36 results about "Techno economic" patented technology

Techno-economic assessment. Jump to navigation Jump to search. Techno-economic assessment or Techno-economic analysis (abbreviated TEA) is a methodology framework to analyze the technical and economic performance of a process, product or service. TEA normally combines process modeling, engineering design and economic evaluation.

Yellow River upstream cascade hydroelectric station operation design and optimized dispatching method as well as equipment

The invention relates to a method for united operation design and optimized dispatching of a Yellow River upstream cascade hydroelectric station, which comprising the following steps of: measuring daily average reservoir level and downstream daily average tail-water level of each power station through a water level sensor; measuring discharged flow of each power station through an ultrasonic flowmeter; establishing a cascade reservoir united optimized dispatching model through a cascade hydroelectric station united optimized dispatching model module; computing and analyzing a cascade hydroelectric station united optimized dispatching path through a dispatching path computation and analysis module; carrying out unified operation design on a cascade hydroelectric station group system through a cascade hydroelectric station group system unified operation design module; and carrying out unified dispatching on the cascade hydroelectric station group system through a cascade hydroelectric station group system unified dispatching module. The invention is simple, clear and practical with high pertinence, can enable average annual energy output of a Yellow River upstream cascade power station group after the power stations in Laxiwa and Jishi valley are put into operation to be increased by about 470 million degrees, and the water supply guarantee rate of Lanzhou cross section to reach95 percent, and has remarkable technical economic benefit.
Owner:WUHAN UNIV +1

Decision support method for oil reservoir management in the presence of uncertain technical and economic parameters

The method of the invention is applicable to oil production to obtain the impact of technical and economic uncertainties on the economic profitability of a reservoir and / or to optimize the position of a new well in order to meet a development strategy. The invention includes in stage 1, uncertain technical parameters having an influence on the reservoir production are selected; in stage 2, an analytic model expressing the reservoir production in the course of time is determined as a function of the parameters selected in stage 1, from production values obtained by means of a flow simulator; and in stage 3, a model expressing the economic profitability of the reservoir is determined as a function of the technical and economic parameters, from the analytic model determined in stage 2.
Owner:INST FR DU PETROLE

Warship reliability quantitative requirement demonstration method

InactiveCN102103722AIn line with engineering practicePerfect reliability parameter decomposition technologyData processing applicationsOperabilityEngineering
The invention discloses a warship reliability quantitative requirement demonstration method. The method comprises the following steps of: 1, determining a warship reliability top layer parameter index; 2, decomposing the warship reliability top layer parameter index; 3, determining a warship reliability parameter limit value; 4, balancing the warship reliability parameter index and expense; and 5, analyzing the technical and economic practicability of the warship reliability parameter index. By adopting the method, a warship reliability quantitative requirement demonstration method which is consistent with the condition of China and has high operability is provided for the determination of a warship reliability parameter, warship reliability quantitative requirement demonstration work is guided, and reliability level of a warship is raised.
Owner:BEIHANG UNIV

Electric power engineering project review system

InactiveCN109858751AReduce compliance and internal control risksAchieve normalizationOffice automationResourcesManagement researchWork task
The invention relates to an engineering project review system, and belongs to the technical and economic review management research field of the whole process of an electric power engineering construction project. The system is composed of a user layer, an application layer, a platform layer and a data layer, and comprises a work task module, a project review module and a system management module.The work task module is mainly used for displaying an automatic push message reminder for reviewing a work state of a project in the system. The project review module is used for realizing scientificdecision making, investment control and online review evaluation of benchmarking management of each stage of electric power engineering project construction. The system management module is used forsystem flow design, monitoring, historical data management and the like. The system solves the problems of unclear review work flow, unknown responsibility, data loss, incomplete content, insufficientmanagement benchmarking data and the like in the construction process of the electric power engineering project, realizes standardized, normalized and informationized management of project review work, improves the work quality and efficiency, and promotes improvement of the fine management level of engineering project construction.
Owner:中国大唐集团科学技术研究总院有限公司

Techno-economic evaluation method for supply side involving in new energy peak regulation

