33 results about "Structural rehabilitation" patented technology

Home / Services / Structural Rehabilitation. Structural rehabilitation involves the upgrading or changing of a building’s foundation in support of changes in the building’s owners, its use, design goals or regulatory requirements.

Construction plant for repairing and strengthening tunnel lining structures

The invention relates to a construction plant for repairing and strengthening tunnel lining structures. The construction plant is characterized by comprising a running gear, any ring construction device (1 to 8) required in the invention, a lifting device with a lifting platform, a control device for controlling the construction plant to work and a driving device for driving a supporting arm to rotate. The lifting device is installed on the running gear; the ring construction device and the driving device are both installed on the lifting platform; and the control device is installed on the running gear. The construction plant has the beneficial effects that the construction flow is mastered through the plant, the automatic degree is high, a person does not need to enter a tunnel for construction, and the labor cost is saved; the mechanized construction quality is higher than the manual construction quality, coating of epoxy resin glue is even, a carbon fiber sheet is tightly and smoothly bonded, and the repairing and strengthening effect and the construction efficiency are guaranteed; and the construction plant is suitable for repairing and strengthening construction of the tunnel lining structures in different sizes, suitable for construction under various weather conditions and engineering environments and good in engineering adaptability.
Owner:HOHAI UNIV

Concrete structure repairing method based on carbonization hardening

The invention discloses a concrete structure repairing method based on carbonization hardening. The concrete structure repairing method comprises the following steps: cleaning an area that needs repairing; filling or smearing a repairing material, wherein the repairing material is prepared from the following components in parts by weight: 100 parts of a carbonized cementing material, 1 to 10 partsof a carbonization reinforcing agent, 5 to 70 parts of fine aggregate, 2 to 6 parts of a water reducing agent and 6 to 16 parts of water; sealing the to-be-repaired area by using a sealing device; and introducing carbon dioxide repairing gas into the closed to-be-repaired area. Based on a carbonization hardening principle, the repairing material is high in strength development speed and strengthgrade, and the repaired area can be quickly put into the service process. The volume of the repairing material can slightly expand in the carbonization process, the volume stability is excellent in the later service process, the repairing material is tightly combined with a matrix, the cohesiveness is high, and the falling phenomenon is not likely to occur. The fluidity of the repair slurry can bedesigned and regulated, the repair slurry is suitable for various processes such as smearing, spraying and irrigation, and the engineering applicability is high.
Owner:WUHAN UNIV OF TECH

Multi-azimuth repairing method for damaged historic building column

The invention discloses a multi-azimuth repairing method for a damaged historic building column.For the defects in the prior art, the method comprises the steps that the whole repairing process is divided into structure repairing, color repairing and fire preventing repairing; in the structure repairing process, complete repairing of the column is achieved through the steps of mending treatment achieved by replacing a damaged part, cleaving treatment, pouring and reinforcing and column splicing, a firm structure is given to a historic building again, the capacity of the historic building for resisting natural disasters is improved, the structural firmness is guaranteed, and the service life is indirectly prolonged; in the color repairing process, a column image is processed through a partitioning algorithm, an ideal repairing effect is calculated, a new appearance is given to the historic building, the appearance is more attractive, and not only is the original style and features of the historic building are reserved, but also aesthetic appreciation of modern people is met; by means of fire preventing repairing, the fireproof property of the historic building is enhanced, the fire-resistant level is improved, and the occurrence probability of safety accidents is reduced.
Owner:ZHEJIANG UNIV OF WATER RESOURCES & ELECTRIC POWER

Hollow identifier-based method for preserving structure and enhancing real identifier hiding

