Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

41results about How to "Guaranteed access efficiency" patented technology

Dynamic duplicate consistency maintenance system and method, and cloud storage platform

The invention discloses a dynamic duplicate consistency maintenance system and method, and a cloud storage platform. The system comprises a request receiving module used for receiving a duplicate updating request sent by a client to a meta data server end through a high consistency principle; a file obtaining module used for obtaining a corresponding updating file queue in the meta data server end after the meta data server end responds to the duplicate updating request received by the request receiving module; and a low consistency maintenance module used for executing low consistency maintenance processing of a duplicate between the meta data server end and a storage server end by use of the updating file queue. According to the invention, maintenance processing performed on the duplicate on a cloud storage platform simultaneously on the basis of the high consistency principle and a low consistency principle, the advantage of quite high duplicate access efficiency of the high consistency principle is integrated, the advantage of quite small system resource consumption of the low consistency principle is also introduced, consumption of too much system resources is avoided, and a certain duplicate access rate is also guaranteed.
Owner:INSPUR BEIJING ELECTRONICS INFORMATION IND

Test box for sandy soil geotechnical model

The invention discloses a test box for a sandy soil geotechnical model. The test box comprises a box body, a supporting part, a liquid level control plate and three water permeable plates, wherein thewater permeable plates are made of sintered metal and are detachably connected with a corresponding bottom supporting plate and two corresponding side supporting plates respectively; a first cavity layer is arranged between the bottom supporting plate and the inner wall of the bottom of the box body; a second cavity layer is arranged between the side supporting plates and the liquid level controlplate; a third cavity layer is arranged between the liquid level control plate and the side wall of the box body; a first water through hole is formed in the first cavity layer; a second water through hole is formed in the third cavity layer; the first cavity layer and the water permeable plates are arranged at the bottom of the box body to form a buffering through-flow system, so that the impactdamage of fluid to the model is avoided and the introduction efficiency of the fluid is guaranteed; the second cavity layer, the water permeable plates, the liquid level control plate and the third cavity layer are arranged on the two sides of the box body to form a water permeable wave absorbing system, so that pore pressure accumulation is eliminated, and two-dimensional seepage and wave elimination are realized.
Owner:INST OF ENG MECHANICS CHINA EARTHQUAKE ADMINISTRATION

Multi-state model management method based on segmented encoding

The invention discloses a multi-state model management method based on segmented encoding. The multi-state model management method comprises the following steps that 1) a power grid model management root directory is established; 2) a basic power grid model is created, a benchmark version directory is created by a power grid planning model data management service under the power grid model management root directory established in the step 1), and a basic state directory is created under the benchmark version directory and the created basic power grid model is stored in the basic state directory; 3) the basic power grid model created in the step 2) acts as a benchmark to create a planning case and then an annular plan is created in the planning case; and the benchmark version, the basic state and planning state information on which the planning case depends are encoded according to the planning case encoding rules so that power grid planning case codes are obtained; and 4) the power grid planning case codes in a power grid planning model access request are analyzed and then the power grid planning model data are inquired in an instance pool through corresponding service instances according to the analysis result so that access inquiring of multiple sets of power grid planning model data can be simultaneously realized by the method.
Owner:STATE GRID SHAANXI ELECTRIC POWER CO ECONOMIC & TECHCAL RES INST

Disassembly and assembly auxiliary lifting device with anti-sideslip function for automobile repair

The invention discloses a disassembly and assembly auxiliary lifting device with an anti-sideslip function for automobile repair, and belongs to the technical field of automobile repair. The disassembly and assembly auxiliary lifting device comprises a shearing elevator body, the top of the shearing elevator body is fixedly connected with a fixing seat, the two sides of the fixing seat are fixedly connected with direction adjusting mechanisms through filling mechanisms, and the bottoms of the direction adjusting mechanisms are fixedly connected with adjusting mechanisms. According to the disassembly and assembly auxiliary lifting device, direction adjusting seats on the two sides are attached to the lifting attachment positions of the bottom of an automobile, then the positions opposite to the bottom of the automobile can be filled with inflatable air bags, meanwhile, when threaded barrels are screwed to rotate, second threaded columns in threaded connection can be driven to move downwards to pull elastic rods to downwards drive the direction adjusting seats to rotate and deviate around pin shafts; and the fitting limiting effect over the bottom of the automobile is fully matched, the elastic rods can avoid deviation of the direction adjusting seats caused by shaking, the supporting stability and adaptability are effectively improved, the top inflatable air bags can guarantee fitting tightness, sideslip of the automobile is avoided, and the automobile lifting effect is achieved.
Owner:杭州启毓日用百货有限公司

Memory management device and method oriented to multi-core system

The invention provides a memory management device and method oriented to a multi-core system. The device comprises a private memory management module, a fair synchronization control module and a global memory management module, wherein the private memory management module manages a private memory area and is mainly used for applying for small-block memories, and each core corresponds to one private memory area, adopts an unlocked design and avoids the expenditure of a lock; the fair synchronization control module guarantees that fair synchronization can be realized when multiple cores retrievememory from the global memory management module; and the global memory management module manages a global memory area, provides service for the private memory management module, is in charge of the application of large-block memory, and carries out memory acquisition from the system when the memory is insufficient. By use of the device, a private unlocked technology and a memory block buffer technology are adopted and cooperated with a fair synchronization mutual exclusion algorithm to guarantee memory access efficiency and resource fighting fairness. A fair synchronization mechanism is addedto the avoid unfairness of memory resource competition among cores, and meanwhile, memory access efficiency is guaranteed.
Owner:哈尔滨英赛克信息技术有限公司

Excitation point data processing method and device for seismic exploration

PendingCN113672585AAvoid data fragmentationGuaranteed efficient retrieval and accessDatabase management systemsSpecial data processing applicationsPhysicsCollections data
The invention discloses an excitation point data processing method and a device for seismic exploration. The method comprises the following steps: collecting excitation point observation system data and corresponding excitation point information; according to the excitation point information and a pre-established data management model, determining database position information corresponding to the excitation point observation system data, wherein the data management model is pre-established according to excitation point field collection data; and storing excitation point observation system data according to the database position information. The excitation point data are effectively managed, the problems of data dispersion, retrieval disorder, much redundant information and the like are avoided, and the retrieval and access efficiency of the excitation point data is guaranteed.
Owner:BC P INC CHINA NAT PETROLEUM CORP +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products