Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

246results about How to "Solve fatigue" patented technology

Series-parallel-connection force-feedback remote-control manipulator

The invention provides a series-parallel-connection force-feedback remote-control manipulator, and relates to an operation manipulator to resolve the problems that a master manipulator of a master-slave remote-control operation robot only adopts a series-connection or parallel-connection structure, a series-connection master manipulator structure has no clamping freedom degree, an operator can not adapt, and the hands of the operator are tired after long-time operation, and a parallel-connection master manipulator structure is not flexible to move, small in work space, difficult to meet the requirements of flexible motion and large rotation angle of an enterocoelia operation instrument. The series-parallel-connection force-feedback remote-control manipulator comprises a series-connection mechanism, a parallel-connection mechanism and a clamping mechanism, wherein the series-connection mechanism comprises a first rotation arm, a second rotation arm, a first balancing weight, a second balancing weight, a first encoder, a second encoder, a third encoder and a force sensor, and the clamping mechanism comprises a clamping seat, a fourth encoder, a first servo motor, a speed reducer, a third balancing weight and a clamping device. The series-parallel-connection force-feedback remote-control manipulator is applied to the mini-invasive enterocoelia surgery.
Owner:HARBIN INST OF TECH

Communication data link health state test device, system and method of electric vehicle charging facility

The invention discloses a communication data link health state test device, system and method of an electric vehicle charging facility. The electric vehicle charging facility comprises a charging control unit and a charging pile main control plate, wherein the charging control unit is connected with and communicates with charging pile main control plate through a CAN bus. The test device comprisesa communication simulation and fault detection unit, a CAN transceiver, a human-machine interaction unit and a power supply. The test device is accessed to the CAN bus through the CAN transceiver. Auser sends a test command signal to the communication simulation and fault detection unit through the human-machine interaction module. The communication simulation and fault detection unit selects acharging control unit detection module or a charging pile main control plate detection module to execute corresponding tests according to the test command signal, thereby obtaining test result data offault states, fault types and fault positions of a CAN communication link. The communication simulation and fault detection unit of the test device transmits the test result data to the human-machineinteraction module for outputting. According to the invention, human resource cost of the link test can be reduced and test quality and efficiency are improved.
Owner:NANJING NARI GROUP CORP +3

Composite bridge deck applied to long-span bridges and city bridges

The invention discloses a composite bridge deck applied to long-span bridges and city bridges. The composite bridge deck comprises a bridge deck body, wherein the bridge deck body is formed through combining a lower wave-shaped steel plate and an upper concrete slab; shear connectors which are symmetrically welded to wave crests of the wave-shaped steel plate upwards extend into the concrete slab; reinforcing steel bars and annular hoop reinforcements which are used for bundling up the reinforcing steel bars are arranged at the middle part of the concrete slab in a balanced manner. According to the composite bridge deck, the characteristics of the wave-shaped steel plate and the characteristics of the concrete slab are combined together, properties of materials are fully utilized, the flexural bearing capacity is enough under heavy loads, the deformation is small enough under the action of concentrated loads, and too-large secondary stress resulting from weld seams can be avoided; a top plate of a steel bridge deck is replaced with the concrete slab, so that the construction cost of a bridge floor system can be reduced; the quantity of welding is very small, so that the damage to the bridge deck caused by defects of a welding process can be reduced; due to the wrinkling effect of the wave-shaped steel plate, the problem that the deformation of the steel plate and the deformation of concrete are non-synchronous can be greatly solved, and the cracking of the transverse bridge direction of the bridge deck is avoided.
Owner:HENAN PROVINCIAL COMM PLANNING & DESIGN INST CO LTD

Self-service double-gate customs clearance security inspection device and customs clearance security inspection method therefor

The invention relates to the technical field of customs clearance security inspection, and is a self-service double-gate customs clearance security inspection device and a customs clearance security inspection method therefor. The former comprises a control unit, a first gate machine, and a second gate machine. The first gate comprises a first gate machine portion and a first gate located behind the first gate machine portion, wherein a first protective baffle is disposed between the first gate machine portion and the first gate, and a forward intrusion detection unit is mounted on the inner side wall of the first protective baffle. The second gate machine comprises a second gate machine portion and a second gate, wherein second protective baffles are disposed between the second gate machine portion and the first gate, and between the second gate machine portion and the second gate, and a second information collecting unit is mounted on the gate machine portion, and a trailing detecting unit is mounted on the inner side wall of the second protective baffles. According to the self-service double-gate customs clearance security inspection device and the customs clearance security inspection method therefor, the problems of low efficiency and easy to cause false detection in the existing manual security inspection mode can be solved, which can effectively identify passengers and baggage, effectively reduce the false detection rate of the trailing detection, improve the efficiency of passing, identify the control personnel at the same time , and help eliminate security risks.
Owner:新疆民航凯亚信息网络有限责任公司

Personal authentication credential management method and system based on mobile terminal

