an inner drainage slurry channel is reduced so asto drain away water and sand; because a water pipe and the air pipe are preembedded in concretes, the pipes are unnecessary to pull out, an internal thread bend elbow of 90 DEG is adopted at a water inlet end and an air inlet end so as to connect the quick joint; and because the quick joint is utilized, the assembly and disassembly are quick, the steps of assembling and disassembling the water pipe and the air pipe are effectively avoided, the operation is simple, the cost is lower, and the pile-sinking efficiency is improved.
Owner:CCCC FIRST HARBOR ENG +1

Hammering pile sinking and synchronous pile tip and side grouting structure and process in pile tip of pile shoe-provided pipe pile

ActiveCN107938666AReduce side frictionImproved hammer penetration abilityBulkheads/pilesPre stressPipe
The invention discloses a hammering pile sinking and synchronous pile tip and side grouting structure and a hammering pile sinking and synchronous pile tip and side grouting process in a pile tip of apile shoe-provided pipe pile, and belongs to the field of a construction method.. According to the grouting method, a center penetrating hammer is used for hammering the pile tip to expand a pile shoe so that the pile tip can be hit into the pile shoe; the pile tip sinks and takes a pre-stressed pipe pile to sink together; and the pile tip and the pile side are synchronously expanded to realize grouting treatment inside a grouting passage. The grouting structure disclosed by the invention is relatively high in hammering penetration capability; a synchronous grouting system can commendably play a lubrication effect in a pile sinking process and can reduce the friction resistance of the pile side; after pile sinking is ended, the strength improvement can provide a higher single pile bearingcapacity; a hammering process is performed under the ground; construction noises can be controlled commendably; and the height of an elevator is adjustable, namely the hammer drop journey can be corrected according to the geological conditions of the current pile sinking depth, so that higher pile sinking efficiency is achieved. The structure and the process disclosed by the invention have low requirements on equipment; the bearing capacity of an equipment platform generally needs not to be specially treated, all equipment can be recycled after the construction is ended, and good economicalbenefits are realized.
Owner:ZHEJIANG UNIV

H-shaped supporting pile made of prefabricated reinforced concrete

An H-shaped supporting pile made of prefabricated reinforced concrete comprises an H-shaped hoop and an H-shaped standard reinforced concrete pile section, wherein the H-shaped hoop is formed by a steel reinforcement framework, provided with an H-shaped section and comprises a vertical stirrup, a triangle frame hoop and an 'S'-shaped stirrup, the bottom edges of the triangle frame hoop are connected with a plurality of main reinforcement ribs longitudinally, the inner side of the 'S'-shaped stirrup is connected with longitudinal inner reinforcement ribs longitudinally, wedge-shaped recesses are arranged on both the left and the right side of the H-shaped hoop, and two ends of the H-shaped standard reinforced concrete pipe section are provided with pile head portions. The H-shaped supporting pile is provided with the optimum section characters of a horizontal force resistant pipe for bearing side earth pressure, and the steel reinforcement ribs and concrete can be obviously saved; industrialized production of shaped commercial piles is realized, pile sinking efficiency is improved, and labor force is reduced; and construction of high-pressure spinning spraying piles between every two piles is realized, anti-seepage probability is improved since cement slurry sprayed by the high-pressure spinning spraying piles is restrained by the H-shaped section.
Owner:孔超

Pile sinking construction method based on assembly movable platform

The invention provides a pile sinking construction method based on an assembly movable platform. The method comprises the following steps that a, steel pipe piles are constructed in a plate pile construction area in the plate pile paving direction side by side; b, the tops of each row of steel pipe piles are provided with a transverse beam; c, longitudinal beams are uniformly arranged between every two transverse beams at intervals and are distributed in the plate pile paving direction; d, panels parallel to the transverse beams are arranged on the longitudinal beams; e, crawler cranes are placed on a walking plane; f, guiding frames are erected between the tops of the two transverse beams which are not provided with the panels; g, plate piles are lifted through the crawler cranes, and the plate piles are constructed after being subjected to guiding positioning through the guiding frame; and h, the panels, the longitudinal plates and the guiding frames between the two transverse beams close to the plate piles are disassembled, and the steps from f to g are repeated in the area where the plate piles are not constructed. According to the pile sinking construction method based on the assembly movable platform, the stress is clear, the method cannot be influenced by wind waves, and the precision and efficiency of pile sinking are high.
Owner:CCCC SECOND HARBOR ENG

