Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

56results about How to "Improve room rate" patented technology

Dry-method construction method for high-performance autolaved aerated concrete block wall

InactiveCN106013509AHigh strengthAdhesive, special adhesive has strong bonding forceWallsBuilding material handlingSurface finishThermal bridge
The invention relates to the technical field of construction, and inparticular relates to a dry-method construction method for a high-performance autolaved aerated concrete block wall. The dry-method construction method comprises the following process procedures: performing construction preparation, positioning and paying off, leveling a wall foundation, erecting story poles, placing wall tie bars, constructing a block wall body, laying pipelines inside the wall body, mounting door/window hole cross beams, constructing outer wall concrete thermal bridge parts, constructing an outer wall waterproof interface agent, pasting special plaster putty on the inner wall in batch, constructing an inner wall finish coat layer, pasting wall surface heat-preservation blocks, and constructing a roof surface finish coat layer. The dry-method construction method is characterized in that a dry-method construction process is adopted for a blocking wall body, the part between the wall body and a beam top is filled with a polyurethane foamed adhesive, moreover a special construction method of an outer wall concrete thermal bridge part is adopted, the common quality problems of creep change of conventional masonry mortar and mortar joint cracks along wall surfaces are effectively solved, the overall property, the shock resistance and the heat-preservation property of the wall are improved, and the dry-method construction method can be widely applied to production construction of various buildings.
Owner:HUBEI SHENZHOU BUILDING MATERIAL

Composite thermal insulation concrete load-bearing wall

The present invention relates to a concrete load-bearing wall with compound heat-insulating layer. Said load-bearing wall includes wall body and connecting beam. In the wall body of external wall two layers of prefabricated heat-insulating concrete wall bodies are set, said prefabricated heat-insulating concrete wall body is a concrete plate whose external surface is covered with heat-insulating material, every layer of prefabricated heat-insulating concrete wall body is composed of several trough-type or L-shaped prefabricated heat-insulating concrete wall body units. Besides, said invention also provides the concrete assembly and construction method and steps of said compound heat-insulating concrete load-bearing wall.
Owner:陈信孚 +1

Space module building

The invention relates to a space module building which comprises a framework, space modules and contained objects of multi-storey buildings and the like.The framework comprises building roof structures, force-resisting components and optional protruding objects; the space modules are formed by dividing the framework through the horizontally arranged storey structures and the vertically distributed vertical force-resisting components, the height of each space module is the height of at least two natural storeys, the plane dimension is large, and the contained objects of the multi-storey buildings and the like can be built in the space modules; generally, concrete-filled steel tube columns are arranged on the outer edges of each space module, and the multiple space modules are connected and separated through barrels which are arranged in the center area of the building in the horizontal plane; due to the fact that completely assembled type lightweight storeys and wall boards which are low in price and high in heat-insulating property can be adopted as the contained objects of the multi-storey buildings and the like, compared with an existing high-rise building, the space module building is high in construction speed, reduces the construction cost and labor intensity, is greener and more environmentally friendly and improves the economic benefit of a construction project.
Owner:宋启宽 +1

Strong/weak electricity well of high-rise residence

The invention relates to a strong / weak electricity well of a high-rise residence. The strong / weak electricity well of the high-rise residence comprises strong electricity wells and weak electricity wells, wherein the strong electricity wells and the weak electricity wells are positioned in one tube well, and are separated by partition walls; strong electricity vertical channels and weak electricity vertical channels communicated vertically are respectively arranged in the strong electricity wells and the weak electricity wells; the partition walls in each floor are staggered transversely so as to form large strong electricity rooms and small weak electricity rooms on part floors and to form small strong electricity rooms and large weak electricity rooms on remainder floors; strong electricity metering boxes are arranged in the large strong electricity rooms; and weak electricity equipment boxes are arranged in the large weak electricity rooms. The strong electricity wells and the weak electricity wells are arranged in one tube well, and are separated by the staggered partition walls, so that the needed equipment mounting space is guaranteed, and the maintenance and management safety and operability are enhanced when the areas of the strong and weak electricity rooms on the floors are reduced and the house yield is improved.
Owner:SUZHOU INDAL PARK DESIGN & RES INST