InactiveCN106161364ASolve fatigueEnjoy office convenience servicesUser identity/authority verificationData informationPassword
The invention discloses a personal authentication credential management method and system based on a mobile terminal. The personal authentication credential management method based on the mobile terminal comprises the steps that a user registers an authentication credential on the mobile terminal to carry out network application login; the login network application and the authentication credential of the user are recorded and stored, the user authentication credential is encrypted, the user authentication credential is periodically modified, and meanwhile, a verification identification token is allocated to the user; when the user logs in the network application, the user identity state is verified by the verification identification token; and when the existing user identity state of the user has no permission of logging in the network application, the verification identification token is taken back, and isolated locking or destroy processing is carried out on the data information of a user account. The invention further discloses a personal authentication credential management system based on the mobile terminal, which can realize a centralized management mode of personal passwords, solve the problem of user password fatigue and ensure the security of corporate confidential data in the mobile terminal.
Owner:上海比赞信息科技有限公司

Intelligent glasses based on augmented reality and screen adjustment device

The invention discloses intelligent glasses based on augmented reality and a screen adjustment device and relates to the technical field of intelligent wearing equipment. The intelligent glasses based on augmented reality comprise a host shell and an imaging shell. The screen adjustment device comprises a first connecting piece and a rotating shaft, a body of the first connecting piece is disposed in the host shell, a first end of the first connecting piece is a first convex lug which extends from the host shell into the rear end of the imaging shell, the first convex lug is provided with a round hole, a middle cylindrical portion of the rotating shaft is disposed in the round hole in the first convex lug and is in clearance fit with the cylindrical surface of the round hole, and the front end of the host shell is in arc clearance fit with the rear end of the imaging shell. The intelligent glasses based on the augmented reality and the screen adjustment device have the advantages that an imaging screen body can be adjusted both bilaterally and vertically, so that the problem of eye fatigue caused by the fact that a user is bound to move eyeballs to adapt to screen positions is solved; the imaging screen body can be moved conveniently when the user needs to view external real scenes.
Owner:CHENGDU GUORONG TECH

Whole-span prefabricated H-steel-concrete composite beam bridge and construction method

The invention discloses a whole-span prefabricated H-steel-concrete composite beam bridge and a construction method. The whole-span prefabricated H-steel-concrete composite beam bridge comprises an H-steel combination and a concrete bridge plate which is poured on the H-steel combination; the H-steel combination comprises H-steels placed in parallel in the bridge width direction; and the whole-span length is the length direction of the H-steels. The whole-span prefabricated H-steel-concrete composite beam bridge has the advantages that the construction of a bridge deck slab is simple and the hoisting weight of the bridge deck slab is light; during making, factory machining and manufacturing procedure does not exist and the later mounting and erecting difficulty is reduced; and meanwhile, as the H-steels can avoid adverse effects such as welding residual stress, more stable mechanical property, better bearing capacity and better durability are obtained; and the making cost can be greatly reduced. Compared with the steel plate girder in the prior art, the whole-span prefabricated H-steel-concrete composite beam bridge has the advantages that the welding or bolting process can be eliminated; construction processes uneasy to control, such as prestressed structure steel strand tensioning and grouting, hollow slab girder hinge joint connection and so on do not exist; the quality of aprofiled-steel composite beam can be effectively guaranteed; and requirements on equipment and technical skills of workers can be reduced.
Owner:CHONGQING JIAOTONG UNIVERSITY

Traditional Chinese medicine composition for strengthening yang and tonifying kidney and preparation method thereof

The invention relates to the field of traditional Chinese medicine, in particular to a traditional Chinese medicine composition mainly used for strengthening yang and tonifying kidney and a preparation method thereof. The traditional Chinese medicine composition is mainly prepared from an oyster extracting solution, a sea cucumber extracting solution, a dendrobium officinale extracting solution, xylitol and microcrystalline cellulose. The traditional Chinese medicine composition can be used for being made into various dosage forms, such as oral liquid, tablets, capsules, pills, granules, powder, medicinal liquor and paste. The traditional Chinese medicine composition and the preparation method thereof have the advantages that a remarkable effect is achieved on the aspect of improvement of the sexual function, experimental results show that sexual vitality of mice taking the composition is improved remarkably, the content of serum testosterone of normal mice and emasculated mice taking the composition is increased obviously, and it is thus clear that the traditional Chinese medicine composition can remarkably improve sexuality. The traditional Chinese medicine composition is a pure natural traditional Chinese medicine preparation, the untoward effect and side effect caused by irritation of the stomach and intestines can be reduced, the effectiveness is achieved fast, and the composition can be made into various dosage forms for a user to take.
Owner:GUANGXI KANGSHOU BIOTECH CO LTD

Full-prefabricated assembly type concrete freight transport suspension type monorail structure

