Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

36 results about "Information planning" patented technology

Vehicle path planning method, vehicle path planning system and vehicle navigation apparatus

The present invention provides a vehicle path planning method, a vehicle path planning system and a vehicle navigation apparatus so as to solve the problem of no real time traffic condition consideration of the static path planning method. The method comprises: acquiring a starting point coordinate and an end point coordinate of a vehicle; periodically downloading real-time traffic information, wherein the real-time traffic information comprises traffic congestion information and specific event information; and according to the starting point coordinate, the end point coordinate and a real-time traffic information planning path, comparing the currently downloaded real-time traffic information to the last downloaded real-time traffic information to determine whether the real-time traffic condition on the planned path is changed, wherein the path is re-planned according to the current position coordinate, the end point coordinate and the currently-downloaded real-time traffic information if the real-time traffic condition on the planned path is changed. With the present invention, traffic congestion roads can be dynamically evaded so as to provide the fastest driving path for a vehicle driver.
Owner:BEIJING TRANWISEWAY INFORMATION TECH

Comprehensive microgrid planning and design evaluation system based on OTFN-AHP

InactiveCN103530823AGuaranteed mutual independenceImprove accuracyData processing applicationsDesign planComputational model
The invention discloses a comprehensive microgrid planning and design evaluation system based on an OTFN-AHP (optimized triangular fuzzy number analytic hierarchy process), and belongs to the technical field of electric information planning. An evaluation method comprises the steps that 1) a microgrid planning and design evaluation index system is determined; 2) computation models of microgrid evaluation indexes and reasonable and practical non-linear membership function models of the indexes are provided, so that quantized values of the indexes are obtained; 3) the traditional analytic hierarchy process and a fuzzy mathematic theory are combined and optimized to form the OTFN-AHP; 4) the fuzziness of an ordering vector is removed by utilizing a centroid method variable according to preference of a decision maker; 5) relative weights of the indexes are solved by nonlinear planning according to the ordering vector; and 6) an advantage and disadvantage degree of a microgrid is determined according to the quantized values and the weights of the indexes; and an evaluation report of the micogrid is output. The evaluation system can make scientific and objective evaluation on microgrid planning and design schemes in different structures, so that the evaluation system provides a reasonable reference for the decision maker, and has very high actual instruction significance.
Owner:HUNAN UNIV

Navigation equipment as well as route planning method and navigation method thereof

The invention relates to navigation equipment as well as a route planning method, a navigation method and a route display method thereof. The route planning method comprises the following steps of: determining departure information and destination information; determining a route planning mode, wherein the route planning mode comprises a walking mode and a driving mode; obtaining a planned route according to the determined departure information and destination information, the route planning mode and geographic information planning route stored in advance. By adopting the technical scheme, the route planning method is suitable for driving navigation and walking navigation and greatly improves the utilization rate of the navigation equipment.
Owner:SHENZHEN CARELAND TECH

Project management support device and method thereof

Disclosed is a project management support device which compares, when a project is planned, standard work information stored in a standard work information database 21 with work information planned based on the standard work information according to a project target or a project condition, displays added or omitted work information extracted from the comparison and information to be noted which is related to the added or omitted work information on a display device 4. The project management support device further compares, during implementation of the project, the standard work information stored in the standard work information database 21 with work information changed based on progress or a state of the work in the project, and displays the added or omitted work information extracted from the comparison and information to be noted which is related to the added or omitted work information on the display device 4.
Owner:HITACHI LTD

Path guiding method and path guiding equipment

ActiveCN101709978AIntuitive and clear acquisitionAvoid the disadvantages that cannot be properly understoodInstruments for road network navigationPath generationGeolocation
The invention relates to a path guiding method. The method comprises the following steps: sending path guiding request information; receiving path guiding information which comprises a picture used for describing the geographical condition of a geographical position point in a recommended path and is generated according to the recommended path by a receiving end of the path guiding request information planning the recommended path according to the path guiding request information; and displaying the path guiding information. The invention also relates to a path guiding system. The system comprises a sending unit, a receiving unit and a display unit. The technical scheme can provide a recommended path guiding route and displays the guiding route in a picture; and, a user in need of path guidance can clearly acquire an optimal route and detailed information of important geographical position points on the route, so the trouble of asking the way is reduced, and the disadvantage that correct understanding cannot be realized by a telephone communication mode is avoided.
Owner:SHENZHEN CARELAND TECH

