Constraint programming (CP) is a paradigm for solving combinatorial problems that draws on a wide range of techniques from artificial intelligence, computer science, and operations research. In constraint programming, users declaratively state the constraints on the feasible solutions for a set of decision variables. Constraints differ from the common primitives of imperative programming languages in that they do not specify a step or sequence of steps to execute, but rather the properties of a solution to be found. In additions to constraints, users also need to specify a method to solve these constraints. This typically draws upon standard methods like chronological backtracking and constraint propagation, but may use customized code like a problem specific branching heuristic.

Power transformer risk assessment method based on fault tree

The invention provides a power transformer risk assessment method based on a fault tree. The power transformer risk assessment method comprises the following steps that 1) according to the given fault tree, fuzzy judgment matrixes R are built by using the fuzzy analytic hierarchy process; 2) according to the fuzzy judgment matrixes R, a constraint programming problem equation set is written out, wherein the severity weights omega i of various fault causes are obtained according to the constraint programming problem equation set, and the severity weights vector W satisfying the equation that W=[omega 1, omega 2,...omega n](T) is obtained; 3) according to the severity weights vector W, the optimal solution of the severity weight omega i enabling an adaptive value Z to be minimum is obtained; 4) the optimal solution of the severity weight omega i is substituted into the formula (4) to obtain the risk coefficients of the fault causes of a transformer. According to the power transformer risk assessment method, matrixes achieving fuzzy judgment consistency do not need to be built, and risk of the transformer can be assessed under the circumstance that the fuzzy judgment matrixes are not consistent; compared with the method in which the matrixes achieving fuzzy judgment consistency have to be built in the prior art, the power transformer risk assessment method is simple in algorithm, rapid and relatively high in precision.
Owner:STATE GRID CORP OF CHINA +2

Circuit breaker reliability evaluation method based on glowworm optimization algorithm

The invention discloses a circuit breaker reliability evaluation method based on a glowworm optimization algorithm. The circuit breaker reliability evaluation method comprises the following steps: determining a main fault mode of the circuit breaker; establishing a circuit breaker fault tree; establishing a fuzzy judgment matrix between the fault factors of the circuit breaker; converting a fuzzy consistency qualification used for solving each fault factor weight into a constrained optimization problem; according to an established constraint programming problem equation, importing the glowworm optimization algorithm to solve the severity weight of each fault factor; and establishing a circuit breaker reliability evaluation model to carry out reliability evaluation and obtain a circuit breaker reliability evaluation result. When the fuzzy judgment matrixes are inconsistent, circuit breaker reliability evaluation can be carried out, and the practicability of the method is improved. In addition, when the circuit breaker reliability evaluation method calculates the severity weight of each fault factor, the glowworm optimization algorithm is introduced. Compared with the traditional calculation method, the circuit breaker reliability evaluation method has the advantages of being high in convergence precision and high in convergence speed and can more simply and quickly realize circuit breaker reliability evaluation.
Owner:YUNNAN POWER GRID CO LTD ELECTRIC POWER RES INST

Flexible load-considered multi-target day-ahead economic dispatching model and method

The invention discloses a flexible load-considered multi-target day-ahead economic dispatching model and a flexible load-considered multi-target day-ahead economic dispatching method. The method comprises the steps of firstly, establishing a wind power output uncertainty model and a load uncertainty model; considering the economic cost and the carbon emission of the system at the same time; respectively modeling a thermal power generating unit and a flexible load in the system, processing the spinning reserve constraints of the system by adopting opportunity constraint programming, solving themodel by adopting an improved CMOPSO algorithm, and finding an optimal compromise solution from a Pareto solution set by utilizing a fuzzy membership function, namely balancing the solutions of two target functions. According to the method, a unit output plan of the next day can be made before the day. The fluctuation of wind power and loads is met with a certain confidence coefficient, and the reliability of system operation is guaranteed. The demand side flexible load participates in system scheduling and can be coordinated and matched with the power generation side to achieve the effects of peak clipping and valley filling and relieving the power utilization pressure in the peak period. The improved algorithm can increase the search range of the target space and improve the convergenceand diversity of the algorithm.
Owner:HEFEI UNIV OF TECH

Energy storage power station dynamic configuration method, system and equipment considering uncertainty

The invention relates to an energy storage power station dynamic configuration method, system and device considering uncertainty, and the method comprises the steps: S100, building a wind power output model based on a fuzzy opportunity constraint programming method, and building a photovoltaic output model based on an uncertainty set; s200, determining a locating and sizing strategy of the energy storage power station by adopting a PV curve; s300, considering the randomness of the user demand response, and establishing a price-based user demand response uncertainty model; and S400, establishing an energy storage dynamic planning model based on the constructed wind power output model, the photovoltaic output model, the user demand response uncertainty model, the addressing and sizing strategy and the corresponding relationship between the power grid energy storage mode and the user demand response, and solving the energy storage power station configuration mode based on the energy storage dynamic planning model. According to different seasons, time periods and power grid operation scene replacement conditions, the energy storage configuration mode is dynamically updated, energy storage devices are increased and decreased in time, flexible distribution and dynamic layout of energy storage are achieved, and the stability of the system is improved.
Owner:国网安徽省电力有限公司亳州供电公司 +1

