The invention provides a construction method for efficiently treating a phyllite base rock surface, which comprises the following steps: S1, determining a construction position for excavation, and cleaning an excavated foundation surface; s2, geological sketching and excavation acceptance inspection are conducted on the cleaned foundation surface; s3,
cushion layer concrete construction is carried out on the foundation surface after excavation and cleaning; s4, anchor rod construction is conducted, specifically, drilling is conducted on the solidified
cushion layer concrete and phyllite through a drilling
machine, and anchor rods are installed and fixed; s5, steel bars are manufactured and installed, a formwork is assembled, a water pump, a
slag hopper and an air gun are used for cleaning rock debris generated during anchor rod construction, and then the formwork is assembled; s6, the bin surface is flushed, specifically, the bin surface is flushed through a water pump, and broken stones and the like generated in the construction process are flushed away; and S7, concrete is poured, and
bedrock surface treatment is completed. According to the method, the mechanical indexes of the phyllite are prevented from being reduced, so that the foundation surface meets the design requirements, the manual cleaning
workload is reduced, the working intensity is reduced, the construction efficiency is improved, the construction period is shortened, the labor cost is reduced, and the construction benefits are increased.