Power enterprise safety production management method based on Internet of Things management and control

PendingCN113741368ACovers risk pre-controlCover hidden danger managementProgramme total factory controlData analysis systemFault analysis
The invention discloses a power enterprise safety production management method based on Internet of Things management and control, and the method comprises the following steps: S1, building a three-dimensional model: carrying out the omnibearing three-dimensional real scene display, S2, editing the three-dimensional model: editing the three-dimensional model of a power plant, S3, locking equipment: connecting key equipment and a system in the power plant, and S4, carrying out real-time monitoring and feedback: realizing real-time operation state monitoring of key equipment and a system; S5, carrying out planning and information recording: establishing an information planning and recording system, S6, carrying out safety management and control: managing and controlling the working state and safety of operators in a field, S7, carrying out analysis and archiving: establishing a big data analysis system and automatically counting various operation abnormity and fault information, and S8, carrying out querying and compiling: establishing a query system to generate an editable and modifiable fault analysis report. According to the invention, double prevention management requirements are taken as a core, a safety production standardization system is constructed, and risk pre-control, hidden danger treatment, emergency management, safety training and the like are covered.
Owner:华能信息技术有限公司

Production planning apparatus and production planning method

Provided is a production planning apparatus including: a storage unit configured to store: actual performance information on a resource required for production; a planning master including a plan of a resource required for work of the production; and a planning parameter including a variable required for a production plan; a parameter generation processing unit configured to change the plan of the resource required for the work, which is included in the planning master, based on a difference between the plan of the resource, which is included in the planning master, and actual performance of the resource required for the production, which is included in the actual performance information, and change the planning parameter based on how greatly the planning master is changed; and a production plan processing unit configured to calculate a production plan that uses the planning master and the planning parameter.
Owner:HITACHI LTD

Power grid planning geographic information platform and manufacturing method therefor

InactiveCN108538185ASatisfy securityExtensive information exchangeMaps/plans/chartsInformation repositorySoftware system
The invention discloses a power grid planning geographic information platform, and the platform comprises a platform control system and an information source system. The information source system provides data support for the platform control system, and the platform control system takes the Ovitalmap platform as the core, and is provided with the Google map platform and a CAD software system as assistance. The information source system includes a power grid information planning special tool and an information base, wherein the information base provides available information data for the powergrid information planning special tool. Moreover, the invention provides a manufacturing method for the power grid planning geographic information platform. The platform greatly improves the work efficiency, is low in construction cost, is low in maintenance cost, is convenient to maintain, is strong in information interaction capability, is high in precision, and is good in compatibility.
Owner:STATE GRID CORP OF CHINA +1

Garden engineering construction virtual information planning and intelligent arrangement system

The invention discloses a garden engineering construction virtual information planning and intelligent arrangement system, and belongs to the technical field of garden engineering construction. The system comprises: a PLC control unit, wherein the input end of the PLC control unit is connected with the input end of a nursery stock database. According to the method, according to geographical location information and environment information of environment monitoring points of different regions, and in combination with growth environment information and planted region information of nursery stocks, the nursery stocks adapted to be planted in different environments and different seasons are determined, and nursery stock labels are marked on the corresponding planted regions; according to divided areas of different regions and planted areas of the nursery stocks, intelligent arrangement is performed on the nursery stocks, that is, related personnel design various arrangement matrices, intelligent arrangement is performed according to the geographic information, the environment information, soil information, and information of different types of the nursery stocks; then a garden engineering construction scheme is simulated through virtual display. Thus, a planning strategy is effectively adjusted according to planning information of the regions, the design period is effectively shortened, and the construction cost of garden engineering is reduced.
Owner:武汉点溪园生态景观发展有限公司

