Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

35results about How to "Working at heights safety" patented technology

Library book handling auxiliary vehicle

The invention relates to an auxiliary library book moving trolley used in libraries. The auxiliary library book moving trolley comprises a trolley main body and silence foot wheels, wherein the trolley main body comprises a trolley bottom plate, side trolley baffles, a front trolley baffle and a rear trolley baffle; screw rod device holding boxes are arranged at the upper parts of both the front trolley baffle and the rear trolley baffle in opposite directions; the screw rod device holding boxes are coverless cuboids; each screw rod device holding box is internally provided with two screw rod liftingdevices; a rocker is arranged on the rear trolley baffle; four screw rod lifting devices are controlled by the rocker uniformly; four silence pulleys are arranged on the bottom side of the trolley bottom plate, that is, two silence pulleys are arranged at the front end and the rear end respectively; an upper-layer book drawer, a middle-layer book drawer and a lower-layer book drawer are arranged on the trolley main body. Through the adoption of the auxiliary library book moving trolley, workers can conveniently place books on high-level shelves, the workload of the workers is alleviated, the workers can conveniently take the books in the trolley as the book drawers can be pulled outwards, and thus the working efficiency is improved.
Owner:CHINA UNIV OF PETROLEUM (EAST CHINA)

Method for constructing concrete chimney cylinder body through formwork lifting process

The invention provides a method for constructing a concrete chimney cylinder body through a formwork lifting process, which belongs to the technical field of civil engineering construction. The main content of the method provided by the invention is as follows: manufacturing a formwork, mounting a steel pipe headframe and an operating platform, mounting a manual lifter, binding up with steel bars, fastening the formwork, building an inner liner and pouring concrete. The method provided by the invention is low in one-time investment, low in construction cost, easy for combination and assembly and relatively strong in adaptability, and can perform flexible adjustment according to the diameter of a silo of a chimney, realize convenience for combination, mounting and detachment, and improve quality and work efficiency; and furthermore, the construction height of the chimney can not be limited. As the formwork lifting construction operation of the chimney is discontinuous, the method is not affected by rain and snow weather and in line with the conventional operation habit. The method provided by the invention has the advantages of fast construction speed, good appearance quality of the cylinder wall, smooth surface of the cylinder body and no rubbing traces, tension fracture or other quality common faults during sliding formwork construction.
Owner:CHINA MCC17 GRP

Novel 10kV grounding device

The invention relates to a novel 10kV grounding device, which comprises a hanging rack, a grounding wire, a grounding pin and three hook type grounding rods, wherein the hanging rack comprises a vertical ladder frame formed by welding a first vertical rod, a second vertical rod, an upper cross rod and a lower cross rod, lifting hooks are fixedly arranged at the tops of the first vertical rod and the second vertical rod, and three buckles are fixedly arranged on the lower cross rod; the upper cross rod is used for bearing hooks of the three grounding rods; the three buckles are respectively used for clamping insulating rods of the three grounding rods; a first branch line, a second branch line and a third branch line of the grounding wire are fixedly connected with the wiring terminals on the three grounding rods respectively, and a tail line of the grounding wire is fixedly connected with the wiring terminal on the grounding pin. By adopting the technical scheme, the high-altitude operation of hanging the grounding wire can be safer.
Owner:STATE GRID SHANDONG ELECTRIC POWER CO QIHE POWER SUPPLY CO

Star wheel transition device for padlock of safety rope

InactiveCN105498116APrevent saggingAvoid taking it offSafety beltsEngineeringWire rope
The invention relates to the field of matched components of a steel rope, in particular to a star wheel transition device for a padlock of a safety rope. A hook penetrating wheel of the transition device is used for supporting the steel rope. A plurality of the transition devices have the effect of pulling the steel rope, so that the steel rope is prevented from dangling, and the steel rope can be proximately maintained at a straight line; when the padlock of the safety rope slides to one side of the hook penetrating wheel, an operator can swing the safety rope to enable the hook penetrating wheel to rotate; when the hook penetrating wheel rotates to a certain angle, wheel angles for vertically preventing the padlock from passing through, on the hook penetrating wheel, can rotate to the other side of the transition device, the padlock continues sliding to the other side of the transition device along the steel rope, and under the premise that the padlock is not disassembled, the padlock is enabled to pass through the transition device smoothly. The transition device not only has the effect of pulling the steel rope but also can enable the padlock to slide on the steel rope smoothly, so that the occurrence of the situation that the padlock is removed from the steel rope is avoided, further the operating difficulty of the operator in high-altitude work is greatly reduced, and the process of the high-altitude work is safe.
Owner:GUANGDONG DISHENG ELECTRIC POWER STEEL EQUIP