The invention provides a techno-economic evaluation method for a supply side involving in new energy peak regulation. The method comprises following steps of evaluating running cost and gains of a wind power plant side; evaluating running cost and gains of a thermal power plant; and determining a comprehensive benefit optimization model of the supply side. Wind power integration can have some impact on peak regulation technology output and economic benefit of a thermal power unit. Due to optimization of wind power acceptance volume and thermal power unit output, total economic benefit of the wind power side and the thermal power side is maximized; and policy support is provided for a peak regulation auxiliary service offered by the thermal power unit, so that the initiative involving in peak regulation of the thermal power unit is greatly improved.
Owner:CHINA ELECTRIC POWER RES INST +4

Technical value evaluation method and evaluation model of technical economic life

The invention provides a technical value evaluation method and an evaluation model of technical economic life based on a fuzzy evaluation theory and substance-field analysis. During quantitative analysis, by using a cluster analysis method, a fuzzy comprehensive evaluation method and the like, a quantitative analysis model of a technical value evaluation index system is constructed; meanwhile, for a mark sheet of technical sharing rate adjustment coefficients, a fuzzy comprehensive evaluation model for quantification of qualitative questions is used, so the current mainstream technical value evaluation system becomes more perfect, and an evaluation effect is more scientific. According to a substance-field model, a commissioned evaluation technology is subjected to functional decomposition, a technical function which causes key influence on a technical value is determined, the development history and development tendency of the technical function are shown by using different S curves, the different S curves are fitted and automatically calculated by using Loglet Lab 2 software, and the economic life of the key technical function of the commissioned evaluation technology is determined, so that the economic life of the commissioned evaluation technology is determined.
Owner:CHONGQING ACADEMY OF SCI & TECH

Microcosmic location selection system of high-altitude mountain wind power plant

The invention discloses a microcosmic location selection system of a high-altitude mountain wind power plant. The microcosmic location selection system is formed in a way that a data input module, a preprocessing module, a scheme database, a microcosmic location selection module, a power generation amount calculation module, a technical economy module and a data output module are connected in sequence, wherein the microcosmic location selection module is also independently connected with an electronic module and a civil engineering module; and the technical economy module is also independently connected with the electronic module and the civil engineering module. The microcosmic location selection system integrates professional templates of specialties including a technology specialty, an electronic specialty, a civil engineering specialty, a techno-economic specialty and the like in a wind power plant engineering design specialty, can lower a manual intervention rate while convenience is brought for coordinated management, minimizes human factor influence, improves the consistency and the accuracy of the microcosmic location selection design achievement of the high-altitude mountain wind power plant, realizes the intellectualization, the systematization and the high efficiency of microcosmic location selection work, and solves the difficulty that microcosmic location selection can not be accurately and reasonably carried out in the design of the high-altitude mountain wind power plant.
Owner:ENERGY CHINA YNPD

Sintering method of iron ore with added limonite

InactiveCN102925671AEliminate poppingImprove compactnessMixed materialsMaterial distribution
The invention provides a sintering method of iron ore with added limonite. The sintering method of the iron ore with the added limonite comprises the steps of limonite fine grinding treatment, limonite roasting treatment, batching, mixing, material distribution, material pressing and sintering with fire, wherein the granularity of the ground limonite is controlled to be below 1mm, the ground limonite is roasted at the temperature of 180-220 DEG C, the water content of the mixed material is controlled to be 7.3-7.6 wt%, and the quantity of the pressed materials in the step of material pressing is controlled to be 20-50 mm. The sintering method of the iron ore with the added limonite is capable of eliminating the explosion phenomenon in the sintering process of the coarse-grain limonite, improves the strength and the yield of sintered ore, improves the quality of the sintered ore, can reduce the content of crystal water in the limonite, is favorable for sintering, can reduce the consumption of fuel, improves the grain composition of the mixed materials, and improves the air permeability of material layers, thereby improving the yield and the quality of the sintered ore. In addition, the sintering method of the iron ore with the added limonite is capable of improving the compactness of the material layers, improves the structure of the sintered ore, controls the sintering speed at the same time, improves the metallurgical performance of the sintered ore, and is favorable for improving the techno-economic indicators of a blast furnace process.
Owner:PANGANG GROUP RESEARCH INSTITUTE CO LTD +2

