The present invention relates to a power distribution control center equipment, design and installation method, in particular to a modularized box-type integral integrated electric control equipment for a gas-fired power plant and its installation method. The fixed electric control equipment installed with the electric control function column display cabinet is changed to a modular box-type integral integrated electric control equipment that can be transported, disassembled, assembled, and the wall can be disassembled; each box adopts a modular design, which can Hoisting, lifting and moving as a whole, it can be transported to the site as a whole (including the box and all internal systems) and installed on the outdoor civil engineering foundation. The walls around the box are designed to be detachable and can be installed at the factory or power plant Easy to remove or install. The invention has the advantages of convenient installation, strong applicability, time-saving and labor-saving, greatly reduced wiring error rate, reduced construction cost, and shortened construction period.