Concrete prefabricated pipe pile only bearing anti-drawing effect

The invention belongs to the field of constructional engineering, and particularly relates to a concrete prefabricated pipe pile only bearing an anti-drawing effect. The concrete prefabricated pipe pile only bearing the anti-drawing effect comprises a concrete prefabricated pile body, a detachable hollow guide rod and a metal pile tip. The concrete prefabricated pile body is provided with a pile top and a pile bottom. The concrete prefabricated pile body is driven into foundation soil. The detachable hollow guide rod is arranged in a cavity of the concrete prefabricated pile body, a pile tip connecting thread is arranged at the bottom end of the detachable hollow guide rod, a guide rod connecting thread is arranged at the top end of the metal pile tip, and the detachable hollow guide rod is in threaded connection with the metal pile tip. The concrete prefabricated pipe pile has the following beneficial effects that the metal pile tip is arranged on a pile tip of the concrete prefabricated pipe pile, pile sinking pierces into soil mass to more easily penetrate through a hard soil layer, the efficiency of pile sinking is improved, and disturbance for the surrounding soil mass is reduced; and the pile tip can be recycled, a cavity can be formed between the pile tip and the foundation soil, the purpose of saving materials is achieved, the size of the metal pile tip can be customized, and the use range is wide.
Owner:上海杰地建筑设计有限公司

Pile stabilizing frame for pile sinking of offshore wind power batter pile group and pile sinking method

The invention relates to a pile stabilizing frame for pile sinking of an offshore wind power batter pile group and a pile sinking method. The pile stabilizing frame comprises a supporting frame, a first limiting frame and a second limiting frame; the first limiting frame and the second limiting frame are arranged at two opposite ends of the supporting frame correspondingly; rotatable first batter pile positioning mechanisms are arranged on the first limiting frame; a plurality of second batter pile positioning mechanisms are arranged on the second limiting frame; and on a horizontal plane, the projection area of the first limiting frame is smaller than or equal to the projection area of the second limiting frame. According to the pile stabilizing frame, fixing and inclination adjusting of a plurality of batter piles can be achieved, the batter piles do not need to be hoisted by moving ship position for multiple times, on the one hand, the safety risk is reduced, on the other hand, the working procedures can be reduced, the pile sinking efficiency is improved, and then the installation cost is saved. The rotatable second batter pile positioning mechanisms are arranged to be matched with the plurality of first batter pile positioning mechanisms, so that the overall weight of equipment can be reduced, the production and installation difficulty is reduced, and the cost is saved.
Owner:CCCC FOURTH HARBOR ENG CO LTD

Prestressed reinforced concrete H-shaped support pile based on pre-tensioning method

InactiveCN103590398AReach internal strength requirementsGood bending section propertiesMouldsBulkheads/pilesReinforced concretePre stress
A prestressed reinforced concrete H-shaped support pile based on a pre-tensioning method comprises a standard pile section provided with a reinforcement cage, wherein the reinforcement cage is composed of erection reinforcing steel bars, an H-shaped steel hoop and an S-shaped steel hoop, the upper flat surface and the lower flat surface of the cross section of the reinforcement cage are provided with a plurality of horizontally and symmetrically arranged high-strength prestressed steel bars, the standard pile section is manufactured by the adoption of a steel die, the steel die comprises bottom channel steel and a turnable protruding side template, fixing stand columns are arranged on two sides of the protruding side template, pivots of the protruding side template are connected to two sides of the bottom channel steel, the upper ends of the fixing stand columns are connected with limiting channel steel, the two ends of the reinforcement cage are respectively provided with an end template provided with a plurality of horizontally-arranged through holes, and the through holes are matched with the prestressed steel bars. The prestressed reinforced concrete H-shaped support pile has the advantages that excellent anti-bending cross-section characteristic is achieved, and compared with a drilling poring pile normally adopted in a support pile, 40-50% of steel bars and 30-40% of concrete can be saved, and significant economic and technological effects are achieved.
Owner:孔超