Development of a Techno-Economic Process for Organo Refining of Coal

An improved organo-refining process to produce low ash clean coal from high ash coal, comprising: mixing coal, solvent and a co-solvent to produce a slurry; feeding the slurry to a reactor by pumping; extracting a coal-solvent mixture from the reactor; feeding the extracted mixture to a flasher unit; recovering about 30% of the solvent from the flashing unit; feeding the remaining heavy material to an evaporator; extracting about 60% of solvent from the evaporator; discharging the residue from the evaporator to a precipitator having water which produces a coal slurry; filtering the slurry in a rotary drum; collecting the super clean coal as a residue and feeding the filtrate into a distillation unit; and separating the water and the organic material in the filtrate to recover at least 7 to 8% of the remaining solvent.
Owner:TATA STEEL

Indoor achieving method for in-situ micro-sitting selection of wind power plant

PendingCN108897932AHigh precisionSolve the inability to grasp the actual topography of the siteGeometric CADScene recognitionSimulationHuman power
The invention belongs to the technical field of wind power plant micro-sitting selection, and particularly relates to an indoor achieving method for in-situ micro-sitting selection of a wind power plant. The unmanned aerial vehicle aerial photography technology, the geographic information system technology and the image recognition technology based on deep learning are adopted, a true wind power plant scene is subjected to three-dimensional visualizing presentation on a desktop, electric route optimization and road and hoisting platform optimizing results are integrated in wind power generatorarrangement optimization, an original design scheme is placed in an on-site actual scene to be verified, and design optimization in a three-dimensional interaction environment is achieved; the problems that during indoor work, on-site actual topographies and landforms cannot be mastered, and the artificial perception efficiency of sensitive surface features is low are solved, the precision of micro-sitting selection is improved, personnel safety is guaranteed, the manpower and time cost of on-site business trips is reduced, the investment income of owners is greatly increased, and the work period is shortened; the work efficiency is greatly improved, dangerous factors are eliminated from the source, and remarkable technical and economic benefits are achieved.
Owner:POWERCHINA XIBEI ENG

A method and system for evaluating the life cycle economy of an optical storage and charging integrate power plant

A method and system for evaluating the life cycle economy of an optical storage and charging integrate power station. As the chemical battery is considered as the energy storage system scenario, aiming at the annual maximum profit of the charging station of photovoltaic electric vehicle considering the life cycle cost of the energy storage battery, a life cycle profit model of optical storage andchar integrated pow plant is established, a multi-population genetic algorithm is used to solve the revenue model to determine the optimal photovoltaic and energy storage capacity when the revenue ismaximized, and then combined with the establishment of technical and economic benefits and financial benefit index mathematical model and probability model to establish the economic benefit evaluationmodel of the whole life cycle of the integrated photovoltaic, storage and charging power plant for economic benefit evaluation. The method and system well verify the necessity of adding the battery energy storage to the photovoltaic vehicle charging station and the best benefit possibility by establishing a model for evaluating the whole life cycle economy of the photovoltaic storage and chargingintegrated power station and evaluating the economy under different photovoltaic storage capacity configurations.
Owner:CHINA ELECTRIC POWER RES INST +1

Sleeve-retractable type automatic opener-mutgun

The invention discloses a sleeve-retractable type automatic opener-mutgun. The sleeve-retractable type automatic opener-mutgun is characterized in that two rotary bearings are respectively fastened with two vertical telescopic arms on the ground, wherein two horizontal telescopic arms are respectively fastened with the rotary bearings; front ends of the two horizontal telescopic arms are connected with a horizontal platform; the platform is provided with a burn-through mechanism, a hole plugging mechanism and a slagging-off mechanism; a slag pulling and drill rod replacing mechanism is also arranged above a working platform. The sleeve-retractable type automatic opener-mutgun has the following techno-economic effects that a complete set of device is electrically driven and can be automatically operated and controlled in long distance; the condition that a human body is in the bad high-temperature environment for a long time is avoided; the potential safety hazard is reduced. When the opener-mutgun works, the opener-mutgun is capable of rotating, extending and retracting for transmitting tools to workstations; the opener-mutgun can be retracted by rotating at ordinary times, so that the space is saved; the damage to the device caused by high-temperature roasting can be avoided; by using a pneumatic transmission manner, a furnace mouth is safely plugged; all the mechanism can independently act without interference, so that the reliability is high; the condition that operators stays in the poor high-temperature environment for a long time is avoided; the labor intensity is effectively alleviated; the production efficiency is increased; the potential safety hazard is reduced.
Owner:DALIAN HUARUI HEAVY IND GRP CO LTD

