Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

32results about How to "Intuitive control" patented technology

Power distribution network operation-maintenance cockpit based on operation and distribution data and application thereof

The invention discloses a power distribution network operation-maintenance cockpit based on operation and distribution data and application thereof. The operation-maintenance cockpit comprises a quasi real-time data center and an application center, the quasi real-time data center is used for being connected with a production system, a dispatching system and a marketing system of an electric power company, obtaining production, dispatching and marketing operation data, and storing, centralizing, integrating, sharing and analyzing the operation data. The application center is connected with the quasi real-time data center through a uniform access interface and is used for calling a corresponding calculation module to process the operation data to obtain the operation state of a power distribution network or an assessment result of a single index according to a functional module and corresponding parameters selected by a user on a human-computer interface, and displaying the operation state of the power distribution network or the assessment result of the single index obtained through processing on the human-computer interface. Centralized operation monitoring, analyzing, controlling and managing are carried out on the power distribution network within a domain by means of the power distribution network operation-maintenance cockpit, and the cockpit is suitable for on-line risk assessment and early warning and capable of effectively promoting the capacity for operating the complex power distribution network of the user.
Owner:STATE GRID CORP OF CHINA +2

Method and system for discriminating data in regulatory adjustment

InactiveCN102360474AOptions for added flexibilityFlexible layoutInstrumentsAnalysis dataApplication server
The invention relates to a method and a system for discriminating data in regulatory adjustment. The method comprises the following steps of: warehousing initial data: planning databases and approved databases; inputting data to be approved, and merging the data to be approved with approved data in a corresponding control unit into data to be analyzed; validating the data to be analyzed, and comparing the data to be analyzed with regulatory data, validating whether the requirements are met or not one by one by taking the control unit as a boundary and taking control rules as contents, and giving discrimination and analysis results; and warehousing the data to be approved, and updating the approved data in the databases if the requirements are met and the data are confirmed to be warehoused. The system comprises a remote data entry client terminal, an approval client, an inquiry client, a center management console, an application program server, a planning database server, an approved database server and Ethernet equipment. Compared with the prior art, the method and the system have the advantages that: flexibility and scientificity of urban land and facility layout are improved under the condition of controllable overall indexes, and urban development is facilitated.
Owner:SHANGHAI TONGCHENG INFORMATION TECH

Control switch device of cruise control system of automobile

InactiveCN101786420AHappy drivingMeet the three elements of safe drivingDashboard fitting arrangementsElectric/fluid circuitLow speedSteering wheel
The invention relates to the field of a cruise control system of automobiles and provides a control switch device of a cruise control system of automobiles, which is similar to the existing similar device, and is characterized in that the starting, releasing and setting of the functions of the cruise control can be realized through the operation on a clipper or a knob, the set speed of an automobile can be discretionarily accelerated, decelerated for flexible control, and has no limit for low speed and roads; when a sole leaves an accelerator pedal, the functions of the cruise control are started and the cruising speed can be reinstated; when the sole treads the accelerator pedal, the functions of the cruise control are released, and the utilization ratio of the cruise control system can be effectively improved; the control switch device also comprises an A/D converter, the clipper is a linear displacement sensor, the knob is an angular displacement sensor which is embedded into and arranged on a steering wheel panel or near a steering wheel, and can also be embedded into and arranged on a shift knob; and the output end of the linear displacement sensor or the angular displacement sensor is connected with the signal input end of the A/D converter of an electronic control unit (ECU) of the cruise control system.
Owner:倪云飞

Automatic double-sided gluing machine for vertical doors and windows

The invention discloses an automatic double-sided gluing machine for vertical doors and windows. The gluing machine comprises a rack, a door and window conveying device, a front gluing machine head and a rear gluing machine head, wherein a front longitudinal beam capable of horizontally moving on the rack is arranged on a front side of the rack, the front gluing machine head is arranged on the front longitudinal beam and can move up and down along the front longitudinal beam, a rear longitudinal beam capable of horizontally moving on the rack is arranged on the rear side of the rack, and the rear gluing machine head is arranged on the rear longitudinal beam and can move up and down along the rear longitudinal beam. Compared with the prior art, the gluing machine is advantaged in that doorsand windows are erected for double-sided gluing, the structure is simple, the automation degree is high, operation is simple and convenient, double-sided gluing can be performed simultaneously, the consumed time is short, efficiency is high, labor intensity of workers is greatly reduced, the gluing quality is stable, and the gluing quality can be visually observed and controlled, the front longitudinal beam and the rear longitudinal beam for bearing the front gluing machine head and the rear gluing machine head and the driving mechanism thereof have the same structure, so processing and maintenance are convenient, and production cost of the equipment can be reduced.
Owner:济南唐林智能科技有限公司

