The present invention relates to a method for
transformer substation telecontrol device and regulation and control
master station remote signaling automatic closed-loop joint debugging. A
transformer substation monitoring background real-time
database is taken as correct standard basis, EXCEL model telecontrol file published by the regulation and control
master station is taken as joint debugging task guidance, and newly developed automatic closed-loop joint debugging
software based on the IEC61850 protocol is employed to lead in the
transformer substation monitoring background SCD configuration file to simulate telecontrol data and send the telecontrol data to the transformer substation background and the telecontrol device step by step. The transformer substation monitoring background receives the simulated telecontrol data and returns the telecontrol data of the monitoring background real-time
database back to the automatic closed-loop joint debugging
software based on the IEC61850 protocol; the regulation and control
master station receives the telecontrol message of the telecontrol device and performs analysis, and returns real-time
database telecontrol data of the regulation and control master
station back to the automatic closed-loop joint debugging
software based on the IEC61850 protocol to automatically compare the telecontrol data of the regulation and control master
station and the transformer substation monitoring background. The correction rate of the method can reach 100%, the time saving rate of the method can reach more than 95%, the work efficiency is greatly improved, and the reliable and
safe operation of the
power grid is ensured.