Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

31results about How to "Guaranteed greening effect" patented technology

High and steep side slope ecological retrieved green spray-seeding base material and preparation method and application of base material

The invention relates to the technical field of side slope treatment, and discloses a high and steep side slope ecological retrieved green spray-seeding base material and a preparation method and application of the base material. The spray-seeding base material comprises the following raw materials in parts by weight: 330-420 parts of planting soil, 20-30 parts of peat soil, 1.5-5 parts of organic fertilizer, 1-3 parts of grass fibers, 1-3 parts of sawdust, 0.03-0.05 part of a water-retaining agent, 0.02-0.04 part of an adhesive, 0.1-0.5 part of inorganic fertilizer, 0.5-2 parts of a pH adjustment agent, 30-44 parts of hybrid seeds and 150-200 parts of water, wherein the hybrid seeds consists of the following plant seeds in parts by weight: 10-12 parts of rhizomes tall fescue, 2-4 parts of trifolium repens, 3-5 parts of alfalfa, 2-3 parts of bermuda grass, 2.5-4 parts of indigofera pseudotinctoria, 4-6 parts of magnolia multiflora, 3-5 parts of cassia corymbosa, 2-3 parts of amorpha fruticosa and 1-2 parts of coreopsis. The base material disclosed by the invention for spray-seeding can make a soil replacement base layer with the intensity higher than 0.25MPa; after 45 days when a turf is formed, the rainwash strength is higher than or equal to 120mm / h; within half a year to a year, an ecological plant colony with shrubs which grow with the rainwash strength higher than or equal to 200mm / h and serve as main plants is formed.
Owner:HUANGSHI GARDEN FLOWER & WOOD CO LTD

Hydro-fluctuation belt side slope ecological management method based on ecological bag

The invention relates to a hydro-fluctuation belt side slope ecological management method based on an ecological bag. The hydro-fluctuation belt side slope ecological management method comprises the following steps of: dividing a hydro-fluctuation belt, namely taking an upper limit of a water level of a drought period as a lower boundary of the hydro-fluctuation belt; taking the highest water level line of a flood period as an upper boundary of the hydro-fluctuation belt as the hydro-fluctuation belt; and carrying out ecological repairing: treating a foundation slope surface; paving the ecological bag from the lower boundary of the hydro-fluctuation belt in a ladder-shaped layer staggered manner; and planting amphibious plants or / and hygrophytes on the ecological bag. The technical effects of the hydro-fluctuation belt side slope ecological management method are obvious, namely plant roots penetrate through the ecological bag to form an organic whole body with a slope body, so that the slope body is relatively firm and water and soil loss can be effectively prevented; and no matter whether the amphibious plants are drowned or naked, the afforesting effect and the ecological effect can be guaranteed.
Owner:CHONGQING DANHAI IND

Slope greening protection method

InactiveCN108093729AReduce the impact of washoutAvoid hanging netsClimate change adaptationAfforestationSurface layerGreening
The invention belongs to the technical field of slope protection and particularly relates to a slope greening protection method. The slope greening protection method comprises the following steps that(1) a spraying and sowing substrate is prepared; (b) the spraying and sowing substrate is injected into a slope surface layer through implanting equipment, the injection depth is 5-20 cm, and a soillayer and / or sand layer replacement body is formed; (c) then maintenance is performed until seedling forming. According to the slope greening protection method, the construction technology can be simplified under the premise that the greening effect is ensured, the washing influences of rainfall to the spraying and sowing substrate and the slope are reduced, and the purpose of reducing greening cost is realized.
Owner:SHEN KAN QINHUANGDAO GENERAL ENG DESIGN & RES INST CORP MCC