Positioning and pile sinking device of self-transportation buried piles

The invention discloses a positioning and pile sinking device of self-transportation buried piles, and relates to the technical field of pile sinking equipment of positioning piles. The device comprises a positioning device, a transportation device and a pile sinking device; the positioning device includes a baseplate, a distance controller and a driving wheel; the transportation device includes a belt connecting rod, a conveying belt and belt limiting grooves; and the pile sinking device includes a pile sinking connecting plate, a pile sinking lifting rod, a pile sinking block, a pile sinking turner, a turnover plate, a turnover plate limiting groove, a rotating buckle and a rotating baseplate. The device uses the distance controller for controlling the driving wheel to perform the pile sinking positioning, and is provided with the conveying belt and multiple belt limiting grooves in the conveying belt for carrying and transporting positioning piles; in the pile sinking place, the positioning piles on the conveying belt are conveyed into the turnover plate limiting groove of the turnover plate, and are overturned by the pile sinking turner; and the pile sinking lifting rod drives the pile sinking block to repeatedly beat to finish the pile sinking work, so that the pile sinking efficiency is high, the labor intensity of workers is low, and the modern building demands are accorded with.
Owner:重庆新动生物技术有限公司

Pile-sinking construction method for deep riprap unfavorable geologic region

The invention discloses a pile-sinking construction method for a deep riprap unfavorable geologic region, and the pile-sinking construction method firstly performs earthwork replacing operation of a vertical enclosure structure area, and performs vertical pile construction or steel plate pile enclosure structure construction in an area in which replacement is completed. The pile-sinking construction method is characterized in that the earthwork replacing operation comprises the following steps: (1) measuring, paying off and positioning; (2) defining one group by a plurality of pile tubes which are arranged in parallel and are provided with movable pile tips, and performing pipe-sinking construction; (3) backfilling fine grained soil into one group of immersed tubes which are constructed; (4) after earthwork backfilling is completed, reserving the last pile tube as the first one of a next group, pulling off the rest of the pile tubes, thereby forming a cob wall; and (5) repeating steps (2) to (4), and performing pipe-sinking backfilling operation of the next group of pile pipes until earthwork of the vertical enclosure structure area is replaced. The pile-sinking construction method is convenient in construction, is high in pile sinking efficiency, is low in construction cost, and can strength the water-stop effect of the vertical enclosure structure.
Owner:ZHONGYIFENG CONSTR GRP

A construction method for pile driving based on jacking and driving platform

The invention relates to the technical field of steel pipe pile sinking construction, in particular to a pile sinking construction method based on a jacking-pushing walking platform. A track beam is erected on a constructed a first round of steel pipe piles, then the walking platform is installed on the track beam, a crawler crane and a guide frame on the walking platform are adjusted, and a second round of steel pipe piles are inserted and piled through the crawler crane and the guide frame. A new track beam is erected to connecting all the second round of steel pipe piles, the jacking-pushing walking platform moves to the second round of steel pipe piles along the new track beam, the crawler crane and the guide frame are adjusted, inserting piling construction of a third round of steel pipe piles is completed through the crawler crane and the guide frame, and construction is conducted sequentially alternatively till construction of all steel pipe piles is completed. According to the pile sinking construction method based on the jacking-pushing walking platform, the structure is simple, and operation is convenient. The inserted-piled steel pipe piles are used as pile sinking foundations so that the stability of a pile sinking construction platform can be improved to a great extent, the accuracy of pile sinking construction is ensured, and the construction procedures are simpler.
Owner:CCCC SECOND HARBOR ENG

Deconstructed finite element assembled prestressed pile suitable for pile bottom hammering pile driving