An investment comparison and selection method of distribution network scheme based on optimal solution

InactiveCN109272419AImprove the level of technical and economic analysisImprove scienceResourcesSystems intergating technologiesEuclidean distanceProject planning
The invention relates to an investment comparison and selection method of distribution network schemes based on an optimal solution, comprising the following steps: A, constructing a quantifiable lifecycle cost-benefit index of a distribution network project. B, determining the weight of each index and the optimal solution of the TOPSIS method. C, calculating the closeness degree between each scheme and the optimal solution by using the grey correlation degree and the Euclidean distance so as to select the optimal distribution network investment scheme. For the comparison and selection requirement of the distribution network project planning, applicable life-cycle cost-effectiveness and socio-environmental indicators are established, which can reflect the pros and cons of the distributionnetwork planning project comprehensively, and puts forward the comprehensive evaluation model of grey relational degree based on TOPSIS, the method can standardize the technical and economic optimization comparison and selection of distribution network planning, realize the quantitative analysis and comparison of distribution network planning schemes, improve the technical and economic analysis level of distribution network planning, and improve the scientificity and rationality of distribution network planning.
Owner:ECONOMIC TECH RES INST STATE GRID QIANGHAI ELECTRIC POWER

Development of a techno-economic process for organo refining of coal

An improved organo-refining process to produce low ash clean coal from high ash coal, comprising: mixing coal, solvent and a co-solvent to produce a slurry; feeding the slurry to a reactor by pumping; extracting a coal-solvent mixture from the reactor; feeding the extracted mixture to a flasher unit; recovering about 30% of the solvent from the flashing unit; feeding the remaining heavy material to an evaporator; extracting about 60% of solvent from the evaporator; discharging the residue from the evaporator to a precipitator having water which produces a coal slurry; filtering the slurry in a rotary drum; collecting the super clean coal as a residue and feeding the filtrate into a distillation unit; and separating the water and the organic material in the filtrate to recover at least 7 to 8% of the remaining solvent.
Owner:TATA STEEL

Dynamic evaluation method for running state of integrated energy system

A dynamic evaluation method for the running state of an integrated energy system comprises the steps that firstly, multi-stage data of the integrated energy system are collected, and an index system including the technical, economic and environment-friendly integrated energy system is constructed; secondly, analyzing the influence of the indexes on the running state of the integrated energy system, dividing the indexes into benefit type indexes and cost type indexes, and calculating to obtain a standard index matrix; thirdly, inviting an expert group to carry out importance sorting on the index system, comprehensively considering influence factors of experts, and applying a group G1 method to obtain an index weight; then, a TOPSIS method is used, an absolute ideal solution is set, and the close degree is solved; and finally, according to the operation state characteristics of the multi-stage comprehensive energy system, performing dynamic evaluation by using a double-excitation control line principle. According to the method, one-sided reflection of a single type of index on the running state of the integrated energy system is avoided, the development trend of the integrated energy system is considered, the evaluation result can be more comprehensive, and the method is of great significance in guiding running and planning of the integrated energy system.
Owner:CHANGSHA UNIVERSITY OF SCIENCE AND TECHNOLOGY

Evaluation Method for Economic Feasibility of Energy Saving Technology for Renewable Energy

The invention relates to the field of computer software, and discloses an evaluation method for the economic feasibility of the energy-saving technology for renewable energy to provide reference for different decision-makers and promote the energy-saving technology for renewable energy. The method comprises the steps of a, determining evaluation indexes; b, establishing a triangular fuzzy number-analytic hierarchy process-data envelopment comprehensive evaluation model; and c, solving the comprehensive evaluation model. The initial cost, adjusted cost, base cost and incremental cost can be analyzed comprehensively based on the scheme of the invention, so as to increase the consumer acceptance considering the cost, provide a reference for different decision makers and promote the energy-saving technology for renewable energy.
Owner:SICHUAN AGRI UNIV