Water quality evaluation method based on continuous time neurodynamic network

The invention discloses a water quality evaluation method based on a continuous time neurodynamics network, and the method comprises the following steps: 1, determining an objective function and constraint conditions of a fuzzy opportunity constraint programming problem through combining a water quality evaluation problem with a given confidence level, and constructing the fuzzy opportunity constraint programming problem; 2, determining an equivalent optimization problem of the fuzzy opportunity constraint programming problem; 3, constructing a neurodynamic network with continuous time for solving the equivalent optimization problem; and 4, giving an initial state of a variable, operating a circuit according to the constructed neurodynamics network, operating the circuit to a balance state to obtain an optimal solution of an original problem, namely obtaining an optimal hyperplane equation for water quality evaluation, finally substituting test data, and outputting a water quality evaluation result according to the hyperplane equation. The water quality evaluation method based on the neurodynamics network has the continuous time characteristic and can meet the requirement for real-time solving of the water quality evaluation problem in practice.
Owner:HEBEI UNIV OF ENG +1

Safety assessment method of distribution network operation based on recovery value of distribution network failure and loss of load

The invention relates to an operating safety assessment method based on distribution network fault lost load recovery values, belonging to the technical field of power system dispatching automation and power grid simulation. The method comprises the steps of: carrying out N-1 fault scanning on a distribution network, and carrying out recovery and optimization calculation on lost electrical loads in each fault so as to obtain recoverable lost electrical load values; after the scanning is completed, accumulating lost electrical loads recovered each time so as to obtain a total recovered lost electrical load value; and establishing distribution network operating safety indicators according to a total lost electrical load value, a total recoverable lost electrical load value and the total recovered lost electrical load value. During the recovery and optimization of fault lost loads, active, reactive, voltage and radial operating restricted detailed distribution network recovery and optimization models are taken into account, and the problem of mixed integer quadratic constraint programming is solved by adopting a branch and bound method. According to the method, indicators for distribution network operating safety assessment are developed based on the optimization models, and then, the operating conditions and the safety of a network configuration of the current distribution network can be reflected.
Owner:STATE GRID CORP OF CHINA +2

A robot joint acceleration constraint planning method and system

The invention discloses a robot joint acceleration constraint planning method and system, belonging to the field of robot motion track kinematics planning. Including: establishing the D-H model of each link of the robot, obtaining the homogeneous transformation matrix and the rotation transformation matrix of the D-H link coordinate system; respectively transforming the centroid coordinates of each link from the base coordinate system to the corresponding D-H In the H-link coordinate system, obtain the equivalent moment of inertia on the motor shaft of each joint under the current pose; consider the influence of the load, update the equivalent moment of inertia; establish the dynamic equation of each link, and obtain the acceleration and motor output The functional relationship of the torque; according to the equivalent moment of inertia and the functional relationship, the amplitude constraint of the acceleration is obtained. The invention can comprehensively consider the influence of the gravity of the connecting rod of the robot and the end load on the equivalent moment of inertia of the motor shaft of each rotating joint, and analyze the maximum value of the acceleration of the motor shaft of the joint in this posture, thereby improving the motion efficiency.
Owner:HUAZHONG UNIV OF SCI & TECH

A circuit breaker reliability evaluation method based on firefly optimization algorithm

The invention discloses a circuit breaker reliability evaluation method based on a glowworm optimization algorithm. The circuit breaker reliability evaluation method comprises the following steps: determining a main fault mode of the circuit breaker; establishing a circuit breaker fault tree; establishing a fuzzy judgment matrix between the fault factors of the circuit breaker; converting a fuzzy consistency qualification used for solving each fault factor weight into a constrained optimization problem; according to an established constraint programming problem equation, importing the glowworm optimization algorithm to solve the severity weight of each fault factor; and establishing a circuit breaker reliability evaluation model to carry out reliability evaluation and obtain a circuit breaker reliability evaluation result. When the fuzzy judgment matrixes are inconsistent, circuit breaker reliability evaluation can be carried out, and the practicability of the method is improved. In addition, when the circuit breaker reliability evaluation method calculates the severity weight of each fault factor, the glowworm optimization algorithm is introduced. Compared with the traditional calculation method, the circuit breaker reliability evaluation method has the advantages of being high in convergence precision and high in convergence speed and can more simply and quickly realize circuit breaker reliability evaluation.
Owner:YUNNAN POWER GRID CO LTD ELECTRIC POWER RES INST

Computing task allocation method and system for community cloud system

The present invention provides a calculation task assignment method and system of a community cloud system. The method includes the steps of: obtaining the number of available on-board computers, the computing capability of each on-board computer, and a plurality of calculation tasks that need to be allocated; according to each on-board computer The calculation tasks undertaken and the transmission power of the transmission calculation tasks between the data center and each on-board computer are established using a single-objective multi-constraint programming method to establish a mathematical model of the objective function and constraints; a single-objective multi-constraint genetic algorithm is used to solve the mathematical model To obtain the optimal calculation task allocation scheme; according to the optimal calculation task allocation scheme, the calculation tasks are allocated to the corresponding on-board computer for processing. Using the idle on-board computer in the parking lot in the community, part of the computing tasks in the data center are handed over to the on-board computer for processing, so that the design of the data center does not need to be based on the maximum demand for access in the community, thereby avoiding the need for community cloud system hardware resources. Waste of vehicle computer hardware resources.
Owner:GUANGDONG PLANNING & DESIGNING INST OF TELECOMM
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products