Phenazine metal fullerene derivative, preparation method and controlling method of lifetime of excited state

The invention discloses a phenazine metal fullerene derivative, a preparation method and a controlling method of the lifetime of the excited state. The metal fullerene derivative is obtained by modifying a phenazine compound with electron donating characteristics on the surface of metal fullerene through an addition reaction. The lifetime of the excited state of the metal fullerene can be controlled through the method. The dynamical properties of the excited state of the phenazine metal fullerene derivative are characteristized by using femtosecond transient absorption spectra, and then the lifetime changes of the excited state are compared through data calculation and fitting. The phenazine metal fullerene derivative is novel in structure and has the advantages that the lifetime of the excited state is long and the characteristics of the excited state of the metal fullerene can be simply, efficiently and sensitively controlled. The phenazine metal fullerene derivative can be used in the optical physics and photochemistry processes, the problems that existing metal fullerene is short in lifetime of the excited state, undefined in controlling mode, complex in controlling means and poor in sensitivity are solved.
Owner:BEIJING FUNAKANG BIOTECH CO LTD

Mine intelligent management and control platform construction method based on geological survey guarantee system

ActiveCN114611180ARealize managementIntuitive implementation of daily managementGeometric CADData processing applicationsData centerGeological survey
The invention provides a mine intelligent management and control platform construction method based on a geological survey guarantee system, and relates to the technical field of mine intelligent mining, and the method comprises the steps: building a unified data center, multi-dimensional (x, y), (x, y, t), (x, y, z) and (x, y, z, t) geological survey guarantee system platforms, and achieving the dynamic processing and multi-dimensional visual display of geological survey data, completing the construction of a mine intelligent management and control basic platform and a visual operation interface; a multi-dimensional geological survey guarantee system is used as a base, various safety production system scenes and data are constructed and accessed, and visual patrol, digital twinning and remote industrial control are realized; and deep fusion, decision analysis and visual collaborative management and control of geological survey multi-source data and safety production and operation data are realized, and an intelligent management and control platform is formed. According to the invention, a new intelligent mine management and control mode based on geological survey multi-dimensional data is provided, and the construction of a mine intelligent management and control platform based on a geological survey guarantee system is realized.
Owner:BEIZHING LONGRUAN TEKNOLODZHIS INK

Wearable device and physiological information monitoring system and method

The invention provides a wearable device, a physiological information monitoring system and a physiological information monitoring method. The wearable device includes a device body, a measurement circuit, and a measurement trigger interface. The measurement circuit is disposed on the device body and adapted to perform a physiological information measurement operation to measure a physiological signal and generate physiological information accordingly. The measurement trigger interface is triggered to generate a measurement trigger signal. The measurement circuit performs the physiological information measurement operation in response to the measurement trigger signal.
Owner:HTC CORP

Hydroelectric generating set work state algorithm facing centralized control

The present invention discloses a hydroelectric generating set work state algorithm facing centralized control. The algorithm comprises: collecting related devices and output data of the hydroelectric generating set; defining a plurality of states, and defining the judging logic of each state; determining the state of the hydroelectric generating set according to the collected data and the judging logic, and performing statistics of the state parameters of the hydroelectric generating set; and displaying the hydroelectric generating set state and the state parameters for users to perform real-time monitoring and control. According to the collection data detection set and the state of the hydroelectric generating set, the state parameters are subjected to statistics, the state and the state parameters are subjected to display, and the hydroelectric generating set is subjected to optimizing control; and moreover, compared to the traditional method, the hydroelectric generating set work state algorithm facing the centralized control can relieve the operators' workload so as to reduce the misoperation risk of the hydroelectric generating set and reach the purposes of centralized management and control, optimized dispatching and cost decreasing and benefit increasing.
Owner:NANJING HEHAI NANZI HYDROPOWER AUTOMATION +2

Manufacturing technology of shoe insole shaping mold and shoe insole shaping mold

