This invention relates to the field of electrified construction equipment technology for water conservancy projects, and discloses an electrified construction towed track
system suitable for large-scale tunnel excavation. The
system includes a DC power supply track
system, an intelligent
sliding contact power receiving module, construction vehicle terminals, a current-collecting cable, an electric construction vehicle, and a
traction substation. The DC power supply track system adopts a modular splicing structure, allowing for dynamic disassembly and
relocation along with the tunnel excavation surface. The intelligent
sliding contact power receiving module uses strain gauges to achieve closed-loop
tension control of the current-collecting cable, combined with a mechanical anti-
derailment structure to ensure stable power reception. The electric construction vehicle has dual
modes: track-based power reception and trackless independent operation. This invention solves the problem of continuous power supply for electric
engineering machinery in dynamic construction of large tunnels, enabling full-cycle electrified construction of tunnels, and is applicable to underground
engineering construction scenarios such as water conservancy, transportation, and mining.