Line loss information planning system based on actual measurement information

The invention discloses a line loss information planning system based on actual measurement information. According to the system, the heat energy flow rule of a terrain is simulated by acquiring the terrain, altitude and weather information on that day and arranging a small number of temperature sensors, wind speed sensors and wind direction sensors so as to simulate a heat energy flow model; and the temperature information of a test area is obtained according to the heat energy flow model, and a temperature-line loss model is established according to the deviation between a theoretical technical line loss value calculated according to the prior art and an actual technical line loss value. According to the invention, the temperature-line loss model can adapt to power grids in different regions, and the system considers the influence of complex environment temperature factors of the power grids on the line loss, so that the calculated theoretical technical line loss value is very close to the actual technical line loss value.
Owner:ANHUI XINLT POWER TECH CONSULTING +3

All-data online medical record management system based on medical history of patient

The invention discloses a full-data online medical record management system based on the medical history of a patient. The system comprises a medical record data acquisition module, a medical record data normalizing module and a pocket medical record application model, the medical record data acquisition module is used for quickly acquiring original medical data information of a patient by acquiring a hospital system interface; the original medical data comprises clinical diagnosis and treatment information, text inspection sheet data and image inspection data; the medical record data normalizing module performs disease course information planning on the medical data information acquired by the medical record data acquisition module according to a time axis dimension and stores the medical data information in the pocket medical record application model, and the pocket medical record application model comprises a medical record data retrieval module. And a user can inquire the medical record data information of the patient through the outpatient service information dimension, the hospitalization dimension or the inspection dimension in the pocket medical record application model.
Owner:杭州联众医疗科技股份有限公司

Information processing device, information processing method, and program

An information processing device according to one embodiment of the present disclosure includes: a TO-DO task information acquisition portion configured to acquire information about an unexecuted TO-DO task of a user; a plan information acquisition portion configured to acquire information about a forward plan of the user; and a TO-DO task execution support portion configured to notify, via a user terminal, the user of information on a facility related to execution of the TO-DO task in association with a plan accompanied with movement in the forward plan, the facility related to execution of the TO-DO task being placed around a moving route corresponding to the plan accompanied with movement.
Owner:TOYOTA JIDOSHA KK

Fitness recommendation system and method based on exercise records

The invention relates to the technical field of exercise and fitness, in particular to a fitness recommendation system and method based on exercise records, and the method is applied to the system. The system comprises: an information collection module, which is used for obtaining information of a part that a user wants to exercise and is also used for obtaining an exercise history record or bodypreliminary evaluation information of the user; a plan generation module used for generating a plurality of sets of training plans with different attributes; a plan sending module used for recommending a plurality of training plans to the user and receiving the training plans selected by the user; a plan completion degree recording module used for recording exercise data of exercise performed by the user according to the training plan; and a plan optimization module used for analyzing, learning and optimizing the training plan recommended this time according to the exercise data and recommending the training plan to the user next time. The problems that the user lacks fitness experience or professional fitness knowledge training, unsafety is likely to occur during fitness, and the effect is poor can be solved.
Owner:重庆勤鸟圈科技有限公司

Non-transitory computer readable recording medium, screen generating method, and information processing apparatus

An information processing apparatus 100 acquires, when an actual performance by an athlete is started, an element that has already been performed and a score of the element that has already been performed in the actual performance, based on data acquired in real time. The information processing apparatus 100 estimates an element with a high probability of being performed hereafter in the actual performance, based on at least one of the planned performance information and the data. The information processing apparatus 100 estimates an estimated score of the actual performance being performed, based on the score of the element that has already been performed and an estimated score in the case in which estimated elements that have not been performed succeed, and generates screen information to display the estimated score of planned performance and the estimated score of the actual performance.
Owner:FUJITSU LTD

Load switching method based on unified urban planning function unit and load function block

The invention relates to a load switching method based on a unified urban planning function unit and a load function block. The method is applied to a grid information planning system for grid plan establishment, analysis and evaluation; and a unified urban function unit and a load functional block, specifically an urban planning function unit and a load analysis function block, are needed by the method. The method comprises: urban planning function unit division is carried out; according to the divided urban planning function unit, load analysis function block division is carried out, thereby realizing unification of the urban planning function unit and the load analysis function block; and then load switching is carried out according to the system after unification of the urban planning function unit and the load analysis function block. Compared with the prior art, the load switching method provided by the invention has the following advantages: repeated data processing and checking work within different function zone division ranges during grid planning can be avoided; and the work efficiency of grid planning work can be improved.
Owner:SHANGHAI MUNICIPAL ELECTRIC POWER CO