Wind prevention, sand fixation and water retention afforestation method

The invention discloses a wind prevention, sand fixation and water retention afforestation method and belongs to the technical field of environmental protection engineering. The method comprises steps as follows: a curing agent is prepared from sodium carboxymethylcellulose, anionic polyacrylamide, ferrous chloride and water; the curing agent and sand are blended to form cured sand; deep holes for tree planting and shallow trenches for grass planting are dug in the sand land, water collecting hoppers are drilled in the deep holes, the deep holes and the shallow trenches are filled with the cured sand, and the cured sand form deep hole sand fixation and water absorption layers in the deep holes and form shallow trench sand fixation and water absorption layers in the shallow trenches; saplings are planted in the deep holes, the roots of the saplings extend into the mouth parts of the water collecting hoppers, and grass seeds are scattered in the deep holes and the shallow trenches; the grass seeds are covered with a mulching film for maintenance, and small ventilation holes are formed in the mulching film. The curing agent and the sand soil are blended, inside gaps of soil particles can be filled with the blended curing agent and sand soil, the cured sand particles don't easily disperse and jump, sufficient water can be continuously provided for plants, and the long-time wind prevention, sand fixation and water retention effects are achieved.
Owner:裴向军 +1

Spray-seeding substrate for ecological reafforestation of high and steep side slopes, preparation method for spray-seeding substrate and application of spray-seeding substrate

The invention relates to the technical field of side slope treatment and discloses a spray-seeding substrate for ecological reafforestation of high and steep side slopes, a preparation method for the spray-seeding substrate and an application of the spray-seeding substrate. The spray-seeding substrate contains the following raw materials in parts by weight: 330-420 parts of planting soil, 20-30 parts of peat soil, 1.5-5 parts of organic fertilizer, 1-3 parts of grass fibers, 1-3 parts of wood sawdust, 0.03-0.05 part of water retention agent, 0.02-0.04 part of binder, 0.1-0.5 part of inorganic fertilizer, 0.5-2 parts of pH regulator, 30-44 parts of seed mixture and 150-200 parts of water, wherein the seed mixture is prepared from the following plant seeds in parts by weight: 10-12 parts of rhizome-type festuca arundinacea, 2-4 parts of Trifolium repens, 3-5 parts of Medicago sativa, 2-3 parts of bermuda grass, 2.5-4 parts of Indigofera pseudotinctoria, 4-6 parts of magnolia multiflora, 3-5 parts of cassia corymbosa, 2-3 parts of amorpha fruticosa and 1-2 parts of cosmos bipinnatus. Through carrying out spray-seeding by using the substrate disclosed by the invention, an imported-soil base course with the strength of 0.25MPa or more can be formed, the rainfall erosion resistance after 45-day plain forming is not lower than 120mm / h, and a shrub-dominated and grass-shrub-combined ecological plant community with the rainfall erosion resistance not lower than 200mm / h is formed in half a year to a year.
Owner:扬州大学(如皋)花木产业研究院

Sludge ceramsite concrete ecological revetment construction method

The invention provides a sludge ceramsite concrete ecological revetment construction method, comprising the following steps that 1, an original soil slope is trimmed and cut; 2, sludge ceramsite concrete is poured on a slope surface to be treated; 3, nutrient soil and planting soil are sequentially laid on the sludge ceramsite concrete; 4, aquatic plants and turf are planted on the revetment; and5, the planted plants are maintained. According to the invention, the sludge ceramsite concrete revetment technology is matched with landscape greening, the ecological greening revetment avoids the problem that a traditional revetment is insufficient in greening, guarantees that plants can root in the revetment soil more easily while meeting the safety and stability of the revetment, is suitable for projects such as river, lake and sea water system and black and odorous riverway governance and road traffic, and achieves the effects of fixing soil, protecting the revetment, governing pollution,improving ecology and beautifying the environment.
Owner:NANJING HYDRAULIC RES INST

Construction method of ecological concrete protected slope based on vertical drainage channel

The invention provides a construction method of an ecological concrete protected slope based on a vertical drainage channel. The construction method comprises the following steps: first, an original state soil side slope is trimmed and cut; 2, a set of vertically-arranged drainage boards is driven in the trimmed soil side slope; 3, ecological greening concrete is poured on a to-be-treated slope surface; 4, nutrient soil and planting soil are laid on the ecological greening concrete in sequence; 5, appropriate grass seeds are selected to be sown on the protected slope, or turf is laid on the protected slope; and 6, the planted turf is maintained. An ecological concrete slope protection technology cooperates with landscape greening, the problem of insufficient greening of a traditional protected slope is avoided, it is guaranteed that plants are easier to root in a soil body of the protected slope while the safe stability of the protected slope is met, and thus the ecological greening protected slope is constructed.
Owner:NANJING HYDRAULIC RES INST