The invention provides a manufacturing technology of a shoe insole shaping mold and the shoe insole shaping mold. The manufacturing technology comprises the steps that (1) a 3D data model of a shoe tree is scanned by a 3D scanner according to the shoe tree provided by a customer; (2) data of an upper mold and data of a lower mold of the shoe insole shaping mold are made according to the 3D data model of the shoe tree; (3) a processing program of the upper mold and a processing program of the lower mold of the shoe insole shaping mold are written; (4) the processing program of the upper mold and the processing program of the lower mold are inputted into a machining center of a numerical control machine tool, and processing and manufacturing of the upper mold and the lower mold are conductedthrough the machining center of the numerical control machine tool; (5) laser marking is conducted on the processed upper mold and the processed lower mold; (6) an upper mold shaping plate which is manually made and a lower mold shaping plate which is manually made are installed on the upper mold and the lower mold correspondingly; and (7) mold testing is conducted, and manufacturing of the shoeinsole shaping mold is accomplished. The manufacturing technology of the shoe insole shaping mold and the shoe insole shaping mold have the advantages of being capable of achieving data management andbeing low in manufacturing cost and low in manufacturing technology difficulty.
Owner:肖顺才

Tau protein visual PROTAC degradation compound as well as preparation method and application thereof

PendingCN114736264APromote degradationDesign visualizationOrganic active ingredientsNervous disorderProtein Degradation ProcessChemical compound
The invention provides a Tau protein visual PROTAC degradation compound and a preparation method and application thereof.The compound is obtained by condensing E3 ligase ligands with linker to prepare intermediates and connecting the intermediates with target probe molecules, in target selection, the selective binding effect of target small molecules and Tau protein is reserved, and in addition, the target probe molecules and the Tau protein can be combined, so that the target probe molecules can be combined with the target probe molecules, and the target probe molecules can be combined with the target probe molecules to obtain the Tau protein visual PROTAC degradation compound. The target compound is endowed with a brand new function of generating near-infrared fluorescence, so that the target compound can give play to the function of targeted degradation of Tau protein and can also emit detectable near-infrared fluorescence when the target compound is combined with Tau protein, and the degradation process of Tau protein is visualized; d-12 and D-16 both show fluorescence tendency similar to p-Tau reduction, visual design is achieved, the protein degradation process is expected to be more visually observed and regulated, and possibility is provided for combination of disease detection means and treatment means.
Owner:EAST CHINA NORMAL UNIV

Operation and inspection cockpit of distribution network based on distribution data and its application

The invention discloses a power distribution network operation-maintenance cockpit based on operation and distribution data and application thereof. The operation-maintenance cockpit comprises a quasi real-time data center and an application center, the quasi real-time data center is used for being connected with a production system, a dispatching system and a marketing system of an electric power company, obtaining production, dispatching and marketing operation data, and storing, centralizing, integrating, sharing and analyzing the operation data. The application center is connected with the quasi real-time data center through a uniform access interface and is used for calling a corresponding calculation module to process the operation data to obtain the operation state of a power distribution network or an assessment result of a single index according to a functional module and corresponding parameters selected by a user on a human-computer interface, and displaying the operation state of the power distribution network or the assessment result of the single index obtained through processing on the human-computer interface. Centralized operation monitoring, analyzing, controlling and managing are carried out on the power distribution network within a domain by means of the power distribution network operation-maintenance cockpit, and the cockpit is suitable for on-line risk assessment and early warning and capable of effectively promoting the capacity for operating the complex power distribution network of the user.
Owner:STATE GRID CORP OF CHINA +2

A Centralized Control-oriented Algorithm for Working State of Hydropower Units

ActiveCN106681249BReasonable full load operation quantityIncrease the number of full-load operationsProgramme controlComputer controlState parameterMonitoring and control
The present invention discloses a hydroelectric generating set work state algorithm facing centralized control. The algorithm comprises: collecting related devices and output data of the hydroelectric generating set; defining a plurality of states, and defining the judging logic of each state; determining the state of the hydroelectric generating set according to the collected data and the judging logic, and performing statistics of the state parameters of the hydroelectric generating set; and displaying the hydroelectric generating set state and the state parameters for users to perform real-time monitoring and control. According to the collection data detection set and the state of the hydroelectric generating set, the state parameters are subjected to statistics, the state and the state parameters are subjected to display, and the hydroelectric generating set is subjected to optimizing control; and moreover, compared to the traditional method, the hydroelectric generating set work state algorithm facing the centralized control can relieve the operators' workload so as to reduce the misoperation risk of the hydroelectric generating set and reach the purposes of centralized management and control, optimized dispatching and cost decreasing and benefit increasing.
Owner:NANJING HEHAI NANZI HYDROPOWER AUTOMATION +2