The invention discloses a hollow identifier-based method for preserving a structure and enhancing real identifier hiding. The method comprises the following steps: obtaining a video frame of a to-be-hidden identifier from camera equipment; calculating a three-dimensional position and orientation, relative to an identifier, of a camera according to a two-dimensional position of the identifier; projecting a hollow area mask of a hollow identifier onto a plane where the identifier is located, so as to determine a to-be-repaired mask in a video picture; automatically detecting information of a background structure adjacent to a to-be-repaired area according to the to-be-repaired mask, so as to obtain background structure characteristics; repairing the detected background structure according to the background structure characteristics, so as to obtain a structure repair image and a structure to-be-repaired mask; and utilizing an existing image repair algorithm to carry out repair hiding on a non-structure identifier according to the structure repair image and the structure to-be-repaired mask, so as to obtain a final repair effect image. According to the hollow identifier, the to-be-repaired area after identifier removal is decreased, relatively strong structural performance can be preserved during the identifier hiding, and the identifier hiding efficiency and effect are improved.
Owner:ZHEJIANG UNIV OF TECH

Frame column replacement and reinforcement construction method

ActiveCN113756601ASolve the problem of replacement reinforcementHigh construction technology contentBuilding repairsArchitectural engineeringEconomic benefits
The invention relates to a frame column replacement and reinforcement construction method, and belongs to the technical field of completed building structure repair. The frame column replacement and reinforcement construction method comprises the steps of firstly, correspondingly arranging supporting steel columns in the four directions of to-be-replaced frame columns of the layer and the four directions of upper and lower frame columns, and arranging jacks between the supporting steel columns and beam bottoms; then removing all the to-be-replaced frame columns, wherein the tops are removed to the upper ground; then installing a column formwork, wherein the top of the column formwork is designed to be a horn mouth formwork higher than the upper ground; then pouring concrete and curing from the horn mouth formwork on the upper layer; and finally, removing the formwork and the supporting steel columns. The method has the advantages of advanced construction process, high construction technical content, high operability, close procedure connection and fast construction progress, the construction cost is reduced while the construction quality is guaranteed, obvious economic benefits are generated, and the method is worthy of application and popularization.
Owner:SHANXI WUJIAN GRP CO LTD

A construction method for repairing wooden structures of ancient buildings

The invention discloses an ancient wood building repairing construction method which comprises the following steps: (a) performing scene investigation; (b) erecting a scaffold; (c) reinforcing a wood structure; (d) performing wood structure preservative treatment; (e) performing fireproof treatment on the wood structure; (f) performing field arrangement; (g) performing wood structure engineering acceptance. According to the method disclosed by the invention, the current situation in which the wood structure is positioned can be comprehensively mastered, the ancient wood building is subjected to reinforcement and protection through overall reinforcement and single wood reinforcement, the stress performance of the wood structure is improved under the condition that the original structure is not damaged, overall design of the ancient wood building is guaranteed, collapse of the ancient building is avoided, the corrosion resistance of the wood structure is improved due to the wood structure preservative treatment, the safety performance of the wood structure is improved due to fireproof treatment of the wood structure, the service life of the ancient building is prolonged, the aesthetic property of the ancient building is improved, and the method has obvious social and economic values.
Owner:ZHEJIANG UNIV OF WATER RESOURCES & ELECTRIC POWER

A foundation pit support repair structure and its construction method

The invention discloses a foundation pit supporting and repairing structure. A repairing expansion ring is provided with two coiling ends, the two coiling ends of the repairing expansion ring can moverelative to each other, and at least two one-way locking mechanisms are arranged between the two coiling ends of the repairing expansion ring; the one-way locking mechanisms are used for limiting theretraction motions of the two coiling ends of the repairing expansion ring. A repairing frame comprises two mounting rubber rings which sleeve the repairing expansion ring and are arranged up and down, and a plurality of reinforcing steel bars are circumferentially arranged between the two mounting rubber rings at equal intervals; after an air bag body is inflated, the inner diameter of the repairing expansion ring can be driven to expand so that the mounting rubber rings can be tightly attached to the inner wall of a foundation pit support row pile, and the two mounting rubber rings, the outer wall of the repairing expansion ring and the inner wall of the foundation pit support row pile define a grouting space. A grouting pipe is used for introducing concrete slurry into the grouting space. The structure has the advantage of being high in foundation pit support row pile repairing convenience.
Owner:广东建基基础工程有限公司