Greening grid device for rock slope and construction method of device

A greening grid device for a rock slope comprises a ventilation layer, a fine net fixing layer, a spraying base layer, a grass seed box fixing net layer and a spraying surface layer which are sequentially and fixedly connected with the upper surface of the rock slope through anchor nails; cushion blocks are fixedly arranged in the ventilation layer, the bottom surfaces of the cushion blocks are fixedly connected with the slope surface of the rock slope, and the top surfaces of the cushion blocks are fixedly supported on the bottom surface of the fine net fixing layer; the fine net fixing layercomprises a fixed fine net, and the fixed fine net and the grass seed box fixing net layer are used for clamping and fixing the spraying base layer; the grass seed box fixing net layer comprises a grass seed box fixing net, and grass seed boxes are fixedly arranged at the intersections of steel wires in the grass seed box fixing net; the spraying surface layer is sprayed on the upper surface of the grass seed box fixing net layer. According to the greening grid device and a construction method thereof, the grass seed box fixing net with the grass seed boxes is manufactured, and the characteristics of the grass seed boxes are utilized into vegetation concrete construction, so that the problem that the germination rate and survival rate of plant seeds are low after spray-seeding construction is finished is solved.
Owner:MCC TIANGONG GROUP

Method for preventing pipeline from being blocked by too-wet dressing soil in slope dressing soil dry-spraying operation

The invention discloses a method for preventing a pipeline from being blocked by too-wet dressing soil in slope dressing soil dry-spraying operation. The method includes the following steps that firstly, improved dressing soil is prepared, wherein a sand material and vegetable matter are added to the water-contained dressing soil to be stirred and evenly mixed; and secondly, the improved dressing soil is sprayed to a mountain slope beside a road through a dressing soil dry-spraying process. By the adoption of the method, a dressing soil ratio improving method is adopted, bonded particles are effectively scattered, the matrix wall bonding phenomenon is effectively avoided, viscosity is reduced, and the aggregation phenomenon is reduced; the wall bonding phenomenon is reduced; and the pipeline blocking phenomenon generated in dry-spraying operation can be effectively prevented, smooth construction is guaranteed, waste is used, cost is reduced, the soil is evenly sprayed to the slope face of the slope, the construction progress is guaranteed, and the afforesting effect of the slope can be guaranteed.
Owner:TIANJIN RES INST OF BUILDING SCI

Greening treatment method for instable mountains

The invention discloses a greening treatment method for instable mountains. The greening treatment method includes mountain top greening, mountainside greening, mountain bottom greening, grooving greening and soil preparation greening. Vine plants are planted at the edges of mountain tops according to the distances of 50-60 cm, ecological bags are piled to form squares or circles, connecting buckles are mounted between every two layers of ecological bags, barbs on the connecting buckles are inserted into the ecological bags, trees are planted between the ecological bags which are piled to form the squares or the circles, movable small greenhouse water accumulation devices are mounted on the outer sides of the bottoms of the trees, cement is laid on the surfaces of mountain bottoms to form trapezoidal protective slopes which are of netted structures, a downward water flow groove is formed in a shady humid side of each mountain by means of digging, another downward water flow groove is formed in a sunny side of each mountain by means of digging, phosphorus and potassium fertilizers are spread in soil around the planted trees, and phosphorus fertilizers are spread on the surface of soil at the mountain bottoms. The greening treatment method has the advantages that normal growth of the plants can be guaranteed, and the problem of influence of debris flow and water and soil loss on mountain greening effects can be solved.
Owner:青海富腾生态科技有限公司

Garden planting device and method

The invention relates to the technical field of garden equipment, and discloses a garden planting device. The garden planting device comprises a shell, wherein the bottom of the inner wall of the shell is fixedly connected with a connecting plate; a fixed base is arranged on the top of the connecting plate; the top of the fixed base is fixedly connected with an industrial mechanical arm; an empty groove is formed in the bottom of the fixed base; the inner wall of the empty groove is fixedly connected with a rotating rod; a pulley is connected to the surface of the rotating rod in a sleeving manner; a chute is formed in the top of the connecting plate and corresponds to the pulley; the inner wall of the chute is slidably connected with the surface of the pulley; an electric push rod is fixedly mounted on the top of the connecting plate and is positioned on the right side of the fixed base; and an output end of the electric push rod is fixedly connected with the right side surface of the fixed base. The garden planting method comprises the two steps of drip washing and spraying; the survival rate of plants is guaranteed; growth and absorption of a root system are facilitated; the level is easy to maintain, and the period of metabolic balance is also easy to maintain; and the greening effect of a garden is guaranteed.
Owner:WENZHOU HUAHONG MUNICIPAL GARDEN ENG CONSTR CO LTD