The invention relates to a prestressed concrete composite pile, in particular to a prestressed concrete composite pile adopting post-tensioning method prestress tension. A deconstructed finite elementassembled prestressed pile suitable for pile bottom hammering pile driving comprises a pile body and a pile top. The pile body comprises a pile body plate I and a pile body plate II, a hollow pile body is defined by the pile body plate I and the pile body plate II, and flange structures are embedded into the top and the bottom of the pile body. The middle of the pile top is hollow consistent withthe pile body, a preformed hole allowing a longitudinal prestressed reinforcement to be inserted is formed in the pile top wall in the longitudinal direction, and transverse reinforcements are distributed in the transverse direction at certain intervals. The deconstructed finite element assembled prestressed pile has the beneficial effects that the standard degree is high, and the construction end product quality is high; the product anti-cracking ability is good; noise in the pile driving process can be greatly reduced; concrete can be poured after pile driving is carried out, and the hollowportion can be reserved according to the work condition and design requirements; the pile body wall is adopted as one part of the pile, and the wall protection function of the whole pile is achieved;and multiple piles can be spliced through upper flanges and lower flanges.
Owner:江西联保工程咨询有限公司

A post-grouting device for prefabricated piles and its technology

InactiveCN104234055BGrouting construction method after solutionImprove pile sinking efficiencyBulkheads/pilesPre stressArchitectural engineering
The invention relates to the technical field of foundation stabilization, in particular to a precast pile post-grouting device and a precast pile post-grouting process. The technical scheme adopted by the invention is that the precast pile post-grouting device comprises a precast pile, a stirrer, a slurry tank, a grouting pump and a grouting hose; a pile body of the precast pile is provided with a prestressed reinforcement, a spiral bar, an upper end plate and a lower end plate. The precast pile post-grouting device is characterized in that grouting holes are also formed in the precast pile, and the precast pile is also provided with grouting pipes, an upper transition pipe and a lower transition plate. Compared with the prior art, the precast pile post-grouting device and the precast pile post-grouting process have the beneficial effects that a construction process of pile tip and pile tip peripheral grouting and the arrangement form of the grouting pipes can be realized on piles with various pile diameters (large diameters and small diameters), various pile types (square piles, round piles, hollow piles and solid piles) and various pile lengths (short piles and long piles), and the problems of a post-grouting construction method of all precast pile types are solved.
Owner:顾孙平

Assembly mobile platform for pile driving

The invention provides a prefabricated and movable type platform for pile sinking. The prefabricated and movable type platform for pile sinking is characterized by comprising multiple steel pipe piles which are distributed side by side in the sheet-pile laying direction, wherein the tops of each row of steel pipe piles are provided with a cross beam, longitudinal beams are arranged at equal intervals between every two adjacent cross beams in the sheet-pile laying direction, no longitudinal beam is arranged between the two cross beams located on the edge of a sheet-pile construction area, face sheets are distributed between every two adjacent cross beams, the multiple face sheets are supported on the upper portions of the longitudinal beams and form a walking plane, crawler cranes are placed on the walking plane and can normally walk on the walking plane, no face sheet is arranged between the two cross beams on the edge of the sheet-pile construction area, the two cross beams on the edge of the sheet-pile construction area are located outside the walking plane, and guide frames are arranged between the tops of the two cross beam not provided with the face sheet. The prefabricated and movable type platform for pile sinking is clear in stress, free from the influence of stormy waves and high in pile sinking precision and efficiency.
Owner:CCCC SECOND HARBOR ENG

Concrete prefabricated pipe piles that only bear the pull-out effect

The invention belongs to the field of construction engineering, and in particular relates to a concrete prefabricated pipe pile which only bears the anti-pulling effect. Concrete prefabricated tubular piles that only withstand uplift, including: concrete prefabricated pile body, detachable hollow guide rod, metal pile tip, concrete prefabricated pile body with pile top and pile bottom, concrete prefabricated pile body driven into the foundation soil; concrete The cavity of the prefabricated pile body is provided with a detachable hollow guide rod, the bottom end of the detachable hollow guide rod is provided with a pile tip connecting thread, and the top end of the metal pile tip is provided with a guide rod connecting thread, and the detachable hollow guide rod is connected with the metal pile tip thread. connect. The invention has the following beneficial effects: as for the metal pile tip, as for the concrete prefabricated pipe pile tip, the pile tip can penetrate the hard soil layer more easily, improve the pile driving efficiency, and reduce the disturbance to the surrounding soil body; Recycling and reuse can form a cavity between the pile tip and the foundation soil to save materials. The size of the metal pile tip can be customized and used in a wide range.
Owner:上海杰地建筑设计有限公司