A structure-preserving augmented reality logo hiding method based on hollow logo

The invention discloses a hollow identifier-based method for preserving a structure and enhancing real identifier hiding. The method comprises the following steps: obtaining a video frame of a to-be-hidden identifier from camera equipment; calculating a three-dimensional position and orientation, relative to an identifier, of a camera according to a two-dimensional position of the identifier; projecting a hollow area mask of a hollow identifier onto a plane where the identifier is located, so as to determine a to-be-repaired mask in a video picture; automatically detecting information of a background structure adjacent to a to-be-repaired area according to the to-be-repaired mask, so as to obtain background structure characteristics; repairing the detected background structure according to the background structure characteristics, so as to obtain a structure repair image and a structure to-be-repaired mask; and utilizing an existing image repair algorithm to carry out repair hiding on a non-structure identifier according to the structure repair image and the structure to-be-repaired mask, so as to obtain a final repair effect image. According to the hollow identifier, the to-be-repaired area after identifier removal is decreased, relatively strong structural performance can be preserved during the identifier hiding, and the identifier hiding efficiency and effect are improved.
Owner:ZHEJIANG UNIV OF TECH

Method and system for local translation correction of large chassis structure

The invention provides a method and system for rectifying partial translation of a large chassis structure. The position where the displacement deviation of the large chassis structure engineering is detected is defined as a pre-cut structure; the structural main bodies on both sides of the local translation pre-cut structure of the large chassis structure are supported; through limited The element software simulates and calculates, and strengthens the main body of the structure; introduces the historical monitoring data of the site as the initial condition into the finite element calculation software, and arranges new dynamic monitoring measuring points for the main body of the structure; performs stress release on the soil on the other side of the translation , to form an operable space for underground horizontal pushback; cut off the connection between the pre-cut structure and the main body of the structure on the vertical plane, and become a free and independent rigid body that can be pushed; install horizontal graded loading on the translation side of the free independent rigid body The device applies an external force to move a free and independent rigid body; after the movement is completed and reaches a stable state, the structural main body of the cut structure is repaired. After the repair is completed, the soil is backfilled and the deviation correction is completed.
Owner:浙江瑞邦科特检测有限公司

Construction equipment for repair and reinforcement of tunnel lining structure

The invention relates to a construction plant for repairing and strengthening tunnel lining structures. The construction plant is characterized by comprising a running gear, any ring construction device (1 to 8) required in the invention, a lifting device with a lifting platform, a control device for controlling the construction plant to work and a driving device for driving a supporting arm to rotate. The lifting device is installed on the running gear; the ring construction device and the driving device are both installed on the lifting platform; and the control device is installed on the running gear. The construction plant has the beneficial effects that the construction flow is mastered through the plant, the automatic degree is high, a person does not need to enter a tunnel for construction, and the labor cost is saved; the mechanized construction quality is higher than the manual construction quality, coating of epoxy resin glue is even, a carbon fiber sheet is tightly and smoothly bonded, and the repairing and strengthening effect and the construction efficiency are guaranteed; and the construction plant is suitable for repairing and strengthening construction of the tunnel lining structures in different sizes, suitable for construction under various weather conditions and engineering environments and good in engineering adaptability.
Owner:HOHAI UNIV

A repairing structure and repairing construction method for foundation pit supporting and retaining piles

The invention discloses a repairing structure for a foundation pit supporting pile. A repairing frame is covered at a crack position of the foundation pit supporting pile. The repairing frame comprises a first iron wire, a second iron wire and a plurality of steel bars, the steel bars are vertically distributed at intervals, the first iron wire and the second iron wire are connected in a head-tail mode and fixed around the foundation pit supporting pile. A repairing mounting ring comprises a left mounting ring and a right mounting ring which are arranged in a semi-annular shape correspondingly, one end of the left mounting ring is hinged to one end of the right mounting ring, the other end of the right mounting ring is connected with a connecting boss, and a locking part for tightening the left mounting ring is arranged at the other end of the right mounting ring.A grouting space for covering the repairing frame is formed among the left mounting ring,the right mounting ring and the foundation pit supporting pile, and a grouting nozzle communicating with the grouting space is formed in the left mounting ring and / or the right mounting ring. A grouting pipe is connected to the grouting nozzle for introducing concrete slurry. According to the key points of the technical scheme,the repairing structurehas the characteristics of high convenience of repair.
Owner:广东广强基础工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products