The utility model discloses a building
curtain wall, including the edge board, the edge board sets up T -shaped, and the edge board is set up
curtain wall board and inserts the gap, the inside of edge board sets up
curtain wall board, and the end of curtain wall board sets up the pressure joint device, and the pressure joint device includes two bracing bars, and one end of bracing bar sets up the connecting end, and two connecting ends are connected, and the other end of bracing bar is connected the
pressboard, and the
pressboard sets up in curtain wall board and inserts the gap, and one side of
pressboard sets up the card male, and the card slot is seted up on the edge board, and the card male is carded in the card slot. Through the unique pressure joint device design, the edge board of T -shaped
collocation has realized the double locking of curtain wall board, and the installation process of pressure joint device is extremely simple, only needs to make both sides card male preliminary alignment card slot, and then lifts up slightly to the bracing bar inner end, and then presses the bracing bar downwardly one time, can realize card male complete
carding in card slot and mortise
carding mortise slot simultaneously, does not need additional tools or complex steps, and the installation efficiency has been improved greatly, is especially suitable for high altitude operation.