Plant net greening method

InactiveCN101773037BNot easy to penetrateSmall water retention propertiesHorticultureEcological environmentGreening
The invention provides a plant net greening method, which comprises the following operation steps: 1) smoothening abandoned land; 2) paving a clay layer; 3) preparing and spreading a green substrate; 4) spraying water until saturation and carrying out sedimentation; 5) paving and fixing a plant net; 6) covering a protection layer; and 7) carrying out moisture management. The method of the invention has the advantages of rich material resources, reasonable cost and simple construction process, in addition, the early stage sprouting and the late stage growth of plants can be fully ensured, the effective greening effect can be reached, the soil structure can be gradually improved, the ecological environment is recovered, and the goal of recovering the natural environment is reached. The invention is mainly used for the greening governing engineering of the abandoned land.
Owner:SICHUAN SANHE SLOPE TECH CO LTD

Sandy soil greening construction method

The invention discloses a sandy soil greening construction method, and belongs to the environment protection engineering technical field; the method comprises the following steps: preparing a curing agent; mixing the curing agent with sandy soil so as to form curing sand; digging deep pits and shallow trenches in the sandy soil, drilling water funnels into the deep pits, filling the curing sand into the deep pits and shallow trenches, planting saplings into the deep pits, allowing sapling roots to extend to the water funnel mouths, and spreading grass seeds in the deep pits and shallow trenches; laying fine sands on the grass seeds, using a mulch film to cover the grass seeds, opening vents on the mulch film, inserting wooden slots around the mulch film, and pouring slurry into the slots so as to form a water fence; watering the grass seeds for maintenance, and irrigating in every 1-2 days until the grass seeds germinate. The method mixes the curing agent with the sandy soil so as to fill inner gaps of the soil particles; the curing sand particles cannot easily disperse and jump, thus contentiously providing sufficient water for plants, and realizing long term windproof, sand solidification, water retention and greening effects.
Owner:裴向军 +1

Plant net greening method

InactiveCN101773037ANot easy to penetrateSmall water retention propertiesHorticultureEcological environmentGreening
The invention provides a plant net greening method, which comprises the following operation steps: 1) smoothening abandoned land; 2) paving a clay layer; 3) preparing and spreading a green substrate; 4) spraying water until saturation and carrying out sedimentation; 5) paving and fixing a plant net; 6) covering a protection layer; and 7) carrying out moisture management. The method of the invention has the advantages of rich material resources, reasonable cost and simple construction process, in addition, the early stage sprouting and the late stage growth of plants can be fully ensured, the effective greening effect can be reached, the soil structure can be gradually improved, the ecological environment is recovered, and the goal of recovering the natural environment is reached. The invention is mainly used for the greening governing engineering of the abandoned land.
Owner:SICHUAN SANHE SLOPE TECH CO LTD

A kind of high, steep slope ecological regreening spraying base material and its preparation method and application

The invention relates to the technical field of side slope treatment, and discloses a high and steep side slope ecological retrieved green spray-seeding base material and a preparation method and application of the base material. The spray-seeding base material comprises the following raw materials in parts by weight: 330-420 parts of planting soil, 20-30 parts of peat soil, 1.5-5 parts of organic fertilizer, 1-3 parts of grass fibers, 1-3 parts of sawdust, 0.03-0.05 part of a water-retaining agent, 0.02-0.04 part of an adhesive, 0.1-0.5 part of inorganic fertilizer, 0.5-2 parts of a pH adjustment agent, 30-44 parts of hybrid seeds and 150-200 parts of water, wherein the hybrid seeds consists of the following plant seeds in parts by weight: 10-12 parts of rhizomes tall fescue, 2-4 parts of trifolium repens, 3-5 parts of alfalfa, 2-3 parts of bermuda grass, 2.5-4 parts of indigofera pseudotinctoria, 4-6 parts of magnolia multiflora, 3-5 parts of cassia corymbosa, 2-3 parts of amorpha fruticosa and 1-2 parts of coreopsis. The base material disclosed by the invention for spray-seeding can make a soil replacement base layer with the intensity higher than 0.25MPa; after 45 days when a turf is formed, the rainwash strength is higher than or equal to 120mm / h; within half a year to a year, an ecological plant colony with shrubs which grow with the rainwash strength higher than or equal to 200mm / h and serve as main plants is formed.
Owner:HUANGSHI GARDEN FLOWER & WOOD CO LTD