The invention discloses a full-prefabricated assembly type concrete freight transport suspension type monorail structure. The structure comprises multiple prefabricated concrete track beams, the two ends of each prefabricated concrete track beam are connected with prefabricated concrete crossbeams, prefabricated hollow concrete piers are arranged at the two ends of each prefabricated concrete crossbeam, the bottoms of the two prefabricated hollow concrete piers corresponding to each prefabricated concrete crossbeam are installed on a prefabricated raft foundation, and each prefabricated raft foundation is fixed to the ground, wherein the length of each prefabricated concrete track beam is smaller than or equal to 10 m. Each component is a prefabricated member, quick assembly type construction is facilitated, the construction schedule is quickened, and construction cost is greatly saved; each component is prefabricated through reinforced concrete, the quality is reliable, the construction speed is high, maintenance cost in the later stage is low, construction cost is low, the structure is more environment-friendly, and traveling safety is facilitated; and the prefabricated raft foundations are adopted, the construction speed can be increased, soil texture exploration conducted in the earlier stage is not needed, and the earlier stage engineering cost is reduced.
Owner:CHINA RAILWAY ERYUAN ENG GRP CO LTD

Friction-type stud shearing-force connection part and construction method thereof

The invention discloses a friction-type stud shearing-force connection part and a construction method thereof. The friction-type stud shearing-force connection part includes a stud shearing-force connection part main body, a mounting nut, a sleeve, a fixing nut and a semiconductor spring; the stud shearing-force connection part main body comprises a thread section, a thread-free extrusion sectionand a pulling-resistant pier in sequence from bottom to top; during factory prefabrication, the stud shearing-force connection part main body is sleeved with the fixing nut, the sleeve and the semiconductor spring from the thread section in sequence, the upper end face of the fixing nut is located at the top of the thread section and is fixed, the upper end of the sleeve is fixed to the lower endface of the fixing nut, the upper end of the semiconductor spring and the lower end of the sleeve are connected into one, and the shearing-force connection parts are mounted on a maim beam at intervals according to needed shearing resistant requirements. By the adoption of the friction-type stud shearing-force connection part and the construction method thereof, force transferring modes of traditional shearing force connection parts are improved, interface friction is reasonably utilized, the pretension force of the friction-type stud shearing-force connection part can be monitored and controlled, and the design philosophy of combining resistance and releasement can be achieved. The factory prefabrication degree is high, bolt splicing is conducted on the spot, and the labor cost is saved.
Owner:HOHAI UNIV

Electric three-wheeled luggage barrow suitable for airport

The invention discloses an electric three-wheeled luggage barrow suitable for an airport. The electric three-wheeled luggage barrow is mainly characterized in that the lower ends of a front suspension and a rear suspension of the tail end of the left portion of a frame are provided with a front second bearing pedestal and a rear second bearing pedestal respectively, the outer portion of the front end face of the front second bearing pedestal and the outer portion of the rear end face of the rear second bearing pedestal are provided with a front rubber rear wheel and a rear rubber rear wheel respectively, the rubber rear wheels are driven by a DC motor through chain transmission, a front wheel component is arranged on the lower end face of a front wheel stand of the tail end of the right portion of the frame, a front wheel is arranged at the lower end of the front wheel component, a small journal of a front half shaft provided with the front rubber rear wheel and a small journal of a rear half shaft provided with the rear rubber rear wheel are connected with an active rotor of a front magnetic power brake and an active rotor of a rear magnetic powder brake through couplings and flat keys respectively, an advancing/retreating switch and a start switch are arranged on the upper end face of a front armrest arm, and a brake switch is arranged on the upper end face of a rear armrest arm. The problem that a passenger feels tired when pushing the luggage barrow to find an unoccupied seat in a waiting hall of the airport to wait for an airplane or pushing the luggage barrow to walk from a gate of the waiting hall of the airport to a security check is solved, and the passenger can conveniently and easily wait for the airplane or board the airplane.
Owner:罗建华

Floating offshore platform

A semisubmersible floating platform (1) for supporting at least one wind turbine, comprising four buoyant columns (3), each of them being attached to a ring pontoon (2); a transition piece (4) configured to support one wind turbine, disposed on the buoyant columns (3); and a heave plate (5) assembled to the internal perimeter of the ring pontoon (2). The ring pontoon (2) comprises four pontoon portions forming a quadrilateral-shaped ring pontoon (2) wherein the first end of each column (3) is attached to a respective corner of said quadrilateral-shaped ring pontoon (2). The heave plate (5) islocated in the internal perimeter of the ring pontoon (2), both defining a hollow. The pontoon (2) is preferably divided into a plurality of compartments or construction blocks that may be filled withfixed ballast, such as concrete. The transition piece (4) has four arms arranged in star configuration and protruding from a central point at which the wind turbine is located, the connection betweenthe transition piece (4) and the columns (3) being designed to be located above the sea splash zone. Each of the buoyant columns (3) comprises at least one ballast tank configured for allocating seawater in order to adjust the draft and to compensate for the inclination of the platform (1), said at least one ballast tank comprised in each column (3) being independent of the at least one ballasttank of the other columns (3).
Owner:NAUTILUS FLOATING SOLUTIONS SL
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products