Robot motion information planning method and related device

According to the robot motion information planning method and the related device provided by the invention, a target kinetic model comprises kinetic parameters of all joints of a robot and friction coefficients of all the joints; a target optimization function used for describing time and energy consumption required when the tail end of the robot moves along a target track is constructed based on the target dynamic model; the target optimization function considers all the joints of the robot and the friction force of each joint, so that the optimization precision of the final time and energy consumption can be improved.
Owner:HANGZHOU INNOVATION RES INST OF BEIJING UNIV OF AERONAUTICS & ASTRONAUTICS

Horizontal transportation monitoring and early warning method in concrete construction

InactiveCN109978457AAvoid pour quality problemsTime-consuming real-time statisticsParticular environment based servicesFor mass transport vehiclesEngineeringWork status
The invention discloses a horizontal transportation monitoring and early warning method in concrete construction. The method comprises the following steps of step 1, carrying out scheduling information planning; step 2, identifying the state of the outlet of the mixing plant; and thirdly, enabling the concrete transport vehicle to enter the transport stage after leaving the outlet of the mixing plant, and finally enter the transfer platform. In the concrete production and transportation process, the working states of the mixing plant, the transport vehicle and the transfer equipment are effectively monitored by adopting refined and intelligent technical means and equipment, the early warning or the alarm information is sent out when monitoring indexes are about to reach or exceed an earlywarning value, meanwhile, the matching condition between planning information of the equipment is monitored in real time, and the quality accidents are avoided.
Owner:CHINA THREE GORGES PROJECTS DEV CO LTD +1

NFC sensing and NFV communication control-based low-voltage dynamic reactive power compensation device

The invention discloses an NFC sensing and NFV communication control-based low-voltage dynamic reactive power compensation device, which comprises a low-voltage dynamic reactive power compensation device body, an NFC near-field sensing module and an NFV management communication module; the NFC sensing and NFV communication control-based low-voltage dynamic reactive power compensation device is characterized in that the low-voltage dynamic reactive power compensation device body comprises a reactive power compensation controller, a radiator, a signal response module, a controllable switch, a single-phase capacitance compensation module, a three-phase capacitance compensation module and a switching switch. Mid-and-short-range fault information feedback with an intelligent terminal is achieved by employing an NFC near-field sensing technology, and two-way information communication of the low-voltage dynamic reactive power compensation device and the intelligent terminal is achieved on the basis of NFV communication control, so that the data transmission efficiency is improved and information planning of the intelligent terminal is facilitated. The NFC sensing and NFV communication control-based low-voltage dynamic reactive power compensation device has the beneficial effects that mid-and-short-range fault monitoring is achieved on the basis of the NFC near-field sensing technology, and the position of the low-voltage dynamic reactive power compensation device and more data information are obtained by employing two-way communication of NFV, so that short-and-long-range fault information feedback and protection control are achieved and the operating safety is ensured.
Owner:施一电气科技(上海)有限公司

Device for creating and managing itineraries

The present invention relates to a system for managing itineraries for a group of people, comprising a module for communicating data in real time, able to send and receive data from at least one other communication module, the data comprising for example information relating to planned or unplanned events, a database comprising vectorial and / or georeferenced geographical data, and non-georeferenced data, the data comprising, for example, information relating to events, the topography surrounding the terminal and / or the group, information relating to the group, a module for calculating an itinerary to be carried out, the calculation module calculating said itinerary based on information transmitted by the reception module, the module for calculating an itinerary configured to calculate the optimal itinerary, according to configurable decision criteria stored in memory, based on data stored in a database.
Owner:BULL SA

