Computer-implemented method for
production planning and / or
production control of a production
system comprising several production sections (PA1, PA2) and production lines (Line 1, Line 2, Line 3), the method comprising the steps • Obtaining data including
material requirements of the production sections (PA1, PA2) (V1), • Ordering the
material requirements in the production sections (PA1, PA2) after influencing an optimization of a cost function of the production
system (V2), • properly selecting one of the
material requirements (V3), projecting the selected material requirement onto materials in preceding production sections (PA1, PA2) that are required for production in the production section (PA1, PA2) of the selected material requirement (V4), and adjusting at least one required quantity and / or one required time of the respective materials (V5), and Regulating and / or controlling the production lines (Line 1, Line 2, Line 3) depending at least on the adjusted requirement quantity and / or the requirement time (V6) and first checking whether the adjusted requirement quantity of the respective materials is sufficient for the selected material requirement (V7), whereby if the first check is positive, the respective materials are reserved for the production
system and / or the selected material requirement is carried out (V7a), and a further material requirement is duly selected (V7b), where the production system,
production planning and / or
production control are simulated and in the
simulation • the production lines (Line 1, Line 2, Line 3) are regulated and / or controlled depending at least on the adjusted required quantity and / or the required time, • the material requirements are properly selected and • in an initial check, it is checked whether the adjusted requirement quantity of the respective materials is sufficient for the respective selected material requirement, whereby if the initial check is positive, the respective materials are reserved for the production system and / or the selected material requirement is carried out and a further material requirement is duly selected.