A sandy soil greening construction method

The invention discloses a sandy soil greening construction method, and belongs to the environment protection engineering technical field; the method comprises the following steps: preparing a curing agent; mixing the curing agent with sandy soil so as to form curing sand; digging deep pits and shallow trenches in the sandy soil, drilling water funnels into the deep pits, filling the curing sand into the deep pits and shallow trenches, planting saplings into the deep pits, allowing sapling roots to extend to the water funnel mouths, and spreading grass seeds in the deep pits and shallow trenches; laying fine sands on the grass seeds, using a mulch film to cover the grass seeds, opening vents on the mulch film, inserting wooden slots around the mulch film, and pouring slurry into the slots so as to form a water fence; watering the grass seeds for maintenance, and irrigating in every 1-2 days until the grass seeds germinate. The method mixes the curing agent with the sandy soil so as to fill inner gaps of the soil particles; the curing sand particles cannot easily disperse and jump, thus contentiously providing sufficient water for plants, and realizing long term windproof, sand solidification, water retention and greening effects.
Owner:裴向军 +1

Underground building structure

InactiveCN111926855AGuaranteed greening effectSolve the problem of poor waterproof qualityArtificial islandsProtective foundationGreeningStructural engineering
The invention provides an underground building structure. The underground building structure comprises a main body, a door, a first waterproof structure, second waterproof structures and a planting soil layer, wherein the main body is of a box body structure, one side of the main body is open, the door is connected with the open side of the main body in a covering manner, the first waterproof structure is arranged at the top of the main body, the second waterproof structures are arranged on three side walls of the main body correspondingly, and the planting soil layer is arranged on the top ofthe first waterproof structure for vegetation planting. According to the underground building structure, the first waterproof structure is used for waterproofing the top of the main body, and the second waterproof structures are used for waterproofing the three side walls of the main body, so that the overall waterproof quality of the main body can be effectively improved, the main body is prevented from being eroded by accumulated water, the overall stability and safety of the main body are ensured, moreover, the planting soil layer is arranged at the top of the first waterproof structure for facilitating vegetation planting, and the overground greening effect of the underground building structure is guaranteed.
Owner:CHINA FIRST METALLURGICAL GROUP

A kind of anti-sand greening pile in saline-alkali land

The invention discloses a saline land sand prevention greening pile comprising a pile body; the pile body is provided with a plurality of greening units; each green unit comprises a support plate used for supporting a greening pot, so the greening pile can green the saline land; the greening pile also comprises a sand prevention device and a controller; the sand prevention device comprises sand prevention shields matched with the greening units one by one; the sand prevention shield is arranged outside the greening pot; the sand prevention device also comprises a drive part used for driving the sand prevention shields to curve and unfold; when a dust sensor on the pile body senses the air sediment concentration is higher than a preset value, an electric signal is converted and sent to a signal processing circuit; the signal processing circuit receives the electric signal, and sends the electric signal to a central processing circuit; the central processing circuit controls the drive part, thus enabling the sand prevention shields to cover the greening units; the saline land sand prevention greening pile can cover the greening plants on the pile body, so the greening plants cannot be damaged by sands, thus ensuring plants greening effect.
Owner:WEIFANG YOURONG IND

Comprehensive ecological prevention and control structure and prevention and control methods of high and steep slopes in easily weathered soft rock