Bee box and auxiliary equipment

The invention discloses bee box and auxiliary equipment. Ventilation ports are formed in a box body or a box cover and is used for ventilation instead of light transmission, a frame can clamp combs, damage to a sealed brood is reduced, the quantity of bees can be adjusted through a queen bee separation entrance, loss is reduced in cooperation with a queen bee collecting box capable of collecting queen bees and drones, a box is round, the entrance is arc-shaped on the back, a feeding device is arranged in the box, water can be added to the feeding device without opening the box, the width of awater feeding channel is set to be within 37 mm, the water feeding channel only occupies the width of one comb, a main body of the feeding device is arranged to be round or square and used in a grid box or a drum type bee box, a water adder can quantitatively add water to the feeding device, labor is reduced, a cage for introduction of the queen bee is 6-15 mm thick and can be put in a bee way without producing burr combs, the queen bee can eat honey on the combs during introduction of the queen bee, worker bees can go in and out during storage of the queen bee, a wasp collection device induces wasps into a collecting box, the wasps are trapped in the box, double covers are adopted for thermal insulation, arc forging parts are arranged on the box covers when the bee box is round, spring hoops are arranged in the middle of the bee box, a bottom plate and the box body are connected through hinges, and an additional observing port is not required during bee checking.
Owner:陈日宝

Lightweight steel structure building wall

InactiveCN102433947AReduce weightLight area occupationWallsFoam concreteRear quarter
The invention relates to a lightweight steel structure building wall which comprises two vertical trusses parallel to each other, one front side plate connected between front sides of the two trusses, and one back side plate connected between back sides of the two trusses, wherein the front side plate and the back side plate are made of foam concrete slabs or polyphenyl granule thermal insulation mortar slabs; the front side plate is arranged between two concave bows close to each other on the front sides of the two trusses; and the back side plate is arranged between two concave bows close to each other on the back sides of the two trusses. By adoption of the structure, the concave bows close to each other of the two trusses are used for mounting the side plates, and the space between the concave bows is sufficiently and effectively used, so that the thickness of the wall is small; and the number of the front side plate and the number of the back side plate are one, and the front side plate and the back side plate are made of the foam concrete slabs or the polyphenyl granule thermal insulation mortar slabs to ensure that the weight of the wall is light, therefore, the wall occupies a smaller area of a building, thus the percentage of usable dwelling area is increased, and lower requirements on the bearing capacity of a bearing beans are met.
Owner:ANHUI WATER RESOURCES DEV

Center joint fixed member for fabricated integrated wall tile system and assembly method thereof

The invention discloses a center joint fixed member for a fabricated integrated wall tile system and an assembly method thereof, and relates to the technical field of installation methods of fabricated wall tiles. The center joint fixed member for the fabricated integrated wall tile system and the assembly method thereof solve the problems that an existing wet pasting method of the wall tiles haspoor working environment, long construction period and high labor cost, and workers are susceptible to pneumoconiosis; and an existing dry hanging method of the wall tiles has cumbersome installation,high labor and material costs, large space occupied by keels on the back portions of the wall tiles and reduced utilization rate of indoor space. Vertical members are positioned at internal and external angles of a wall, an L-shaped clamping piece is mounted on each pair of longitudinal fish-scale-shaped punching holes of the vertical members in a clamped mode, and a plurality of transverse members I are arranged between every two adjacent vertical members. Clamping slots matched with first supporting ends and second supporting ends of the transverse members I are formed in the upper and lower end surfaces of the wall tiles correspondingly, and the wall tiles are mounted on every two adjacent transverse members I. The center joint fixed member of the fabricated integrated wall tile systemand the assembly method thereof are used for fabricating the fabricated integrated wall tile system.
Owner:王圣保

Strong and Weak Electric Wells in High-rise Residential Buildings

The invention relates to a strong / weak electricity well of a high-rise residence. The strong / weak electricity well of the high-rise residence comprises strong electricity wells and weak electricity wells, wherein the strong electricity wells and the weak electricity wells are positioned in one tube well, and are separated by partition walls; strong electricity vertical channels and weak electricity vertical channels communicated vertically are respectively arranged in the strong electricity wells and the weak electricity wells; the partition walls in each floor are staggered transversely so as to form large strong electricity rooms and small weak electricity rooms on part floors and to form small strong electricity rooms and large weak electricity rooms on remainder floors; strong electricity metering boxes are arranged in the large strong electricity rooms; and weak electricity equipment boxes are arranged in the large weak electricity rooms. The strong electricity wells and the weak electricity wells are arranged in one tube well, and are separated by the staggered partition walls, so that the needed equipment mounting space is guaranteed, and the maintenance and management safety and operability are enhanced when the areas of the strong and weak electricity rooms on the floors are reduced and the house yield is improved.
Owner:SUZHOU INDAL PARK DESIGN & RES INST