Wire clamp retractable operating device

The invention discloses a thread jamming device winding and unwinding operation device which comprises a main connecting plate, a containing plate and a recycling plate. Both the containing plate and the recycling plate are fixedly connected with the main connecting plate, two connecting holes, a first pin shaft hole and a second pin shaft hole are formed in the main connecting plate, the two connecting holes are used for being connected with safety hooks, the first pin shaft hole is used for allowing an upper jaw fixing pin shaft to be inserted to enable the main connecting plate to be connected with an upper jaw of a thread jamming device, and the second pin shaft hole is used for allowing a lower jaw fixing pin shaft to be inserted to enable the main connecting plate to be connected with a lower jaw of the thread jamming device. A containing pulling ring is arranged on the end portion of one end, far away from the main connecting plate, of the containing plate, and a recycling pulling ring is arranged on the end portion of one end, far away from the main connecting plate, of the recycling plate. The thread jamming device winding and unwinding operation device has the advantages of bringing convenience to a user who uses the thread jamming device to place the thread jamming device at the appropriate thread holding position, bringing convenience to recycling the thread jamming device, being simple in structure and easy to manufacture and the like.
Owner:STATE GRID CORP OF CHINA +2

Electrical operation vehicle

InactiveCN107915178AConditions to reduce or counteract transition offsetsAvoid large-scale shakingLifting devicesEngineeringPower apparatus
The invention belongs to the technical field of high-altitude operation equipment and provides an electrical operation vehicle. The vehicle comprises a vehicle body; a mounting platform is rotationally mounted on the vehicle body; a supporting frame and a steel cable winding roller driven by a first power device are arranged on the mounting platform; a steel cable winds around the steel cable winding roller; a cross beam is mounted at the top end of the supporting frame; a steel cable wheel is rotationally mounted at one end of the cross beam; a telescopic rod driven by a second power device is glidingly mounted at the other end of the cross beam; a fixed pulley is rotationally mounted at one end of the telescopic rod; a movable pulley is rotationally mounted on a lifting lug; the steel cable winds around the steel cable wheel, the fixed pulley and the movably pulley sequentially; the end of the steel cable is fixedly connected onto the cross beam; two groups of connecting rod mechanisms comprising first connecting rods and second connecting rods are arranged between the lifting lug and a working lifting basket; the first connecting rods and the second connecting rods are arrangedin the scissor-fork shape; and two ends of each of the first connecting rods and the second connecting rods are hinged to the lifting lug and the working lifting basket respectively. By the aid of thevehicle, the working range and the working efficiency are increased, movement of the working lifting basket or the phenomenon of swaying during working can be effectively avoided, and the safety performance is higher.
Owner:李秀荣

High-altitude stringing protection device

The invention discloses a high-altitude stringing protection device, and belongs to the technical field of power construction. The high-altitude stringing protection device comprises a first installation unit, a second installation unit and a protection net, wherein the first installation unit comprises a first installation frame, a rolling assembly, an air bag and a first pull rope assembly, the rolling end of the rolling assembly and the air bag are arranged on the two sides of an external cable in the first direction, the driving end of the rolling assembly can drive the rolling end to move in the second direction and can drive the first installation frame to move in the second direction, the second installation unit and the first installation unit are oppositely arranged in the second direction, the second installation unit comprises a second installation frame, a fixing piece, an air pump and a second pull rope assembly, the air pump can inflate the air bag to enable the external cable to be extruded between the rolling end and the air bag, the fixing piece is detachably connected to the external cable, the two ends of the protection net are connected with the first pull rope assembly and the second pull rope assembly respectively. According to the invention, the safety of high-altitude stringing is ensured.
Owner:GUANGDONG POWER GRID CO LTD +1

Data processing method and device for external wall water spraying

The invention discloses a data processing method and device for water spraying on an external wall, which is characterized in that it comprises the following operation steps: step S1, image acquisition; S2, image generation; S3, image display; S4, status assessment; the beneficial effects of the present invention are , the water spray device can be accurately positioned to the water spraying test section through the stabilizing device and the transmission device, which saves the complicated process of manually arranging the water spray device, making it safer and more efficient to work at heights; through the water pressure sensor, water pressure sensor The setting of the module and the numerically controlled pressure regulator makes the spraying water pressure control within the specification requirements during the test, and the spraying test effect is more ideal; the three-dimensional image collection can be realized through the monitor, which can not only automatically identify the leakage situation, but also Leakage warning information can be issued, thereby improving the accuracy of technicians in judging the leakage status of the external wall; there is video monitoring throughout the test process, and the test video is saved in real time, providing a decision-making basis for the leakage rectification plan.
Owner:广东省有色工业建筑质量检测站有限公司