The invention discloses a comprehensive ecological prevention and control structure for high and steep slopes of easily weathered soft rocks, which includes at least one hierarchical ecological prevention and control structure. and a two-way drainage board, the internal drainage pipe is inserted inside the soft rock slope through the soft rock solidification layer, the two-way drainage board is laid on the surface of the soft rock solidification layer, and the two-way drainage board communicates with the internal drainage pipe; On the surface of the drainage board, an ecological concrete layer and a planting concrete layer are sequentially laid outward. The two-way drainage board is formed by splicing a plurality of shallow two-way drainage blocks, and the shallow two-way drainage block includes a drainage board wall, a drainage channel, a water guide hole and a drainage pipe hole. And on the high and steep slope of easy weathering soft rock, the soft rock slope is excavated step by step from top to bottom, and the easy weathering soft rock high and steep slope comprehensive ecological prevention and control structure is adopted on the excavated soft rock slope Weathered soft rock high and steep slopes are treated. Excellent drainage effect and good protection effect.
Owner:CHANGSHA UNIVERSITY OF SCIENCE AND TECHNOLOGY

Transplanting method of large-volume camphor tree

ActiveCN102499015BShorten regen growth timeGuaranteed greening effectForestryCinnamomum camphoraLarge size
The invention provides a transplanting method of a large-volume camphor tree. The transplanting method comprises the steps of: an operation at the position before camphor tree transplanting and an operation at the position after camphor tree transplanting, wherein the two positions are spliced by a camphor tree transportation step; the operation at the before camphor tree transplanting comprises the following sequential steps of preparing before construction, excavating mud balls and binding mud balls; and the operation at the position after camphor tree transplanting comprises the following sequential steps of digging planting holes, arranging an irrigation system and a dewatering system, planting and maintaining. By adopting the transplanting method of the large-volume camphor tree provided by the invention, the off-season transplanting survival rate of large-size camphor tree is improved, the reversion growth time of the transplanted camphor tree is shortened, the greening effect of the camphor tree after transplanting is ensured, the cost is saved and the transplanting construction benefit of the camphor tree is improved.
Owner:广州建筑园林股份有限公司

A greening method for windbreak, sand fixation, water retention and greening

The invention discloses a wind prevention, sand fixation and water retention afforestation method and belongs to the technical field of environmental protection engineering. The method comprises steps as follows: a curing agent is prepared from sodium carboxymethylcellulose, anionic polyacrylamide, ferrous chloride and water; the curing agent and sand are blended to form cured sand; deep holes for tree planting and shallow trenches for grass planting are dug in the sand land, water collecting hoppers are drilled in the deep holes, the deep holes and the shallow trenches are filled with the cured sand, and the cured sand form deep hole sand fixation and water absorption layers in the deep holes and form shallow trench sand fixation and water absorption layers in the shallow trenches; saplings are planted in the deep holes, the roots of the saplings extend into the mouth parts of the water collecting hoppers, and grass seeds are scattered in the deep holes and the shallow trenches; the grass seeds are covered with a mulching film for maintenance, and small ventilation holes are formed in the mulching film. The curing agent and the sand soil are blended, inside gaps of soil particles can be filled with the blended curing agent and sand soil, the cured sand particles don't easily disperse and jump, sufficient water can be continuously provided for plants, and the long-time wind prevention, sand fixation and water retention effects are achieved.
Owner:裴向军 +1

Upper-ditch and lower-base soil retaining block type ecological retaining wall suitable for mountain slopes

The invention belongs to the technical field of agricultural engineering, particularly relates to an upper-ditch and lower-base soil retaining block type ecological retaining wall suitable for mountain slopes, and aims to solve the problem that in the prior art, when a retaining wall structure is applied to the mountain slopes, water easily permeates into a wall body, so that the stability of theretaining wall structure becomes poor as time goes on. The upper-ditch and lower-base soil retaining block type ecological retaining wall suitable for the mountain slopes comprises a base and the wallbody, wherein the base is connected to the lower end of the wall body; one side of the wall body is provided with an ecological sandbag; the upper end of the wall body is also provided with an intercepting ditch which is concave towards the interior of the wall body; the intercepting ditch is internally provided with a water guide assembly for preventing the water from permeating into the wall body; and the water guide assembly is attached to the inner surface of the intercepting ditch. According to the invention, the intercepting ditch is formed in the upper end of the wall body, and the water guide assembly used for preventing the water from permeating into the wall body is further arranged in the intercepting ditch, so that most of the water on the mountain top can be drained through the intercepting ditch, the water permeating into the wall body is reduced, and the stability of the wall body is guaranteed.
Owner:杭州华耕土地规划设计咨询有限公司