Establishment of historical power grid typical engineering resource database

The invention discloses an establishment of a historical power grid typical engineering resource database includes collecting historical engineering data, state grid general engineering costs and Electric Power Planning & Engineering Institute quota data, constructing a critical parameter library according to an engineering type, building a scientific and reasonable engineering cost contrastive analysis model by means of informatization, and realizing an intellectualized contrastive analysis for the engineering costs in order to assist the development of a techno-economics assessment. The application of the invention provides a support for an engineering cost management and control analysis. The invention has the advantages of establishing general engineering cost, costs of each engineering phase and costs of engineering with the same scale and similar type to assist comparative censor through an engineering cost database according to an engineering cost management requirement, carrying out engineering cost analysis, concluding rules and experience and providing the basic data reference and support for a subsequent engineering cost job, making full use of data mining technology and depending on the huge engineering cost database.
Owner:STATE GRID CORP OF CHINA +2

School comprehensive energy system technology economy evaluation method and system

PendingCN112446630AEliminate the steps that require consistency checksOvercome the problem of index failureResourcesEnergy technologyIntegrated energy system
The invention relates to a school comprehensive energy system technical economy evaluation method and system, and the method comprises the following steps: constructing a technical economy evaluationindex system of a to-be-evaluated project, wherein the evaluation index system comprises 10 indexes in the aspects of technology, economy and environment, 8 indexes are quantitative indexes, and 2 indexes are qualitative indexes; inputting the evaluation indexes into an established technical economy evaluation model, wherein the technical economy evaluation model comprises the weight and evaluation method of each index; and determining the weight by adopting an order relation analysis method and an anti-entropy weight method, and evaluating the technical economy of the school comprehensive energy system by applying a TOPSIS method of introducing the weight. The school comprehensive energy system technology economy evaluation method and system can scientifically and reasonably evaluate theschool comprehensive energy technology economy, and have high use value.
Owner:SKILLS TRAINING CENT STATE GRID LIAONING ELECTRIC POWER +2

Sanitary ceramic green product authentication implementation effect evaluation method

The invention discloses a sanitary ceramic green product authentication implementation effect evaluation method, and belongs to the technical field of green product evaluation. Based on a series of general standards such as green (ecological design) product evaluation rules established in China and European Union product environment footprint influence types, the implementation effect of sanitaryceramic green product authentication is evaluated and studied. The green product connotation is deconstructed from four aspects of society, economy, environment and quality, and a sanitary ceramic green product authentication implementation effect evaluation index system is established and comprises three first-level indexes of technical economic benefits, social benefits and ecological environment benefits. the weight of each index in the evaluation index system is determined by adopting an analytic hierarchy process, and membership analysis is carried out on the index system by adopting a fuzzy comprehensive evaluation method to obtain a grade interval of the indexes. Scientific and operable technologies and methods are provided for evaluation of the authentication implementation effectof typical sanitary ceramic green products, and a scientific basis is provided for optimizing authentication management decisions. The evaluation technology is wide in application range and high in operability.
Owner:BEIJING UNIV OF TECH

Intelligent power grid technology maturity evaluation method based on TRL

InactiveCN105956741AFully excavatedExploring Statistical LawsResourcesLower gradeSmart grid
The invention discloses a TRL-based smart grid technology maturity evaluation method, constructs an evaluation system, and stores three first-level indicators of established technical performance, technical and economic value, social and environmental impact and its two-layer lower-level indicators in one indicator In the database; evaluate the technical performance indicators using the grade evaluation method, and decide whether to evaluate the other two indicators; use the extreme value processing method to normalize the three-level indicators in the index database; use the extreme value processing Obtain the normalized results of technical performance; use the ordinal relationship-coefficient of variation method to determine the weight of the normalized indicators and the determined secondary indicators of technical and economic value, social and environmental impact; synthesize the indicators after weight determination Evaluation, get the scores of indicators at all levels and technology maturity scores, and analyze the uncertainty. The invention can effectively avoid the singleness and one-sidedness of the evaluation, and has certain significance for grasping the information of the power grid macroscopically.
Owner:TIANJIN UNIV

Power system planning operation optimization method considering new energy output uncertainty