Pile sinking device for assisting prefabricated hollow pile in frozen soil area

The invention discloses a pile sinking device for assisting a precast hollow pile in a permafrost region, which comprises a pile body, an auxiliary cylinder is movably mounted in the pile body, an electric heating block capable of penetrating through the bottom of the pile body is fixedly connected to the bottom of the auxiliary cylinder through a connecting rod, the pile sinking device further comprises a medium pipe extending out of the auxiliary cylinder from the inside of the auxiliary cylinder, and the two ends of the medium pipe extend out of the pile body. And a fixing device is also arranged on the auxiliary cylinder. The auxiliary cylinder and the electric heating block are mounted in the pile body, so that the electric heating block extends to the bottom of the pile body, and during pile sinking operation, the electric heating block is electrified and generates heat to melt frozen soil at the bottom of the pile body and reduce the hardness of the frozen soil, so that the pile sinking operation is easier to perform, and the pile sinking efficiency is improved; and meanwhile, a cooling medium is introduced into the medium pipe, and in the descending process of the pile body, the cooling medium can freeze slurry on the side face of the pile body, so that the fixing effect on the pile body is improved, and the problem that the pile body shakes due to frozen soil melting is solved.
Owner:CHINA POWER CONSRTUCTION GRP GUIYANG SURVEY & DESIGN INST CO LTD

Device and method for sinking aid of steel pipe pile in hard sandy soil layer using high pressure water jet

The invention provides a sinking aid device and method for a steel pipe pile in a hard sandy soil layer by utilizing high-pressure water jets, and solves the problem of defects in the use of the existing water-jet pile sinking method. Including steel pipe piles, a positioning ring is installed inside the steel pipe pile, a positioning annular groove is opened on the inner wall of the bottom end of the steel pipe pile, a positioning device matched with the positioning annular groove is installed on the outer side of the positioning ring, and a water pipe is installed at the bottom of the positioning ring There are annular water pipes installed in the water pipe plate, and a plurality of arc grooves run through the bottom surface of the water pipe plate. The bottom ball of the annular water pipe is hinged with a high-pressure nozzle located in each arc groove, and the annular water pipe is connected to the top plate. For the high-pressure water pipe, a nozzle ring is rotated in the water pipe plate, and nozzle forks located on both sides of each high-pressure nozzle are fixed on the outer surface of the nozzle ring. The steel pipe pile of the present invention can drill the sand layer under the steel pipe pile through the rotating sinking drill bit when the steel pipe pile is piling, so that the obstacles under the steel pipe pile can be cleared, and the pile driving efficiency is improved.
Owner:中铁隧道集团一处有限公司 +1

Construction method of pile sinking based on assembled mobile platform

The invention provides a pile sinking construction method based on an assembly movable platform. The method comprises the following steps that a, steel pipe piles are constructed in a plate pile construction area in the plate pile paving direction side by side; b, the tops of each row of steel pipe piles are provided with a transverse beam; c, longitudinal beams are uniformly arranged between every two transverse beams at intervals and are distributed in the plate pile paving direction; d, panels parallel to the transverse beams are arranged on the longitudinal beams; e, crawler cranes are placed on a walking plane; f, guiding frames are erected between the tops of the two transverse beams which are not provided with the panels; g, plate piles are lifted through the crawler cranes, and the plate piles are constructed after being subjected to guiding positioning through the guiding frame; and h, the panels, the longitudinal plates and the guiding frames between the two transverse beams close to the plate piles are disassembled, and the steps from f to g are repeated in the area where the plate piles are not constructed. According to the pile sinking construction method based on the assembly movable platform, the stress is clear, the method cannot be influenced by wind waves, and the precision and efficiency of pile sinking are high.
Owner:CCCC SECOND HARBOR ENG

Prefabricated and movable type platform for pile sinking

The invention provides a prefabricated and movable type platform for pile sinking. The prefabricated and movable type platform for pile sinking is characterized by comprising multiple steel pipe piles which are distributed side by side in the sheet-pile laying direction, wherein the tops of each row of steel pipe piles are provided with a cross beam, longitudinal beams are arranged at equal intervals between every two adjacent cross beams in the sheet-pile laying direction, no longitudinal beam is arranged between the two cross beams located on the edge of a sheet-pile construction area, face sheets are distributed between every two adjacent cross beams, the multiple face sheets are supported on the upper portions of the longitudinal beams and form a walking plane, crawler cranes are placed on the walking plane and can normally walk on the walking plane, no face sheet is arranged between the two cross beams on the edge of the sheet-pile construction area, the two cross beams on the edge of the sheet-pile construction area are located outside the walking plane, and guide frames are arranged between the tops of the two cross beam not provided with the face sheet. The prefabricated and movable type platform for pile sinking is clear in stress, free from the influence of stormy waves and high in pile sinking precision and efficiency.
Owner:CCCC SECOND HARBOR ENG