Greening grid device and construction method of rock slope

A greening grid device for a rock slope, comprising a ventilating layer, a fine mesh fixed layer, a sprayed planting base, a grass seed box fixed net layer and a sprayed planting surface layer, which are sequentially fixed and connected by anchors on the upper surface of the rock slope; A cushion block is fixedly installed in the ventilation layer, the bottom surface of the cushion block is fixedly connected with the slope surface of the rock slope, and the top surface of the cushion block is fixedly supported on the bottom surface of the fine mesh fixed layer; the fine mesh fixed layer includes a fixed mesh Net, the fixed fine net and the grass seed box fixed net layer sandwich the fixed spray planting base; the grass seed box fixed net layer includes the grass seed box fixed net, and the steel wire cross connections inside the grass seed box fixed net are all fixed There is a grass seed box; the upper surface of the fixed mesh layer of the grass seed box is sprayed with a spray-planting surface layer. The greening grid device and its construction method use the characteristics of the grass seed box to the vegetation concrete construction by making the grass seed box fixed net with the grass seed box, and solve the germination rate and survival rate of the plant seeds after the spraying construction is completed. Low problem.
Owner:MCC TIANGONG GROUP

A road greening device with cold protection and water collection functions

The invention discloses a road greening device with functions of protecting against cold and collecting water, comprising a water storage tank and a greening tank, a greening tank is fixed on the upper end of the water storage tank, and a rotating shaft is installed on the outer side of the greening tank. A winding device is installed on the outer edge of the second protective plate and the winding device, and a protective cloth is extended on the outer side of the winding device. A supporting plate is fixed on the lower side of the greening tank, and the supporting plate is fixed in the interior of the water storage tank. The inside of the support plate is provided with a water absorption rod, and the water absorption rod penetrates through the support plate and is connected to the water storage tank and the greening tank. The road greening device with the functions of protecting against cold and collecting water can increase the water storage work of the greening device, thereby effectively reducing the soil and water loss of the greening device, and also ensuring that the greening in the greening tank can grow normally, ensuring the device's performance. Greening effect.
Owner:南京幸庄科技创新产业园管理有限公司

Shrub mixed planting method for railway slope in desertification region

The invention relates to a shrub mixed planting method for a railway slope in a desertification region. A framework and hollow bricks in window holes of the framework are constructed on the slope, andholes are dug in the hollow bricks for mixed planting of atriplex canescens and caragana microphylla. According to the method, shrubs such as the atriplex canescens and the caragana microphylla suitable for growing in the desertification region are selected and planted on the railway slope in the desertification region in a mixed manner in a certain mode, and a slope greening system is formed byreplacing and filling of high-quality planting soil, the drought-enduring and saline-alkaline-enduring shrubs, appropriate intercepting water measures and initial maintenance, so that the greening effect of the railway slope in the desertification region is ensured. The method has the advantages of being good in greening effect, high in soil conservation capacity, short in maintenance time, capable of saving water and low in cost, and is suitable for slope and terrace greening of railways, highways and the like in the desertification region.
Owner:CHINA RAILWAY FIRST SURVEY & DESIGN INST GRP

A saline-alkali ground windbreak greening pile

The invention discloses a saline land windproof greening pile comprising a pile body, a windproof device and a controller; the windproof device comprises an underground configuration pit and a windproof screen arranged in the configuration pit; the windproof screen is driven by a lifting part so as to lift in the configuration pit, thus blocking the pile body; the pile body is also provided with an air speed sensor electrically connected with the controller; when the air speed reaches certain value, the air speed is converted into an electric signal, and the signal is sent to the controller; the controller starts the lifting part so as to lift up the windproof screen, and the windproof screen can block the pile body so as to prevent wind from harming the greening pile, thus indirectly ensuring the saline land greening effect; when the air speed drops, the controller controls the lifting part so drop the windproof screen into the configuration pit, so the greening pile can be exposed, thus greening and beautifying the saline land; the saline land windproof greening pile can ensure the green plants on the pile body not to be harmed, thus ensuring the greening effect of the plants.
Owner:WEIFANG YOURONG IND