A self-tightening rod climbing device

InactiveCN110075492BAchieve self-tighteningForce safe and reliableClimbingClassical mechanicsEngineering
The invention provides a self-tightening rod climbing device, which comprises a regulating clamp element, a first holding ring, a second holding ring, a pedal, a piston plate, a positioning plate, a clamp foot, anti-slip rubber, a slide groove, a positioning rod, a linkage rod, a stressed plate, a clamping and connecting edge, a hollow groove, an anti-slip threaded plate and a passive plate, wherein the upper and lower sides of the regulating clamp element are movably connected with the first holding ring and the second holding ring through screw bolts; the anti-slip rubber is arranged on thesurface of the first holding ring in an embedded way; the piston plate, the positioning plate and the clamp foot are sequentially arranged inside the second holding ring from the outside to the inside. The back surface of the passive plate is an inclined surface, and the inclination direction is opposite to the inclination direction of the stressed plate, so that the position of the piston plate cannot be changed; the passive plate is extruded by force and extends outwards; further, the anti-slip threaded plate is used for realizing the contact with the rod; meanwhile, the tight clamping of the anti-slip threaded plate on the rod is realized; the self-tightening goal is achieved. By using the arrangement, the self weight of the user is used for clamping, so that the device is safer in theuse process.
Owner:ZHEJIANG HONGXIANG STEEL STRUCTURE CO LTD

Construction device for wall connecting piece assembly for scaffold

A construction device for a wall connecting piece assembly for a scaffold comprises a wall body. A hole groove is formed in the outer side face of the wall body; a transverse pipe is fixedly installedin the hole groove, and an end cover is fixedly installed at the left end of the transverse pipe; a first through hole is formed in the right end face of the end cover and internally provided with atransverse shaft; the transverse shaft is in movable bearing connection with the first through hole; a driving gear is fixedly installed at the right end of the transverse shaft and located in the transverse pipe; a second through hole is formed in the inner side face of the wall body, and the central lines of the second through hole and the first through hole are coaxial; the left end of the transverse shaft is located in the second through hole; a plurality of first lead screws which are distributed evenly are arranged on the periphery of the driving gear; the left ends of the first lead screws are in movable bearing connection with the right side of the end cover, and the right ends of the first lead screws are connected with the inner wall of the transverse pipe through shaft seats; and driven gears are fixedly installed at the left ends of the first lead screws, and the driving gear is matched with the driven gears in an engaged mode. The construction device has the function of mounting various objects such as the scaffold and an advertising board simultaneously, a working platform can be mounted conveniently in subsequent construction, the structure is simple, and the function is diversified.
Owner:舒伟

A construction device for scaffolding and wall components

A construction device for a wall connecting piece assembly for a scaffold comprises a wall body. A hole groove is formed in the outer side face of the wall body; a transverse pipe is fixedly installedin the hole groove, and an end cover is fixedly installed at the left end of the transverse pipe; a first through hole is formed in the right end face of the end cover and internally provided with atransverse shaft; the transverse shaft is in movable bearing connection with the first through hole; a driving gear is fixedly installed at the right end of the transverse shaft and located in the transverse pipe; a second through hole is formed in the inner side face of the wall body, and the central lines of the second through hole and the first through hole are coaxial; the left end of the transverse shaft is located in the second through hole; a plurality of first lead screws which are distributed evenly are arranged on the periphery of the driving gear; the left ends of the first lead screws are in movable bearing connection with the right side of the end cover, and the right ends of the first lead screws are connected with the inner wall of the transverse pipe through shaft seats; and driven gears are fixedly installed at the left ends of the first lead screws, and the driving gear is matched with the driven gears in an engaged mode. The construction device has the function of mounting various objects such as the scaffold and an advertising board simultaneously, a working platform can be mounted conveniently in subsequent construction, the structure is simple, and the function is diversified.
Owner:舒伟

Outer wall water spraying data processing method and device

The invention discloses an outer wall water spraying data processing method and device, and the method is characterized in that the method comprises the following operation steps: S1, conducting image collection; S2, generating an image; S3, displaying the image; and S4, performing condition evaluation. The invention has the beneficial effects that a water spraying device can be accurately positioned to a water spraying test section through a stabilizing device and a transmission device, the complicated process of manually arranging the water spraying device is omitted, and high-altitude operation is safer and higher in efficiency; through the arrangement of a water pressure sensor, a water pressure sensing module and a numerical control pressure regulator, the water spraying pressure in the test process can be controlled within the standard requirement, and the water spraying test effect is more ideal; three-dimensional images can be collected through a monitor, the leakage condition can be automatically recognized, leakage early warning information can be sent out, and therefore the accuracy of judging the leakage condition of the outer wall by technicians is improved; and the whole test process is monitored through video recording, test video recording is stored in real time, and a decision basis is provided for a leakage rectification scheme.
Owner:广东省有色工业建筑质量检测站有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products