Pile sinking positioning equipment

The invention discloses a pile sinking positioning device, which relates to the technical field of positioning pile sinking equipment, comprising a positioning device, a transport device and a pile sinking device, the positioning device includes a bottom plate, a distance control machine and a driving wheel, and the transport device includes a belt connecting rod, The conveying belt and the belt limit groove, the pile sinking device includes a pile sinking connecting plate, a pile sinking lifting rod, a pile sinking block, a pile sinking rotary machine, a turning plate, a turning plate limiting groove, a rotating buckle and a rotating bottom plate; The control machine controls the driving wheel to carry out pile sinking positioning. A conveyor belt and multiple belt limit slots are provided on the conveyor belt to carry and transport the positioning piles. At the pile sinking site, the positioning piles on the conveyor belt are transported to In the limit groove of the turning plate of the turning plate, after turning over by the pile sinking turning machine, the pile sinking lifting rod drives the pile sinking block to strike repeatedly to complete the pile sinking work. The pile sinking efficiency is high, and the labor intensity of workers is small, which meets the needs of modern buildings.
Owner:重庆新动生物技术有限公司

Water jet sprayer assisting offshore platform in sinking pile

The invention discloses a water jet sprayer assisting an offshore platform in sinking a pile. The water jet sprayer comprises a barrel body with a water inlet and a water outlet, and a core tube arranged in an inner cavity of the barrel body, wherein a hollow core tube inner cavity is formed in the core tube; a plugging member for selectively plugging the water inlet is arranged on the top of the core tube; an annular baffle plate with a plurality of water holes, a plurality of water channels extending along an axial direction of the core tube, a guide impeller with spiral guide blades and a spiral nozzle which is arranged at the bottom of the core tube and provided with a spiral channel are sequentially arranged on the core tube below the plugging member; and an outer ring nozzle is formed between the outer wall of the spiral nozzle and the inner wall of the water outlet of the barrel body. During pile sinking, the water jet sprayer jets high-pressure water at high speed in the form of combined jet flow to scour a soil body in the pile, so that soil blockage in the pile can be removed effectively, the power pile sinking resistance is reduced, the pile sinking efficiency is improved, and aims of shortening the platform construction period and reducing the construction cost are fulfilled.
Owner:CHINA UNIV OF PETROLEUM (EAST CHINA)

Sealing and connecting structure for pile driving

The invention discloses a sealing and connecting structure for pile driving. The seal connection structure comprises a plurality of inter-pile sealing structures evenly distributed and a plurality of inter-pile connecting structures which are arranged between first sub pile bodies and second sub pile bodies of the pile bodies, and each inter-pile sealing structure is composed of a first sealing groove downward extending from the top of the first sub pile bodies and arranged on the upper side of the first sub pile bodies, and a second sealing groove downward extending from the top of the second sub pile bodies and arranged on the upper side of the second sub pile bodies; botches of the two sealing grooves are opposite, and each inter-pile connecting structure is composed of a concave connecting member downward embedded in the first sub pile bodies from the top of the first sub pile bodies, and a convex connecting member downward arranged in the second sub pile bodies from the top of the second sub pile bodies; and the embedding part of the convex connecting member is embedded into the cavity of the concave connecting member, so that the two sealing grooves are in butt joint to form an inter-pile water space filled with flexible filler, and an inter-pile closed space is formed in the cavity of the concave connecting member, and filled with grout for consolidation. The sealing and connecting structure disclosed by the invention has the advantages of simple structure, low cost, and high reliability and adaptability, and can be used for driving piles into soil quickly.
Owner:ZHEJIANG RECLAIM NINGBO HONGYANG CONSTR
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products