A method for preventing the foreign soil from being too wet to block the pipeline during the dry spraying operation of the foreign soil on the slope

The invention discloses a method for preventing a pipeline from being blocked by too-wet dressing soil in slope dressing soil dry-spraying operation. The method includes the following steps that firstly, improved dressing soil is prepared, wherein a sand material and vegetable matter are added to the water-contained dressing soil to be stirred and evenly mixed; and secondly, the improved dressing soil is sprayed to a mountain slope beside a road through a dressing soil dry-spraying process. By the adoption of the method, a dressing soil ratio improving method is adopted, bonded particles are effectively scattered, the matrix wall bonding phenomenon is effectively avoided, viscosity is reduced, and the aggregation phenomenon is reduced; the wall bonding phenomenon is reduced; and the pipeline blocking phenomenon generated in dry-spraying operation can be effectively prevented, smooth construction is guaranteed, waste is used, cost is reduced, the soil is evenly sprayed to the slope face of the slope, the construction progress is guaranteed, and the afforesting effect of the slope can be guaranteed.
Owner:TIANJIN RES INST OF BUILDING SCI

Road greening device with cold resisting function and water collecting function

The invention discloses a road greening device with a cold resisting function and a water collecting function. The greening device with the cold resisting function and the water collecting function comprises a water storage tank and a greening groove, wherein the greening groove is fixedly formed in the upper end of the water storage tank; in addition, a rotating shaft is arranged on the outer side of the greening groove; winding devices are respectively arranged on the outer side edge of a first protection plate and the outer side edge of a second protection plate; besides, the outer sides ofthe winding devices extend to form protective cloth; a supporting plate is fixedly arranged on the lower side of the greening groove and is fixedly arranged inside the water storage tank; water absorbing bars are arranged inside the supporting plate, penetrate through the supporting plate and are connected with the water storage tank and the greening groove; each winding device is internally provided with a winding shaft; in addition, the protective cloth winds the outer sides of the winding shafts. The road greening device with the cold resisting function and the water collecting function can add the water storage work of the greening device, thereby effectively reducing water and soil loss of the greening device; besides, normal growth of greened plants in the greening groove and the greening effect of the device can be ensured.
Owner:南京幸庄科技创新产业园管理有限公司

Artificial slope semi-rigid support ecological comprehensive treatment structure and its construction method

The invention discloses an artificial slope semi-rigid support ecological comprehensive treatment structure and a construction method thereof, including an anchoring system, a greening system, and a drainage and replenishment water storage system. On each step of the artificial slope dug into a stepped shape, each anchor system and the steps of the corresponding artificial slope form a greening system accommodation cavity; In the cavity, comprehensive ecological control is carried out on the artificial slope; the drainage and replenishment water storage system extends from the top of the artificial slope to the bottom of the slope, and the drainage and replenishment water storage system is bidirectionally connected with each greening system accommodation cavity, and discharges each While the afforestation system accommodates the water in the chamber, it can store water and replenish water to the afforestation system accommodating chamber when it is dry. Not only can it effectively discharge rainwater, but it can also take into account water storage and replenishment at the same time, preventing the weathering and disintegration of rocks on the surface of the slope, and reducing the cost of vegetation maintenance.
Owner:CHANGSHA UNIVERSITY OF SCIENCE AND TECHNOLOGY

Bar-planting-type greening groove structure of roadbed slope platform and mounting method

Disclosed are a bar-planting-type greening groove structure of a roadbed slope platform and a mounting method. The roadbed slope platform is conveniently and effectively greened and beautified, the construction efficiency is effectively improved, the survival rate of greening plants is increased, and the greening effect is ensured. The structure comprises the slope platform and a platform sealinglayer for sealing the slope platform, the upper edge of the platform sealing layer is transversely provided with prefabricated greening grooves at intervals, the two transverse side walls of each prefabricated greening groove are provided with anchoring members, the upper ends of the anchoring members are connected with the prefabricated greening grooves, and the lower portions of the anchoring members are anchored into a foundation at the lower portion of the slope platform and anchored with the foundation. The prefabricated greening grooves are filled with plant growing soil for planting thegreening plants.
Owner:CHINA RAILWAY ERYUAN ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products