Operation and maintenance monitoring method, device, equipment and system based on site status

The invention discloses an operation and maintenance monitoring method, device, device and system based on site status. The method includes: making statistics on network element equipment in the site, and according to the network type or network element equipment to which the network element equipment belongs Type determines its corresponding service type and classifies it into the corresponding pre-configured site service category; respectively analyzes the network element alarms in each site service category to obtain the alarm service impact degree, and based on the alarm service influence degree and site service The impact factor obtains the alarm priority of the corresponding network element to provide a basis for order dispatching. The operation and maintenance monitoring method based on the site status provided by the present invention realizes that the site is used as the monitoring unit, combined with the influence degree of the alarm service, analyzes the multi-service status of the site, quickly, efficiently and intuitively controls the site operation status, and understands the health of various services. It is convenient to determine the basis for site dispatch processing, and improve the overall network operation and maintenance efficiency.
Owner:ZTE CORP

Refined water-electricity-woodworking construction paying-off technology

The invention discloses a refined water, electricity and woodworking construction paying-off process, and particularly relates to the field of buildings, and the refined water, electricity and woodworking construction paying-off process comprises the steps of S1) paying-off preparation, S2) scanning modeling, S3) model proofreading and S4) intelligent paying-off. According to the refined hydroelectric and woodworking construction paying-off technology, through mutual cooperation of the step S11 and the step S12 before paying-off, cleaning of a building to be scanned is achieved, the situation that the precision of subsequent scanning data is affected by other sundries is avoided, errors are reduced, intelligent paying-off in the subsequent step S4 is facilitated through cooperation of the step S13, and the working efficiency is improved. According to the method, the influence of refraction of sundries on the integrity of laser projection is avoided, the paying-off walking of the paying-off robot is facilitated, the situation that errors are easily generated by modeling data due to the fact that single data is adopted as a support is avoided through calibration of different views in model calibration and coincidence of different base points on the calibration of the different views, and the working efficiency of the paying-off robot is improved. And the error is kept in a controllable range.
Owner:上海星杰装饰有限公司

Internet-of-things intelligent buffet stove

The invention discloses an Internet of Things (IOT) intelligent buffet stove which comprises a bottom plate and a basin reinforcing plate, aluminum alloy supporting legs are fixedly connected to fourcorners of the bottom plate; the top of the bottom plate is fixedly connected with a main frame, a side surface of the main frame is fixedly connected with a display circuit board through a cross round head tail cutting self-tapping screw, a left side of the display circuit board is fixedly connected with a display panel box cover through a cross round head self-tapping screw, a right side of themain frame is movably connected with a dining furnace door template through a nut, and the inner wall of the main frame is fixedly connected with a laminate. The invention discloses the IOT intelligent buffet stove, through the arrangement of an Internet server and a gateway controller, the buffet stove can be better adjusted without being limited by the position, the temperature of the buffet stove can be controlled more accurately and stably through arranged temperature measuring sensor, dry burning sensor and touch key, and the situation that food in the buffet stove is burnt due to excessive heating and eating is affected is prevented.
Owner:日升餐厨科技(广东)有限公司

Aniline Metal Fullerene Derivatives, Preparation Methods and Controlling Method of Excited State Lifetime

The invention discloses an aniline metal fullerene derivative and a preparation method thereof and a regulation method for the lifetime of an excited-state aniline metallofullerene derivative. The preparation method of the aniline metallofullerene derivative comprises the steps of in the presence of an amino acid, conducting an addition reaction, modifying the surface of metallofullerene with an aniline compound having an electron-donating property, and then obtaining the aniline metallofullerene derivative. The lifetime of the excited-state aniline metallofullerene derivative can be regulated through the preparation method. The kinetic properties of the excited-state aniline metallofullerene derivative are characterized by using femtosecond transient absorption spectra, and then changes of the lifetime of the excited-state aniline metallofullerene derivative are compared through data calculation and fitting. The aniline metallofullerene derivative is novel in structure, and the lifetime of the excited-state aniline metallofullerene derivative can reach the nanosecond order or the microsecond order, is long in lifetime and good in stability, and can be used in photophysical and photochemical processes; the problems that existing excited-state metallofullerene is short in lifetime, uncertain in regulation mode, complex in regulation way and poor in sensitivity are solved.
Owner:赤峰福纳康生物技术有限公司 +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products