Project application information intelligent retrieval planning system and method

PendingCN114004576AAvoid wastingAvoid Duplicate Reporting SituationsCustomer relationshipOffice automationDatabaseInformation planning
The invention relates to the technical field of project application information retrieval planning, and discloses a project application information intelligent retrieval planning system and method. The project application information intelligent retrieval planning system comprises a project application information retrieval system and a project application information planning system, wherein the project application information retrieval system comprises an information input system and an information auditing system, the project application information planning system comprises a project information storage system, an intelligent recommendation system and a manual consulting and planning system, and the project application information intelligent retrieval planning method comprises the following steps: 1, information authentication and input; 2, project information auditing; 3, project planning; 4, performing manual online consultation; 5, storing information and sending the result. According to the system and the method, the client freely selects an online consultant through the client side, and the effect of comprehensively solving various problems encountered by the user is achieved.
Owner:丽水盈科科技有限公司

Information planning system based on multi-channel data integration and working method thereof

The invention discloses an information planning system based on multi-channel data integration and a working method thereof. The information planning system comprises a cloud server, a main terminal and an auxiliary terminal, the main terminal initiates an application to the cloud server; the cloud server randomly initiates connection to the auxiliary terminal according to the application of the main terminal; the initiating range of the cloud server is consistent with the application of the main terminal; the main terminal also outputs planning content to a connected cloud server; the cloud server comprises a planning distribution module, the planning distribution module receives the planning content and decomposes the planning content according to a preset rule, the cloud server randomlydistributes the decomposed planning content to the auxiliary terminal, and the auxiliary terminal fills the decomposed planning content; the auxiliary terminal outputs the filled planning content tothe cloud server, and the planning distribution module recombines and recovers the filled planning content according to a preset rule; and the main terminal acquires the recombined and recovered planning content.
Owner:TAICANG QINFENG ADVERTISEMENT & MEDIA CO LTD

Vehicle path planning method, vehicle path planning system and vehicle navigation apparatus

The present invention provides a vehicle path planning method, a vehicle path planning system and a vehicle navigation apparatus so as to solve the problem of no real time traffic condition consideration of the static path planning method. The method comprises: acquiring a starting point coordinate and an end point coordinate of a vehicle; periodically downloading real-time traffic information, wherein the real-time traffic information comprises traffic congestion information and specific event information; and according to the starting point coordinate, the end point coordinate and a real-time traffic information planning path, comparing the currently downloaded real-time traffic information to the last downloaded real-time traffic information to determine whether the real-time traffic condition on the planned path is changed, wherein the path is re-planned according to the current position coordinate, the end point coordinate and the currently-downloaded real-time traffic information if the real-time traffic condition on the planned path is changed. With the present invention, traffic congestion roads can be dynamically evaded so as to provide the fastest driving path for a vehicle driver.
Owner:BEIJING TRANWISEWAY INFORMATION TECH

An information transmission method and system based on a communication interface

The invention discloses an information transmission method based on a communication interface, and the method comprises the following steps: S1, information input: enabling a part of information to beassociated with the communication interface when the information is transmitted to the communication interface in the transmission process, and enabling redundant information to be automatically filtered; S2, information processing: the central processing unit performs first processing on the information transmitted in the communication interface, wherein the first processing is to classify the obtained associated information; The invention further discloses an information transmission system based on the communication interface, the information transmission system comprises an information input module, the information input module is connected with an information processing module, and the information processing module is connected with an information planning module. The system is highin practicability, the junk information can be exposed, the junk information can be thoroughly cleared away, people can be prevented from being disturbed by trivials of families when feeling work, trivials of work can be prevented from being disturbed during life, and the requirements of people are met.
Owner:SHENYANG INST OF ENG

Venue seat information planning method, device and system

The invention discloses a venue seat information planning method, device and system, and the method comprises the steps: receiving a seat planning request of a target venue, and determining the planning target parameter information of seat planning; determining planning input data of the target venue seat information and a planning method model used for seat planning; inputting the planning inputdata and the planning target parameter information into the planning method model; and determining a planning result that the planning method model plans the seat information of the target venue according to the planning target parameter information. Through the method, planning of venue seat information can be automatically and efficiently realized, the obtained planning result is more scientificand reasonable, the satisfaction degree of audiences is improved, and seat planning and activity expectation are better considered.
Owner:ALIBABA GRP HLDG LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products