The invention discloses 
a site arrangement construction method using BIM technology, which is characterized in that the site arrangement is divided into three stages: a 
design stage; 
simulation phase;an adjustment phase; a 
design phase. Before construction, carry out two-dimensional site 
layout; use BIM construction site 
layout software to optimize the 
layout; using BIM construction site layout 
software, combined with site 
terrain rendering model; setting relevant variables in the whole construction process; 
simulation stage: simulate in the three-dimensional site layout model, set the 
time variable in advance, simulate the whole process of construction, check the irrationality of the construction group, adjust the design of the construction group, and form the 
final version; adjustment stage: combined with the 
time limit adjustment of the critical line caused by force majeure factors on site, according to the actual progress of the site, optimize the model, adjust the construction group, then simulate, and then adjust, the model runs in PDCA mode, so that the construction group can be optimized. BIM transforms the layout into a visual, intuitive three-dimensional layout, so thatthe space achieves reasonable optimization objectives.