The invention discloses an electric power system planning operation optimization method considering new energy output uncertainty. The method comprises the following steps: acquiring technical economic characteristic data of a power grid, new energy power generation, a load and various controllable equipment; according to the obtained data, by taking the maximum new energy bearing capacity and the minimum system network loss, investment cost and operation as optimization objectives, establishing a power system planning operation optimization model P1 considering the uncertainty of new energy output; according to the established optimization model P1, using a relaxation technology to process nonlinear constraints in the model to obtain a relaxation model P2; according to the relaxed model P2, performing conversion processing on the constraint of the new energy unit about uncertainty to obtain an optimization model P3; solving the model P3, and updating the model P3 according to a solving result; and repeatedly solving and updating the P3 until the iteration termination condition is met, and outputting the optimal bearing capacity of the new energy, the controllable equipment investment and the scheduling operation scheme. The method can be applied to the fields of power grid investment planning, new energy maximum bearing capacity optimization, new energy uncertainty consumption, distributed energy site selection, distributed energy overall configuration operation optimization, efficiency and benefit optimization and the like.
Owner:XI AN JIAOTONG UNIV

Selection method and system for aboveground public gas pipeline material

The invention discloses a selection method and a selection system for an aboveground public gas pipeline material. The selection method comprises the steps of: A, analyzing failure risk factors of a gas pipeline according to the operation data of the gas pipeline; B, performing corrosion evaluation on the gas pipeline according to environmental conditions; C, predicting service life of the gas pipeline according to the environmental conditions; D, performing economic loss analysis and whole life cycle cost evaluation according to the environmental conditions; E, and selecting a material of thegas pipeline according to techno-economic comparison and the existing urban gas standards. The selection method and the selection system perform selection according to performance indexes of the environmental conditions and material economic indexes, can better satisfy safety and economical requirements of the aboveground public gas pipeline in the actual operating conditions, select the gas pipeline material favorably and reasonably, and can effectively avoid failure of the pipeline material caused by environmental factors, thereby being capable of guaranteeing using safety of the pipeline material with the designed life, and reducing economic loss.
Owner:SHENZHEN GAS CORP +1

Expressway operation integration optimization and evaluation method

InactiveCN103646372AGive full play to energy saving performanceData processing applicationsTechnology readinessFully developed
The invention provides an expressway operation integration optimization and evaluation method. By using the method, energy saving and efficiency of the expressway operation can be fully developed. The method comprises the following steps of (1) inputting a parameter to an energy saving technology database; (2) evaluating technology suitability and outputting a result to the energy saving technology database, wherein an evaluation of the technology suitability comprises technical feasibility of an energy saving technology, technical economy and technical development potential; (3) evaluating the technology energy saving performance and outputting a result to the energy saving technology database, wherein a technology energy saving performance evaluation comprises a technology energy saving effect, technology energy saving cost and technology readiness; (4) according to the technology suitability evaluation result and the technology energy saving evaluation result provided by the energy saving technology database, carrying out a technology integration optimization evaluation; according to an actual application target and an energy saving target, carrying out integration and optimization on three aspects of the technology, the management and the readiness from a system angle, and finally outputting the integration optimization evaluation result.
Owner:RES INST OF HIGHWAY MINIST OF TRANSPORT +2

Renewable energy base development technology economic evaluation system

InactiveCN110443443AMeeting Economic Assessment NeedsTechnology managementResourcesEngineeringLoad following power plant
The invention discloses a renewable energy base development technology economic evaluation system. The system comprises a basic data entry module, a renewable energy development potential evaluation module, a power load demand analysis module, a renewable energy development cost calculation and comparative analysis module and a historical database. The system can meet economic evaluation requirements of renewable energy base development technologies, is compatible with characteristics of global renewable energy distribution and development data, and supports data networking. Meanwhile, the system is suitable for the new situation of the current international energy Internet, can achieve the evaluation of the renewable energy development modes of different regions in the world, and providesa scientific guidance and support tool for the planning and development of a global renewable energy base.
Owner:TIANJIN UNIV +2

Technical and economic analysis and calculation method for comprehensive intelligent energy project

The invention discloses a technical and economic analysis and calculation method for a comprehensive intelligent energy project. The method comprises the steps of obtaining construction content, technical and economic analysis boundary conditions and income and cost boundary conditions contained in the comprehensive intelligent energy project; obtaining corresponding fee obtaining basis and corresponding income tax deduction and value-added tax refund preferential policies for different parts of the construction content; performing calculating according to the obtained data to obtain year-by-year total income and total cost of the whole comprehensive intelligent energy project; and finally, calculating the investment yield and the project recovery age limit of the whole project. The methodis applied to a comprehensive intelligent energy project scheme making stage; the problem that the investment yield and the project recycling life of the whole project cannot be calculated at a timedue to various construction contents contained in the comprehensive intelligent energy project and different technical and economic analysis fee obtaining bases, income tax reduction and remission policies and value-added tax refund policies of all the construction contents can be effectively solved.
Owner:SHANGHAI POWER EQUIP RES INST