Transverse integral component for assembled integrated wall-tile system and assembling method thereof

The invention discloses a transverse integral component for an assembled integrated wall-tile system and an assembling method thereof, and relates to the field of wall-tile processing, assembled devices and assembling installing technologies. By means of the transverse integral component for the assembled integrated wall-tile system and the assembling method thereof, the problems that in an existing wall-tile wet combining method, the work environment is poor, the construction period is long, the labor cost is high, and workers are subject to pneumoconiosis are solved; the problems that in anexisting wall-tile dry hanging method, installing is tedious, the labor cost and the material cost are high, occupied space of wall-tile back fitting keels is large, and the using rate of indoor spaceis reduced are solved. According to the transverse integral component for the assembled integrated wall-tile system and the assembling method thereof, vertical components are fixedly connected with wall corners, a clamping piece I is clamped on every pair of longitudinal scale punched holes of a vertical component, multiple transverse components I are arranged between the two adjacent vertical components, elastic protection films are arranged on the backs of wall tiles, each wall tile is installed between the two adjacent transverse components I, and clamping grooves in the upper end face andthe lower end face of each wall tile are matched with a first hook and a second hook of the corresponding transverse component I respectively. The transverse integral component for the assembled integrated wall-tile system and the assembling method thereof are used for assembling of an assembled integrated wall-tile system.
Owner:王圣保

Double-sided sawtooth scraper for fabricated building and method for wall brick thin pasting

The invention provides a double-sided sawtooth scraper for a fabricated building. The double-sided sawtooth scraper is provided with a scraping edge with a sawtooth structure, and in the process of scraping, the regular sawtooth structure can be formed on the wall surface so as to effectively improve adherence force and the reliability of tiles. A method for wall brick thin pasting by using the double-sided sawtooth scraper for the fabricated building for scraping includes the following steps of (1) wall surface galling, (2) ceramic tile glue applying, (3) scraping, (4) tiling, (5) ceramic tile leveling, and (6) cleaning treatment. According to the method for wall brick thin pasting, the processes of ceramic tile water soaking and pre-laying implementation in traditional technologies are eliminated, the construction process is simplified, and the construction efficiency is improved; and meanwhile, through combination of three technologies of water torch galling, special double-sided sawtooth scraper scraping and ceramic tile vibrator leveling, under the condition of ensuring the high reliability, the thickness of laying can be effectively decreased and hollowing is avoided, and theeffects of improving the ceramic tile adherence force and the flatness and increasing the room getting rate are achieved.
Owner:广东华坤建设集团有限公司

Composite thermal insulation steel skeleton concrete integration construction structure and construction process thereof

InactiveCN1242137CRealize factory constructionBuild Quality Precisely ControlledWallsFloorsFloor slabReinforced concrete
One kind of compound heat preservation reinforced concrete integration construction structure and the construction craft, its foundation each one with buries in the concrete foundation from the laying aside steel, in the assembly wall and the floor section skeleton, with lays aside the section skeleton the steel buries in advance in the foundation a permanent connection; Its wall the steel bar coagulation dirt wall main body which first hands over by the polystyrene heat preservation wall template and the template interior bonds becomes, the polystyrene heat preservation wall template has two polystyrene heat preservations board parallel relative establishment, two between has two distinguishes to bury in advance pulls in its in steel skeleton combination ties becomes, under the polystyrene heat preservation board two side buddhist priest separately has the raised saw notch; Its floor because archery target heat preservation template and cast-in-place the steel bar layer of concrete duplicate synthesizes a body, keeps warm the template is passes long by the polystyrene thermal insulation material in sets at the section to become spongy the composition, keeps warm the template with cast-in-place the steel bar layer of concrete between has the concave-convex joint face. Compared to traditional construction working procedure few, time limit for a project short, construction cost low, the craft is simple, is suitable for much, the high-rise construction.
Owner:朱秦江
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products