Evaluation method and device for high-temperature superconducting cable access system

The invention provides an evaluation method and device for a high-temperature superconducting cable access system, and the method comprises the steps: obtaining related parameters of a superconducting cable, and calculating technical and economic indexes according to the related parameters of the superconducting cable; wherein the technical and economic indexes comprise a power supply reliability index, a transferred electric quantity, a short-circuit current, a line loss rate and a whole life cycle cost; grading the technical and economic indexes through a rank sum ratio method to obtain interval values of index grading; taking the interval value of the index grading as a parameter of a membership function, and scoring the technical and economic indexes to obtain score values of the technical and economic indexes. According to the method, characteristics of a power grid planning classic evaluation method and a superconducting power transmission system are combined, and the indexes can be graded and the to-be-selected schemes can be quantitatively evaluated no matter when the comparison index difference is not large or the to-be-selected schemes are more.
Owner:GUANGDONG POWER GRID CO LTD +1

Axle box hole measuring device and its application method

The invention relates to the technical field of diesel locomotive, in particular to an axle-hang box hole measuring device and a using method thereof. The device comprises a checking tool plate, a main checking shaft and an auxiliary checking shaft, a shaft sleeve and a shaft hole are disposed on the checking tool plate, and the main checking shaft and the auxiliary checking shaft are inserted into the shaft sleeve and the shaft hole respectively. The hole measuring device is manufactured according to actual size of a part, actual assembly state is simulated, whether each hole site of an axle-hang box is qualified or not is checked according to whether the main checking shaft and the auxiliary checking shaft can smoothly penetrate through a support frame hole and an installing hole of the axle-hang box or not, the device is simple, practical, convenient and rapid, the efficiency is greatly improved, simultaneously the manufacturing of the hole measuring device is simple, the cost is low, and good techno-economic effect is achieved.
Owner:CRRC QISHUYAN CO LTD

A micro-site selection system for high-altitude mountain wind farms

The invention discloses a microcosmic location selection system of a high-altitude mountain wind power plant. The microcosmic location selection system is formed in a way that a data input module, a preprocessing module, a scheme database, a microcosmic location selection module, a power generation amount calculation module, a technical economy module and a data output module are connected in sequence, wherein the microcosmic location selection module is also independently connected with an electronic module and a civil engineering module; and the technical economy module is also independently connected with the electronic module and the civil engineering module. The microcosmic location selection system integrates professional templates of specialties including a technology specialty, an electronic specialty, a civil engineering specialty, a techno-economic specialty and the like in a wind power plant engineering design specialty, can lower a manual intervention rate while convenience is brought for coordinated management, minimizes human factor influence, improves the consistency and the accuracy of the microcosmic location selection design achievement of the high-altitude mountain wind power plant, realizes the intellectualization, the systematization and the high efficiency of microcosmic location selection work, and solves the difficulty that microcosmic location selection can not be accurately and reasonably carried out in the design of the high-altitude mountain wind power plant.
Owner:ENERGY CHINA YNPD

A Method for Optimizing Borehole Trajectory in Horizontal Well Drilling

The invention discloses a horizontal well drilling borehole trajectory optimization method and belongs to the technical field of oil and gas development. The optimization method comprises the steps of: determining n technical and economic indicators related to optimization of a wellbore trajectory in a horizontal well, the technical and economic indicators comprising at least one engineering technical indicator and at least one economic indicator; establishing m horizontal well drilling well trajectories; obtaining the values of each technical economic indicator corresponding to each horizontal well drilling well trajectory; normalizing the value of each technical economic indicator corresponding to the drilling trajectory of each horizontal well; determining the weight value of each technical economic indicator; calculating the combined utility values of the wellbore trajectories for each horizontal well separately, wherein the combined utility value is the sum of the value of each technical economic indicator in the wellbore trajectory of each horizontal well, and the sum of the normalized value and the corresponding weight value; determining the optimal horizontal well drillingwell trajectory based on the combined utility value of each horizontal well drilling well trajectory.
Owner:PETROCHINA CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products